|
---|
Category:Drawing
MONTHYEARRA-20-0134, Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 2 of 22020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 2 of 2 ML20147A0422020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 1 of 2 ML19102A1522019-03-29029 March 2019 Amendment 62 to Final Safety Analysis Report, Drawings, Part 2 of 3 RA-19-0160, Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 32019-03-29029 March 2019 Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 3 ML19102A1512019-03-29029 March 2019 Amendment 62 to Final Safety Analysis Report, Drawings, Part 1 of 3 ML18230A9072018-08-18018 August 2018 Component Cooling Water System, 9.5-1, Amendment No. 10 ML18230A9472018-08-18018 August 2018 Map, Geologic Plan, Fault Intersection with West Dike 3 and West Dike 3S, Plate 5 ML18230A9102018-08-18018 August 2018 General Arrangement Reactor Auxiliary Building Plan Sheet 4, 1.1-8, Amendment No. 18 ML18230A9092018-08-18018 August 2018 General Arrangement Reactor Auxiliary Building Sections, 1.1-9, Amendment No. 18 ML18230A9392018-08-18018 August 2018 Map, Remote Sensing Lineaments, Composite Map, Place C-10 ML18230A9402018-08-18018 August 2018 Drawing, Side-Looking Airborne Radar Imagery Locations of Lineaments, Plate C-5 ML18230A9412018-08-18018 August 2018 Map, Side-Looking Airborne Radar Imagery Lineaments, Plate C-6 ML18230A9422018-08-18018 August 2018 Map, Side-Looking Airborne Radar Imagery Locations of Lineaments, Plate C-4 ML18230A9432018-08-18018 August 2018 Drawing, Side-Looking Airborne Radar Imagery Locations of Lineaments, Plate C-3 ML18230A9452018-08-18018 August 2018 Drawing, Plan View, Site Fault Investigation, Plate 2 ML18230A9462018-08-18018 August 2018 Map, Geologic Section at Fault, West Side of Plant Excavation, Plate 3 ML18230A9042018-08-18018 August 2018 Drawing, Single Unit Main One Line Diagram, 8.4-2, Amendment No. 15 ML18230A9082018-08-18018 August 2018 Emergency Core Cooling System, 6.1-1, Amendment No. 15, Sheet 1 of 2 ML18230A9302018-08-18018 August 2018 Figure A-4A, Site Geologic Map, Amendment 29 ML18230A9292018-08-18018 August 2018 Figure A-4B, Site Geologic Map Showing Reservoir and Class-1 Structures, Amendment No. 29 ML18230A9062018-08-18018 August 2018 Drawing, Sampling System, 9.7-1, Amendment No. 10 ML18230A9192018-08-18018 August 2018 Drawing, Service Water System, 9.8-1, Amendment No. 10 ML18230A9182018-08-18018 August 2018 Subsurface Investigation Plan, Auxiliary Dam and Spillway Sheet No. 4, 2.6-1f, Amendment No. 17 ML18230A9172018-08-18018 August 2018 Drawing, Subsurface Investigation Auxiliary Dam - Sheet No. 3, 2.6-1e, Amendment No. 17 ML18230A9162018-08-18018 August 2018 Map, Subsurface Investigation Plan Plant Area - Sheet No. 2, 2.6-1d, Amendment No. 19 ML18230A9152018-08-18018 August 2018 Drawing, Subsurface Investigation Plan Plant Area Sheet No. 1, 2.6-1c, Amendment No. 17 ML18230A9142018-08-18018 August 2018 Figure 3.2-28, Fuel Assembly Outline ML18230A9132018-08-18018 August 2018 General Arrangement Reactor Auxiliary Building Plan Sheet 2, 1.1-6, Amendment No. 18 ML18230A9122018-08-18018 August 2018 General Arrangement Reactor Auxiliary Building Plan Sheet 1, 1.1-5, Amendment No. 18 ML18230A9112018-08-18018 August 2018 General Arrangement Reactor Auxiliary Building Plan Sheet 3, 1.1-7, Amendment No. 18 ML18230A8962018-08-18018 August 2018 General Arrangement Turbine Building Mezzanine Floor Plan, Sheet 2, 1.1-17 ML18230A8782018-08-18018 August 2018 General Arrangement Reactor Auxiliary Building Sections, 1.1-9 ML18230A8862018-08-18018 August 2018 Drawing 2.6-1g, Subsurface Investigation Plan, Main Dam - Sheet No. 5 ML18230A8872018-08-18018 August 2018 Drawing 2.6-1h, Subsurface Investigation Plan, Main Dam Spillway - Sheet No. 6 ML18230A8822018-08-18018 August 2018 Drawing 2.6-1h, Subsurface Investigation Plan, Main Dam Spillway - Sheet No. 6 ML18230A8882018-08-18018 August 2018 Figure A-4B, Site Geologic Map Showing Reservoir and Class-I Structures, (Refer to Figure A-4A for Geologic Details) ML18230A8842018-08-18018 August 2018 Drawing 10.2-1, Steam and Feedwater Systems ML18230A8832018-08-18018 August 2018 Auxiliary Separating Dike, 2.6-30, Amendment No. 17 ML18230A8972018-08-18018 August 2018 Drawing, General Arrangement Turbine Building Operating Floor Plan Sheet 3, 1.1-18 ML18230A8902018-08-18018 August 2018 Auxiliary Dam - Plan, 2.6-28, Amendment No. 17 ML18230A8912018-08-18018 August 2018 Drawing, Main Dam Profile Section and Materials, 2.6-27a, Amendment No. 17 ML18230A8922018-08-18018 August 2018 Drawing, Subsurface Investigation Plan, Main Dam Sheet No. 5, 2.6-1g, Amendment No. 17 ML18230A8952018-08-18018 August 2018 Diesel Fuel Oil System, 9.14-1, Amendment No. 15 ML18230A9492018-08-18018 August 2018 Drawing, Reactor Vessel Schematic, 4.2-2 ML18230A8932018-08-18018 August 2018 General Arrangement Fuel Handling Building Sections, 1.1-15, Amendment No. 18 ML18230A8982018-08-18018 August 2018 Map, General Arrangement Turbine Building Ground Floor Plan, Sheet 1, 1.1-16 ML18230A9002018-08-18018 August 2018 Extraction Steam System, 10.2-2, Amendment No. 10 ML18230A8992018-08-18018 August 2018 Containment Spray System, 6.3-1, Amendment No. 13 ML18230A9012018-08-18018 August 2018 Figure 10.2-3, Feedwater Condensate and Air Evacuation System, Amendment No. 10 ML18230A9022018-08-18018 August 2018 Makeup Water System, 9.13-1 2020-05-15
[Table view] |
Text
>33FI 5 I KBCI Bol...
ST E A h/1 Ca E NE. R ATO R PEAOCSRAP4lvlE D mETFOINT I
SE ST EAIV1 CRENERATOFs'5 I
I
+R3 ST E A h/I Q E N E R AT'0R I
PE'OCTRAMMED
%ET PO1 NT LEVEL I
RE. DLIN D A IKIT'T'E AlK/I z TEAM cl CPW FLOW
>ROCSRAp/I IvIEO SETPDQINT I
1 I EVEL FEEDWATE.HS
'F L&K/v llloTE71I T.
F EEDVQATEFPI F L C7 W I
rB 8
I I
I-- J A 2 W-1 K
(IE DDA)
AuTD-HA14OA CONTROL STATloll T
GT-I +c. Tr5 E 8 DC I. g B)
K34F I4 5TATIO N NOTS I
hhOOUL AT E FEFQWATF R M AIM VALVE FC,V-4S8 (N)OTE 8)
PSODuL A.T E.
F'F E.D'AINT E.R.
'BY~A.SGS VALVE.
(FCU-,~H) iSOr F SEEM P R I'~PFpTURE CARD
, ~DB3i
- APP, APP.
SCALE
- APP, 6 I-lEEV l3 SUB! ll3 DIMENSIONS IN INCHES DFTG. SVPV, OO NOT SCALE 3
2 I
CEFDWA ER FE.LDAATE L F LC,W
'-LOVL/
Z
~("OTE7l I
I++32 DO F5 F5 498 c
I A 3 QAE3
,*7..<
~i Q
Z-K (I~/ 0 K 34 (I g)
AE/TO-Isl A SAILSALI C o PAsTqo L ST A'T I 0 PKI 1
4 I/LUTC - MANUAL CONTROL STAT IO N RED 'NDA t47 COI4PAN" pNO
'LFG pLAN'F AROEFNA NOCLEPR V,ER OSIER S,,EARON HA l'IEI'.
pLANl
,'ZAT 9:
A.,ON E<<ER p l C A1 99 FIHFlNEY R
~
L'A EE3O9 No.
E'O T NOR l TY E.lop.
LTR 3AIOTR ll 74CTTE I
MOI30LATE.
F E. EDWATKR BYPASS VALVIN.
(PC V-4c3e)
I'NOTE. 8)
Iv/IGDEIl ATf-F E.E.Dw A MAlN V Al FC.V-69S CAADTG p/3/ C~
DP'ID PALLF 3-I-/8 We Electric Corporation ~
NUClt+
1 i
4/FMS PETfSRURGH PA U S A TiTLE C I
YYER LIGHT'O SH HA IS UAIITS l>2,5 $+
F u hl C.T' bL,A AC@RAM 5 FEE.OWATE,RCP'I 50 LAT I 0 N 0
0 0
0 000 0
A 0 C HKR DES. ENG.
MFG..ENG.
MTLS. ERG.
5- /t9
~ 0 0
0 R
0 R
4I 4 0 0
g E 0
4 IU0 R0 IHi IRPORATEO E S ASEC SE RVI C 7A, 7'
3, AE 10006 496 A/3-7 6 DISCIPLINE COMMENTS DUE BY ENGINEERING DESIG DISCIPUNE PDA KC C
MECHANICAL CIVIL ARCH ELECTRECAL INSTR'N CONTROLS PLUMBING HVAC APPLIER PKYSICS WTR TREAT RADWASTE SHIELDING MATERIALS 6
RESS SUPP 6 RESTRAINTS CONST QAE PQAF M00EL PACILITI 4 REPRODUCIBLE ILLE GIRL E ADDRES STANDARD DISTRIBUTION 4968/7-7$
l364-g /1 I7 R&N133ii1 CAROLI.4 POWER 8 LIGHT COMPANY SHEARON HARRIS NUC EAR POWER PLANT 800 MW(41 UN TS 1-4 1984
~ 1990 Po QO AlQ+01TEM T
[
A I EIRI I PR I
-qiDQT'+///4 +Egg8TE CONTKOZ.g &SOD WT2ci4
- 5. 17
//ifjgo
'-/o-7/
A '*
E CU 1
V IEl O
Pl Pl Iz L7I/j O
10 STE AIK/I D TE AN4 FEEOVVATF-R
'1 E'EDAA/AETER F L OW
'LOvv'=LOW FLGW
&TEAS/I AEFIERAl'OQ C7 4
S I ~
Hl-Hl I FVEL I<FAC.TER +
- SIGNAL, T'F1 I P (SHE.E'T8) <><<ET 7)(.5HE E.TP) 514EE 4) 1 I
I 47 l
J (4 783 l 4.
7C 1 IPKN VA, I PC CODE 'T (INO TE. 4)
RE. DLINDASK4T AL T'0- 94AAILIAL CONTROL STATION CLOSE ALL F E E DVVATE R I SOLATION VALVES
( 13 9 o T Il E P, S)
(NO T'E, 3)
TRIP A LL FEE DWATF R P u PA/I P=D %
(PQO TE,5 f<.)
Tu RS I N4 E
'TRiP (Q HF E,'T l 5)
NOTES:
I.
ANALOG. GATE CONSISTS OF 2
SOLENOID VENT VALVES IN SERIES TO REDUNDANTLY INTERLOCK THE AIR LINE BETWEEN EACH VALVE DIAPHRAGM AND ITS ASSOCIATED PQSITIONER.
THE SOLENOID VALVES ARE DE-ENERGIZE TO VENT, CAUSING7 THE MAIN FEEDWATER VALVE TQ CLOSE IN 5 SECONDS.
2.
ALL CIRCUITS ON THIS SHEET ARE NQT REDUNDANT, EXCEPT WHERE INDICATED "REDUNDANT".
3.
OPEN/SHUT INDICATION FOR EACH FEEDWATER VA~VI= IN4 CONTROL ROOM.
4.
THE REDUNDANT MANUAL RESET CONSISTS OF TWQ MOMENTARY CONTROLS ON THE CONTROL BOARD, ONE FOR EACH TRAIN.
5.
TRIPPING OF FEEDWATER PUMPS CAUSES CLOSURE OF ASSOCIATED PUMP DISCHARGE VALVES.
6.
THE FEEDWATER PUMPS AND PUMP DISCHARGE VALVES ARE SUPPLIED BY 'OTHERS.
PECSTE
>I 7.
THE STEAM GENERATOR LEVEL SIGNAL 'ORIGIN MUST BE DIFFERENT FROM THAT WHICH IS USED ON SHEET 7
FOR THE LOW FEEDWATER FLOW REACTOR TRIP.
A/I0 DlgL AT F
'f L FGD VV4 T F R IK/FA I W U AL9 4 (FC.V -a~S>
CN4cpTW S) 1Sl CS~
wr ESI LO LU W
'LDz y r 2 (3
r 0
1 N
p lf MS X
LP O g 4 o z xo dl Q I-V V7 CB SEP IE7 8
KM(l~)
I KS+('
)
7 STEAM F LOW STF AMl F LOW
+
(4 8 8 A
2 Z.
LBE 47b 0
WIDE PA N C7 E L E V4 L C H A N N E L 5 STp/I. CSEN. 2
=- TM. CSE pl. 3.
1 I
POWE R RANGE N EUTROP4 FLUX ST/vl. C EPL I
I'--o t--o
'ux.
F.P
~
AUX F.P AU/C, F P, NTAAT1CPHI STATION STAT IOIAI I
l A U T0
- IvlA N VAL CONT ROL STAT l0 N Qz RE.DUND/6 NT 9 9 L N ElA SAE T MODULAR F.
FFF DWARF R BYFlA'DS U ALVE (FCU-479)
(N OTE 4)
(44O T E 1)