Letter Attached Revision 5 to Steam Generator Repair Report Containing New Sgrr Appendix & Modification to Some Existing Pages
ML18228A477
Person / Time
Site: Turkey Point  
Issue date: 08/04/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
Download: ML18228A477 (15)


Text

P~ oS'/e REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIBS)

DISTRIBUTION FOR INCOMING MATERIAL 0--2

/251 I

REC:

STEI LO Y ORG:

UIIRIG R E DOCDATE: 08/04/78 NRC FL j WR

8. LIGHT DATE RCVD: 08/07/78 DOCTYPE:

L - TTER NOTARIZED:

NO COPIES RECEIVED

SUBJECT:

LTR 3 ENCL 40 FORWARDING REVISION 5 TO APPLICANT"S STEAM GENERATOR REPT WHICH WAS SUBMITTED ON 09/20/77.. (

"Rs%iR PLANT NAME: TURKEY PT 83 REVIEWER INITIAL:

XJM

< ~~ aieiws '"""'"'"'":

C~~~

DISTRIBUTION OF-TI.IIS MATERIA I

AS FOLLOWS <<<<<<~<<<<<<~<<<<<<<<~<<

GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

(DISTRIBUTION COBE AOO1)

FOR ACTION INTERNAL:

BR Cl.l EF ORB$ 1 BC~~<<W/7 ENCL EG FIL

<<W/EN L I

~

>Wl2-ENCL NAUER~>>"W/ENCL AD FOR SYS 5 PROJ<<%W/ENCL REACTOR SAFETY BR<<4~W/ENCL, EEB~~<<W/ENCI J.

MCGOUGH4HIW/ENCL NRC PDR<<<<W/ENCL OELD+<<LTR ONLY CORE PERFORMANCE BR>+W/ENCL ENGINEERING BR<<W/ENCL PLANT SYSTEMS BR>>W/ENCL EFFLUENT TREAT SYS<<<W/ENCL EXTERNAL:

LPDR'S

MIAMI, I L<<<<W/ENCL TERA<<~~W/ENCL NSIC<<W/ENCt ACRS CAT B~~<<W/16 ENCL DISTRIBUTION:

LTR 40 ENCL 39 SIZE:

1P+39P THF END CONTROL NBR:

782200321

'L ~

1 4

FLORIDA POWER 8( LIGHTCOMPANY August 4,1978 L-78-255 Office of Nuclear Reactor Regul ation Attention:

Mr. Victor Stello, Director Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stello:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Steam Generator Repair Report Revision 5

Attached herewith is Revision 5 to our Steam Generator Repair Report which was forwarded to you on September 20, 1977 (L-77-206).

Revision 5 contains a new SGRR appendix and modifications to some existing SGRR pages.

With regards to the latter, only the actual portion of the page to be changed is indicated by a revision bar on the margin.

The attached Revision 5 package consists of the following:

(1)

Responses to Mr. A. Schwencer's request for additonal information dated April 13, 1978 are incorporated in the SGRR as Appendix C, (pages C-l-l through C-4-4 plus page 3-8 and table 3.2-1);

(2)

Revisions to Chapters 2 and 5 to incorporate the necessitated changes as a result of the lower assemblies tube bundle being 8 inches shorter than presently described in the

SGRR, (pages 2-2, 5-3, 5-4, 5-8, 5-11, 5-12 and 5-13 plus tables
2. 1-1 and 5. 1-2) and; (3)

Incorporation of accident analyses scenarios for Section 5.2 of the SGRR to demonstrate that transports of the lower assemblies over the east plant road safety related buried facilities can be acceptably accommodated with both Unit 3 and Unit 4 operating, (pages 5-21, 5-21a and 5-21b);

(4)

Corrections to various pages, (pages 5-20, A-5-1, 5-19, A-6-2 and figure A.22-2).

Very truly yours, obert E. Uhrig Vice President REU:GDW:pit cc:

J.P. O'Reilly, Region II Robert Lowenstein, Esquire 7822P0321 PFOPLE... SERVING PEOPLE

P

upM~d e)ioitB

~

'@~~~~7o~ zE- +gal g- ~7i DIRECTIONS FOR INSERTING REVISION 5, AUGUST 1978 During insertion of the revised

pages, a dash (-) in t'e remove. column of the directions means no action is required.

These directions may be discarded after the action is completed.

REMOVE iiib~

viu 2-2&

Table 2;l-l~

S-3~

5-4 ~

5-8~

5-ii~

5-12~

5-13~

5-19%

5-2O<

5-21~

Table 5.1+ V A-5-1~ g A-6-2~

"Figure A.22-2 ~

INSERT iiib~

vi W~

Table 2.1-1~

3-8~

Table 3.2-1 (Cont'd) 5-3~

5-8~

5-11 5-12 ~

5-13 ~

5-19 5-2M 5-21&

5-2la M 5-2lb ~ ~

, Table 5.1-2 A-5-l~

A-6-2~

Figure A.22-2 C-l<<l through C-1-5 C-2-1 C-3-1 C-4-1 through C-4-4 Figure C.l-l

l

r9~(~wfe REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS DISTRIBUTION FOR INCOMING MATERIAL 50-

/25i ORG:

UHRIG R E

FL PWR 8( LIGHT REC:

STELLO V NRC DOCTYPE:

LETTER NOTARIZED:

YES

SUBJECT:

RESPQNSE TO NRC LTR DTD 03/02l7S...

FORWARDING GFNERATOR REPAIR REPT SUBM TED ON 09/20l78..

7 7 47 3 DOCDATE: 06/20/78 DATE RCVD: 06/22/78 COPIES RECEIVED LTR 3 ENCL 40 REVISION 4 TQ APPLICANT"S STEAM NOTARIZED 06/20/ 78.

PLANT NAME: TURKEY PT N3 REVIEWER INITIAL:

XJM TURKEY PT 64 DISTRIBUTER INITIAL:OQ I

DISTRIBUTZQN OF THIS MATERIAL ZS AS FOLLOWS It GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

<DISTRIBUTION CODE AOOi)

I' FOR ACTION:

BR CHIFF ORBNi BC+wW/7 ENCL, INTERNAL:

iEG F lg'ENCL,,

F

.,1,

.NRC,PDQ+<I J/ENCL E++W 2 EhfCL

'ELD++LTR ONLY HANAUER~H~W/ENCL 4,

~

CORE

- PERFQRQANQE BR<+I,'1/ENCL AD FOR SYS

8. PROJ>+W/ENCL

(

4 ENGINEERING BR+>W/ENCL REACTOR SAFFTY BR~~W/ENgL ~

.,, PLANT, SYSTEMS BR+<W/ENCL4 EEB>+W/ENCL EFFLUENT TREAT SYS>4W/ENCL J*

MCGOUGH++WfENCLI, ~ ~

4

~

4 EXTERNAL'PDR'S f

g IW,

~

MIAMI'L+>W/ENCL'.<,,

I 7IC+~~W/ENCL 4

NSIC++WfENCL ACRS CA/-B~~W/16 ENCL 4 lll 4

~

~

I l

4 I

"I

,I

'XT;XK'>

I 4

IF'

~

I, I

j f n

l'l 4

IX W

ggL We WI WWWWWI WWW W 3I K Qa

'WWE DISTRIBUTION:

LTR 40 ENCL 39 SIZE:

2P+SP CONTROL NBR:

78i73006i 4<%++%++%%4%%+%oo+ctcHM %+o+Ito++aw+o%+

TI-IE END

III1E 14 ~

CEWHKOULATORVTON DDC MONTHLY ACCESSION LIST FILE LEVELS DOCo DATE 50 270 DUKE POWER COMPANY OCONEE ¹2 50 00/13/78 ACCESSION NBR: 78107 0188 TASK NBR:

EH~Y DOCUMENT SIZEe 2P+3P DOCKET DATE; ORT NB e

RECP i KNIEL K ORGe BIRKEL R A

NOTARIZED:

N LPDRi YE RECP AFF ILIA ORG AFFILIATI

SUBJECT:

ADVISING OF FORTHCOMING MEETING ON 04 APPEAL TO STAFF FIRE PROTECTION POSI illl~~ 0 50 00/13/78 ACCESSION NBR ~ 78108 0176 MEN~YPEe BETTE DOCUMENT SIZE:

1P+1P+8P DOCKET DATE:

EPG~

e RECP; PARKER W 0 ORG:

LONG F J TASK NBR:

FIE NBR NOTARIZED'O LPDR:

YES RECP AFFILIAT ORG AFFILIATI

SUBJECT:

EXPRESSING THANKS FOR FURNISHING INFO CITED IN IE INSPEC REPT NOS 50-269/78 AP~~rrSmW/78.mrs-NO~N 50 04/14/78 ACCESSION NBRe 78109 0035 CUMEN~PE o LETTE DOCUMENT SIZE e 1P+25P DOCKET DATE:

R~BR.

RECP ~

ORGY PARKER W 0 TASK NBR:

NOTARIZED:

NO LPDR:

YES RECP AFFILIAT ORG AFFILIATI

SUBJECT:

FORWARDING SUBJECT FACILITYaS MONTHLY 1978o

. O. BOX 013100, MIAMI, III,'g)j'llKiiCill FL 33101 FLORIDA POWER & LIGHTCOMPANY t'une 20, 1978 L-78-209 Office of Nuclear Reactor Regulation

'ttention:

Mr. Victor Stello, Director Division of Operating Reactors 0.

S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Stello:

r>~w

~~g C'>

KI Ptl C/7 Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Steam Generator Repair Report Revision 4

A. tached herewith is Revision 4 to our Steam Generator Repair Report which was forwarded. to you on September 20, 1977(L-77-206}.

Revision 4 is being submitted in response to Mr. A. Schwencer's letter of March 2, 1978.

Very truly yours, Robert E. Uhrig V'ce President REU/GDW/bb Attachment cc:

J.

P. O'Reilly, Region II Robert Lowenstein, Esq.

78~7-0o 6g 5'q p@

PEOPLE... SERVING PEOPLE

H A'~

s

COUNTY OF DADE STATE OF FLORIDA

)

)

)

ss E. A. Adomat being first duly sworn, deposes and says:

That he is Executive Vic P

Light Company, the herein; of,Florida Power That, he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best. of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee E. A. Adomat Subscribed and sworn to before me this W~ ~day of I 1978 NOTARY PUBLIC, 'nd for the County of Dade, State of Florida NOyg '; WRAC 5TATE CF FMRtbA a'.'@RGB MY COMtiIISGION EXPIRES MARCH 27, 1%Z My COmmiSSiOn eXPireS

~

BQNDED THRU MAYNARD BDNDINQ AGENcY

SGRR

'IRECTIONS FOR INSERTING REVISION 4, JUNE 1978 During insertion of the revised

pages, a dash (-) in the remove column of the directions means no action is required.

These directions may be dis-carded after the action is completed.

REMOVE INSERT iiib iiib B-1-1 B-2-1 B-2-2 B-2-3 B-2-4

r

SGRR g zo-7g

'age 7.4 IN-PLACE STEAM GENERATOR REFURBISHMENT 7.5 ALTERNATIUE REPAIR METHODS 7.6 MAN-REM CONSIDERATIONS 7.7 REPLACEMENT CAPACITY 7.8 DERATION 7-4 7-4 7-6.

7-7 7-8

7.9 CONCLUSION

S 7-8 8.0 COST BENEFIT ANALYSIS FOR THE REMOVAL, STO GE, AND DISPOSITION OF THE LOWER ASSEMBLIES CONSIDERING ~GV.

8-1 1

8.1 INTRODUCTION

S.2 STEAM GENERATOR IN-PLACE DECONT INATION 8.3 STEAM GENERATOR STORAGE AND SPOSAL 8-1 8-1 8-3 8.3.1 Lower Assembl Stor e

8.3.2 Cutu Pre aratio and Methods of Dis osition 8.3.3 References 8-4 8-4 8-6 8.4 SINGLE UNIT CONSID TIONS APPENDIX A RESPONSES TO NR QUESTIONS OF 1/9/78 8-6 A.l-l 3

Revision 3

April 1978,

c

~