Attachment - Vogtle Electric Generating Plant Unit 3 LAR 18-010
ML18232A531
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 09/25/2018
From:
Office of New Reactors
To:
Southern Nuclear Operating Co
HOELLMAN J/415-5481
Shared Package
ML18232A526 List:
References
EPID L-2017-LLA-0109, LAR 18-010
Download: ML18232A531 (3)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 143 TO FACILITY COMBINED LICENSE NO. NPF-91 DOCKET NO.52-025 Replace the following pages of the Facility Combined License No. NPF-91 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Combined License No. NPF-91 REMOVE INSERT 7 7 Appendix C to Facility Combined License No. NPF-91 REMOVE INSERT C-294 C-294

(7) Reporting Requirements (a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).

(b) SNC shall report any violation of a requirement in Section 2.D.(3),

Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 143, are hereby incorporated into this license.

(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).

(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:

(a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program

1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 Amendment No. 143

Table 2.5.2-3 PMS Automatically Actuated Engineered Safety Features Safeguards Actuation Containment Isolation Automatic Depressurization System (ADS) Actuation Main Feedwater Isolation Reactor Coolant Pump Trip CMT Injection Turbine Trip (Isolated signal to nonsafety equipment)

Steam Line Isolation Steam Generator Relief Isolation Steam Generator Blowdown Isolation Passive Containment Cooling Actuation Startup Feedwater Isolation Passive Residual Heat Removal (PRHR) Heat Exchanger Alignment Block of Boron Dilution Chemical and Volume Control System (CVS) Makeup Line Isolation Steam Dump Block (Isolated signal to nonsafety equipment)

Main Control Room Isolation, Air Supply Initiation, and Electrical Load De-energization Auxiliary Spray and Purification Line and Zinc/Hydrogen Addition Isolation Containment Air Filtration System Isolation Normal Residual Heat Removal Isolation Refueling Cavity and Spent Fuel Pool Cooling System (SFS) Isolation In-Containment Refueling Water Storage Tank (IRWST) Injection IRWST Containment Recirculation CVS Letdown Isolation Pressurizer Heater Block (Isolated signal to nonsafety equipment)

Containment Vacuum Relief Component Cooling System Containment Isolation Valve Closure Table 2.5.2-4 PMS Manually Actuated Functions Reactor Trip Safeguards Actuation Containment Isolation Depressurization System Stages 1, 2, and 3 Actuation Depressurization System Stage 4 Actuation Feedwater Isolation Core Makeup Tank Injection Actuation Steam Line Isolation Passive Containment Cooling Actuation Passive Residual Heat Removal Heat Exchanger Alignment IRWST Injection Containment Recirculation Actuation Main Control Room Isolation, Air Supply Initiation, and Electrical Load De-energization Steam Generator Relief Isolation Chemical and Volume Control System Isolation Normal Residual Heat Removal System Isolation Containment Vacuum Relief C-294 Amendment No. 143