NRR E-mail Capture - D.C. Cook Nuclear Plant Unit 1 - Acceptance of Alternative Request ISIR-4-08
ML18250A315
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/06/2018
From: Dietrich A
Plant Licensing Branch III
To: Levendosky H
Indiana Michigan Power Co
References
L-2018-LLR-0106
Download: ML18250A315 (3)


Text

1 NRR-DMPSPEm Resource From:

Dietrich, Allison Sent:

Thursday, September 6, 2018 2:15 PM To:

Helen L Levendosky Cc:

Joe Tanko (jmtanko@aep.com)

Subject:

D.C. Cook Nuclear Plant Unit 1 - Acceptance of Alternative Request ISIR-4-08 (EPID L-2018-LLR-0106)

By letter dated August 1, 2018 (Agencywide Documents Access and Management System Accession No. ML18215A179), Indiana Michigan Power Company submitted a relief request for the Donald C. Cook Nuclear Plant, Unit No. 1, related to reactor vessel weld examination requirements.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this relief request.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR),

the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 5 months, which is January, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review.

Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at 301-415-3826.

Sincerely,

2 Allison W. Dietrich, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3826

Hearing Identifier:

NRR_DMPS Email Number:

553 Mail Envelope Properties (Allison.Dietrich@nrc.gov20180906141400)

Subject:

D.C. Cook Nuclear Plant Unit 1 - Acceptance of Alternative Request ISIR-4-08 (EPID L-2018-LLR-0106)

Sent Date:

9/6/2018 2:14:51 PM Received Date:

9/6/2018 2:14:00 PM From:

Dietrich, Allison Created By:

Allison.Dietrich@nrc.gov Recipients:

"Joe Tanko (jmtanko@aep.com)" <jmtanko@aep.com>

Tracking Status: None "Helen L Levendosky" <hllevendosky@aep.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3174 9/6/2018 2:14:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: