ML18267A176

From kanterella
Jump to navigation Jump to search
LIC-114 (NRR) - REG-106 (Nro), Title 10 of the Code of Federal Regulations (10 CFR) 52.103(g) Finding and Communication Process, Appendix C
ML18267A176
Person / Time
Issue date: 01/21/2019
From: Frederick Brown, Ho Nieh
Office of New Reactors, Office of Nuclear Reactor Regulation
To:
Colaccino J
Shared Package
ML18267A001 List:
References
NRO-REG-106, NRR-LIC-114
Download: ML18267A176 (2)


Text

Appendix C MEMORANDUM TO: Chairman [surname]

Commissioner [surname]

Commissioner [surname]

Commissioner [surname]

Commissioner [surname]

FROM: [name], Director Office of Nuclear Reactor Regulation

SUBJECT:

FINDING IN ACCORDANCE WITH 10 CFR 52.103(g)

THAT ALL ACCEPTANCE CRITERIA ARE MET FOR

[plant name]

In a Memorandum to the Commission dated [XX/XX/XXXX], the staff provided the status of inspection and licensing activities related to the closure of inspections, tests, analyses and acceptance criteria (ITAAC) for [plant name]. In addition, the staff provided the status of inspection activities related to operational programs. The staff has now completed all ITAAC notification reviews and all ITAAC-related inspections.

[Include paragraph, if necessary, on the status of any ITAAC hearing and interim operation determination.]

The staff has determined that [licensee name] has met all the acceptance criteria in Appendix C of the [plant name] combined license [license #]. The basis for the finding is included in a basis document that is publicly available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. [MLXXXXXXX] and is also on the public website: [hyperlink to public web site]. Therefore, the staff is ready to make a finding that the acceptance criteria are met, under 10 CFR 52.103(g). The staff will make the 10 CFR 52.103(g) finding on

[3 calendar days from the date of this memorandum]. When the 10 CFR 52.103(g) finding is made [and an interim operation order issued], the licensee will be able to commence operation of the facility.

A Federal Register Notice (draft available at ADAMS Accession No. [MLXXXXXXX]) will be issued announcing the 10 CFR 52.103(g) finding. A letter will also be sent to the licensee (draft available at ADAMS Accession No. [MLXXXXXXX]).

The inspection of operational programs, which are not linked to the 10 CFR 52.103(g) finding with the exception of emergency planning ITAAC, continue. Enclosure 1 includes a table providing the status of operational program inspections. [Summarize the staffs assessment of operational program implementation, including whether there are any significant issues arising from the operational program inspections that require NRC action.]

Enclosure:

Operational Program Inspection Status Table CONTACT: First M. Last, OFC/DIV 301-xxx-xxxx

Operational Program Inspection Status Table Operational Program Implementation Scheduled or Inspection Report Milestone Actual Number (ADAMS Implementation Accession Number)

Date Enclosure