Summary of a Public Pre-Submittal Meeting with Nuclear Development, LLC, on the Bellefonte Nuclear Generating Station, Units 1 and 2
ML18232A326
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 09/04/2018
From: Bill Gleaves
NRC/NRO/DLSE/LB4
To: Jennifer Dixon-Herrity
NRC/NRO/DLSE/LB4
GLEAVES B/415-5848
References
Download: ML18232A326 (4)


Text

September 4, 2018 MEMORANDUM TO: Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: William (Billy) Gleaves, Sr. Project Manager /RA/

Licensing Branch 4 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors

SUBJECT:

SUMMARY

OF A PUBLIC PRE-SUBMITTAL MEETING WITH NUCLEAR DEVELOPMENT, LLC, ON AUGUST 14, 2018 On August 14, 2018, a Category 1 meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Nuclear Development, LLC (ND, LLC). The purpose of the meeting was to introduce the members of ND, LLC and to discuss issues associated with the submittal of a request to transfer the deferred construction permit for Bellefonte Nuclear Generating Station (BLN), Units 1 and 2. The meeting started at 10:01 a.m.and ended at 10:38 a.m.

The meeting notice and agenda can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18213A015. The meeting notice and agenda were also posted on the NRC public website. The meeting agenda is provided as . A list of attendees is provided as Enclosure 2.

CONTACT: Billy Gleaves, NRO/DLSE/LB4 (301) 415-5848

J. Dixon-Herrity Summary of Meeting On August 14, 2018, the NRC staff conducted a Category 1 public meeting at the request of Nuclear Development, LLC, (ND) to introduce plans associated with BLN, Units 1 and 2, located in Hollywood, AL. After the initial introductory comments by NRC staff, ND staff addressed the following general plans for the Bellefonte Nuclear Generating Station, Units 1 and 2 (BLN):

- The transfer from Tennessee Valley Authority to ND of the currently deferred construction permit (CP). More details on the construction and licensing schedules will be released prior to the operating license application. The ND staff suggested that in the near-term, resources for the review of the CP transfer would be necessary. The ND staff also stated that they understand our licensing and inspection planning needs.

- The initiation of the licensing process is tied to commercial financing.

- ND is in the process of standing up a licensing lead organization.

- ND staff discussed its intention to use the 10 CFR Part 50 licensing process.

- ND staff discussed the work needing to be done prior to initiating construction, such as, the engineering baseline plant walkdowns, completion of engineering review, and the issuance of engineering packages. Their plan is to ensure that engineering is complete early in the process so that construction can go smoothly.

- ND staff stated their plan to put in place a quality assurance program for the site once the CPs are transferred.

- ND plans to close on the BLN purchase in November 2018.

- ND plans to complete detailed schedules in December 2018.

- ND estimated that licensing activities will start in 2019.

No specific future date for a meeting was discussed or requested.

There was an opportunity for the public to provide comments and ask questions. All comments and questions from members of the public were addressed before ending the meeting.

Docket Nos. 50-438 and 50-439

Enclosures:

As stated cc: See next page

ML18232A326 *via e-mail NRC-008 OFFICE PM: DLSE/LB4 LA: DLSE/LB4 BC: DLSE/LB4 PM: DLSE/LB4 NAME WGleaves (c) IBetts for RButler (c) JDixon-Herrity (c) WGleaves (s)

DATE 8/24/18 8/22/18 8/28/18 8/24/18 AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Tuesday, August 14, 2018 10:00 a.m. - 11:00 a.m.

PURPOSE: To introduce the members of Nuclear Development, LLD, and to discuss issues associated with the submittal of a request to transfer the deferred construction permit for Bellefonte Nuclear Generating Station (BLN), Units 1 and 2.

OPEN Time Topic Led By 10:00 a.m. Opening Remarks NRC 10:05 a.m. Presentation on Bellefonte NPS by ND, LLC NRC/ND, LLC 10:50 a.m. Opportunity for Public Comment PUBLIC/NRC 11:00 a.m. Adjourn NRC Enclosure 1

PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Tuesday, August 14, 2018 10:00 a.m. - 11:00 a.m.

List of Attendees ATTENDEE ORGANIZATION Representing the U.S. Nuclear Regulatory Commission Robert Taylor NRO/DLSE David Roth NRC/OGC Scott Burnell NRO/OPA Terry Jackson NRO/DCIP/QVIB1 Billy Gleaves NRO/DLSE/LB4 Jennifer Dixon-Herrity NRO/DLSE/LB4 Michael Dusaniwskyj NRR/DLP/PFPB Kara McCullagh NSIR/DPR/RLB Olivier Lareynie NRO/DLSE/LB3 Jordan Hoellman NRO/DLSE/LB4 Brett Titus NRR/DLP/PBEB John Burke NRO/DCIP/CIPB Mike Ernstes* NRC/RGN II Shakur Walker* NRC/RGN II Mike Webb* NRC/DCIP/CIPB Carl Weber* NRC/DCIP/CIPB Representing ND, LLC William McCollum, Jr. ND, LLC Timothy Patrick Morgan Lewis Bockius, LLC Representing Public Victor Trebules TerraNear Russ Bell NEI Neil Haggarty Excel Services Paul Ouellette* EPM Inc Patrick Whitten* Framatome Farshid Shahrokhi* Framatome Gary Peters* Framatome Jim Chardos* TVA Ryan Dreke* TVA Erin Henderson* TVA John Lockaby* TVA Dan Stout* TVA Jana Bergman* Curtis Wright Enclosure 2

ATTENDEE ORGANIZATION Larry Lust* Nuclear Development Stephen Burdick* Morgan Lewis Kathryn Sutton* Morgan Lewis Blue Ridge Environmental Defense Sandra Kurtz*

League Blue Ridge Environmental Defense Garry Morgan*

League Maggie Shober* Southern Alliance for Clean Energy David Flessner* Chattanooga Times Free Press Bill Freebairn* Platts Marie Gillman* SNC Lavalin Thomas Goff* Self Justin Huber* Self Brian Kelly* Self David LaFever* Self Robert Phillips* Self Doug Pollock* Self Robert Haemer* American Electric Power Walter Justice* Navcon Consulting Services Tatsro Kobayashi* Tokyo Electric Power Co.

Bill Matthews* Allied Technical Resources Matt Montz* Dunn and Company Danny Mullins* Bellefonte Nuclear Plant Gary Poole* Self Sharon Thomas* DOE Brandon Waites* Southern Company

  • = participated via teleconference Enclosure 2

COL - Bellefonte Mailing List (Revised 1/11/13) cc:

Mr. K. D. Stinson Mr. A. J. Simonti Vice President, Bellefonte Project General Manager Tennessee Valley Authority Bellefonte Technical Services 2744 Bellefonte Road, OSB-1A Tennessee Valley Authority Hollywood, Alabama 35752 2744 Bellefonte Road, OSB-1A Hollywood, Alabama 35752 Mr. M. C. Bryan Manager (Acting), Licensing State Health Officer Bellefonte Nuclear Plant, Units 1 and 2 Alabama Dept. of Public Health Tennessee Valley Authority P.O. Box 303017 2744 Bellefonte Road, OSB-1A Montgomery, AL 36130-3017 Hollywood, Alabama 35752 Chairman Mr. P. D. Swafford Jackson County Commission Chief Nuclear Officer and Courthouse Executive Vice President Scottsboro, AL 35752-0200 Tennessee Valley Authority 1101 Market Street Director Lookout Place 3R Alabama Emergency Management Agency Chattanooga, TN 37402-2801 P.O. Drawer 2160 Clanton, AL 35045-5160 Mr. J. W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Mr. D. C. Romashko Senior Manager, Quality Assurance Tennessee Valley Authority Bellefonte Nuclear Plant 2744 Bellefonte Road, OSB-1A Hollywood, Alabama 35752 Mr. E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 400 West Summit Hill Drive West Tower 6A Knoxville, TN 37902 Page 1 of 2

COL - Bellefonte Mailing List (Revised 11/02/2017)

E-mail alsterdis@tva.gov (Andrea Sterdis)

APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham)

CumminWE@Westinghouse.com (Edward W. Cummins) cwaltman@roe.com (C. Waltman) david.lewis@pillsburylaw.com (David Lewis) ed.burns@earthlink.net (Ed Burns) eddie.grant@excelservices.com (Eddie Grant)

F.Shahrokhi@Framatome.com (Farshid Shahrokhi)

GovePA@BV.com (Patrick Gove) john.elnitsky@duke-energy.com (John Elnitsky)

Joseph_Hegner@dom.com (Joseph Hegner) kinneyrw@dhec.sc.gov (Ronald Kinney)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) lchandler@morganlewis.com (Lawrence J. Chandler) lgorenflo@gmail.com (L. Gorenflo) mark.a.giles@dom.com (Mark Giles) media@nei.org (Scott Peterson)

MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) pmray@tva.gov (Phil Ray) rgrumbir@gmail.com (Richard Grumbir)

RJB@NEI.org (Russell Bell) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) savance@tva.gov (Scott A. Vance) timothy.beville@nuclear.energy.gov (Timothy Beville) tom.miller@hq.doe.gov (Tom Miller)

Vanessa.quinn@dhs.gov (Vanessa Quinn)

Page 2 of 2