Response to Request for Additional Information Diesel Generator Information
ML18228A428
Person / Time
Site: Turkey Point  
(DPR-031, DPR-041)
Issue date: 06/13/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Schwencer A
Office of Nuclear Reactor Regulation
References
Download: ML18228A428 (10)


Text

REGULATORY INFQRMATION DISTRIBUTION SYSTEM DISTRIBUTION FOR INCOMING MATERIAL REC:

SCHWENCER A

NRC ORG:

UHRIG R E

FL PWR 5 LIGHT DOCTYPE:

LETTER NOTARIZED:

NO

SUBJECT:

FORWARDING APPLICANT"S RESPONSE TO TWO DIESEL GENERATOR CONTAINED IN NRC LTR DTD 04/04/78.

(BIDS>0-250 25i DOCDATE: 06/13/78 DATE RCVD: Ob/20/78 COPIES RECEIVED LTR 3 ENCL 3 RELATED COMMENTS PLANT NAME: TURKEY PT 83 TURKEY PT 84 REVIEWER INITIAL:XJM DISTRIBUTER INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ++~++P<+<++<<<++<P RELIABILITYOF STANDBY DIESEL GENERATOR UNITS.

(DISTRIBUTION CODE AOi4)

FOR ACTION:

BR CHIEF ORBNi BC+wW/3 ENCL,

" INTERNAL:

EXTERNAL:

IhE+~~lj/2 wENCL HANAUER~+W/ENCL F CLEMENSON~HHJ/ENCL I PDR S

MIAMIi FL~4W/ENCL <-

TIC+~~W/ENCL NS IC~~+W/ENCL ACRS CAT B+~tJ/f6 ENCL 4

.NRC PDR++W/ENCL OELD+~W/ENCL POWER SYS BR++W/ENCL D...

rw

~

g(PC

'uX'~s &A-y wr-sy>> dR gZ ~

O~~~ 7~

'~Ac p~g>rS YS

~ ~~mdi'A~

oE ~W DISTRIBUTION:

SIZE:

iP+iP 4l LTR

~~

ENCL ~

END CONTROL'BR:

781720166

8~&15 i FILE LEVELS DOCo DATE UNrrED-rrATES-XuCLWaR-RceuLATOR~MMI-S DDC MONTHLY ACCESSION LIST" f017'7

/3-0TH 50 331 IOWA ELECTRIC

& POWER COMPANY DUANE ARNOLD 50 03/22/78 ACCESSION NBR: 78111-0066 MEN~PE"i CATT C

DOCUMENT SIZE+

2P+6P DOCKET DATEe REPO~

RECPo ARNOLD D ORGY FISHER W L TASK NBR:

CH~BR NOTARIZED:

LPDR:

Y RECP AFFILI ORG AFFILIA

SUBJECT:

FORWARDING IE INSPEC REPT NO 50-331 FEB 14 t 15 t MARCH 6

& 7 ~

1978 t DUBI e

50 C

331 05/24/78 ACCESSION NBR o 77315-0300 DOCUMEN~YPE ~

MEMO DOCUMENT SIZE:

1P DOCKET DATE:

EPOR~8 e

RECPo BUTLER W

R ORGY GRIMES C I TASK NBR:

F'I CH~SR NOTARIZED:

LPDR:

RECP AFFILI ORG AFFILIA

SUBJECT:

STAFF POSITION ON MSIV LEAK TESTING 331 C

~ESS1 DOCUMENT TYPES'ETTER DOCUMENT SIZE e 1P+iP+3P CmT~

REPORT NBR>>

RECPo LEAR G

RG i L~L

~K FICHE NBR NOTARIZED:

YE 1'ECP AFFILIA R~FF IL ?AT SUBJECT'ESPONSE TO ITEMS PFo2(A)

AND PF ~ 29 ONCERN'ING CONTROL ROOM CN3LE~PREAQ SOURCE

& TURBINE BLDG FIRE DETECTION 12/30/77

~ o ~ NOTARIZED 3/24/78o YAW/ENC

FLORIDA POWER & LIGHT COMPANY Off ice of Nucl ear Reactor Regul ati on Attention:

Mr. A. Schwencer, Chief Operating Reactors Branch 81 Division of Operating Reactors U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr. Schwencer:

June 13, 1978 L-78-205 1

~i.j. >

t QA rl Cll r>

CP Ci>rl ref})

~C)

WCD Wmg c A

~CJ Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Diesel Generator Information We have reviewed the two diesel generator related comments contained in your letter dated April 4; 1978.

Our responses to the comments are attached.

Very truly yours, Robert E. Uhrig Vice President REU/MAS/cpc Attachment cc:

Mr. James P. O'Rei lly, Region II Robert Lowenstein, Esquire gZO~bb

~ay'72

)oi~

PEOPLE... SERVING PEOPLE

I'

ATTACHt1ENT Re:

Turkey Point Units 3

8 4 Docket Nos.

50-250 8 50-251 Diesel Generator Information 1.

NRC Comment When the D/G Local-Normal switch is not in Normal position, the D/G will not be able to respond to an automatic start -signal.

The annunciator window for this condition reads, "Local-Normal Switch Off-Normal".

This wording should be changed to more clearly indicate the 0/G will not automatically start.

~Res onse Control Room Operators and Supervisors receive periodic training on the subject of diesel generator control circuitry.

The training includes operation of the "Local-Normal" switch and its effect on the readiness of the diesel genera'tor.

The position of the switch is administratively controlled to ensure that it is in the "Normal" position unless the diesel generator is undergoing survei llance testing in connection with maintenance or in compliance with Technical Specifications.

The switch position is continuously monitored by a Control Room annunciator and is physically checked daily to verify annunciator indication.

The administrative control of the switch position, the surveillance testing of the diesel generator, the operating implica-tions of either switch position, and the operator response to annunciator indication are all discussed by approved plant procedures.

Training," surveillance, and administrative control combined with the present annunciator wording make the operator aware of the position of the "Local-Normal" switch and its effect on the readiness of the diesel generator.

However, the recommended change in annunciator wording is not a major change, therefore, it will be implemented.

Appropriate wording

. will be developed and is expected to be in place within approximately one month.

2.

NRC Coment

, The information provided (in FPL letter to NRC. dated Flay 19, 1977) is not sufficient to determine if the diesel generators are provided with a manual shutdown lockout relay.

If such a relay exists, an alarm should be provided which is worded to clearly indicate the diesel generator is incapable of an automati c start when the relay is not reset.

~Res ense The diesel generators are not provided with a manual shutdown lockout relay.

4

o>fr~pyy9 REGULATORY INFORMATION DISTRIBUTION SYSTEM (BIDS >

DISTRIBUTION FOR INCOMING MATERIAL 50 50 51/335 REC:

SCHWENCER A

ORG:

Ul-IRIG R E DOCDATE: 06/08/78 NRC FL PWR 5 LIGHT DATE RCVD: 06/16/78 DOCTYPF:

LETTER NOTARIZED:

NQ COPIES RECEIVED

SUBJECT:

LTR 3 ENCL 0 RE APPLICANT"S MEETING OF 06/05/78... ADVISING APPLICANT CONCURS WITH THE DRAFT STAFF POSITIONS ON SYSTEM OPFRATIONS AND WILL PROVIDE IT PROPOSED METHODS PROCEDURES AND PLANS FOR IM LEMENTATION IN THIRTY DAYS AND FURNISHING INFO RE CONFIRMATION OF REG G

FOR ACTION 3)+3 3)

") o INTERNAL:

PLANT NAME: TURKEY PT 83 REVIEWER INITIAL:

XJM TURKEY PT N4 z DI,STRIBUTER INITIAL:QQ ST LUCIE ei t,'

"i I

tl I'

f~

Il ll DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

<DISTRIBUTION CODE A001)

O BR CHIEF QRBS1 BC~~+LTR ONLY<7) p4 II REG FIL 44LT(R Y<it),;NRC PDR+<LTR ONLY< 1)

U LY(2)

OELD>+LTR ONLY(1)

HANAUERwwLTR ONLY<i)

CORE PERRORMANCE BR+<LTR ONLY

REACTOR SAFETY BR+<LTR ONLY(1)

PLANT SYSTEMS BR~~LTR ONLY(1)

EEB>+LTR ONLY(1>

EFFLUENT TREAT SYS++LTR ONLY(i>

J.

MCGOUGH++LTR ONLY<i),

f3 EXTERNAL:

LPDR'S

'3 MIAMII FL++LTR ONLY(1) l TIC44LTR ONLY<1)

NS IC+~L'TR >ONLY'(1 )

ACRS CAT B++LTR ONLY(16) 3"

~

/3 4

n

',q 5>

33 I

3E Ma maew'33~C.

333~+

~Ma 3

mew t

tt 33~ fj 1

DISTRIBUTION:

LTR 40 ENCL 0 SIZE:

1P END CONTROL NBR:

781670001

~%1995=0 I

, FIlE LEVELS DOCG DATE UNITE~A"1ES NUCLEARREGULATORY COMMIX&

DDC MONTHLY ACCESSION LIST OVreXVV8=0ereon WWWMm~m++m&W&&~~w~mmm~m~~~~~~~yy~~~>>

STN-50 523 PUGET SOUND POKIER

& LIGHT COMPANY SKAGIT ¹2 50 03/08/78 ACCESSION NBR o 78090 0100 M

MMT Ml R

C DOCUMENT SIZE:

2P DOCKET DATE'3/29/78 EPOS'B e

RECPo ORGY SCHUYLER D

TASK NBR'TCNE NBR NOTARIZFD' LPDR; YE RECP AFFILIA ORG AFFILIAT

SUBJECT:

UPPER SKAGIT INDIAN TRIBE RESOLUTION 523 C

03/40/78 ACCESS IN NB~8090 01"lG DOCUMENT TYPEe LETTER DOCUMENT SIZE:

2P+1P

~

'ET E.

R/RE "

REPORT NBR:

RECPe LEPlIS N

D ORGY MECCA J TASK NBA FICHE NBR NOTARIZED:

N LPGA YE RECP AFFILIA ORG AFFILIAT SUBJECT'ONSISTS OF INFOG REG THE SUBJFCT FA EOLOGY R OO/AT 50 523 C

03/14/M78 ACCESSION NBRo 78107 0171 DOCUMENT TYPES'ETTER DOCUMENT SIZE:

2P+5P DOCKET DATE ~

REPORTNB o

RECPe FERGUSON N J ORG; SPENCER G

S TASK NBRo FTCHE NBR NOTARIZED o N

LPDR:

YE RECP AFF ILIA ORG AFFILIAT

SUBJECT:

ADVISING THAT THERE WERE NO ITEMS OF PRELIMINARY SAFETY ANALYSIS REPT IDE 50=52+/'78M1CQNDUCTE~Y~ESGRS

~

PA REPT

BOX 013100, MIAMI, FL 33101 Q1 l/gi FLORIDAPOWER & LIGHTCOMPANY June,8, L-78=201 1978 Office of Nuclear Reactor Regulation Attention:

Nr..- A. Schwencer, Chief Operating Reactors Branch 81 Division of Operating Reactors U. S. Nuclear Regulatory Corrmission Washington, D.

C.

20555

Dear Mr. Schwencer:

Re:

Turkey Point Units 3 and 4 Docket Nos.

50-250 and 50-251 St. Lucie Unit 1

Docket No. 50-335 On June 5, 1978, FPL personnel met with NRC staff members to discuss Draft Staff Positions on System Operations and applicability of current staff practice relative to onsite power source surveillance.

FPL concurs with the Draft Staff Positions on System Operations and will provide its proposed

methods, procedures and plans for implementation in thirty days.

We also plan to conform to Regulatory Guide 1.108 as implemented in Standard Technical Specification for surveillance of onsite power source for Turkey Point Units 3 and 4 and St. Lucie Unit 1

and will provide proposed technical specifications in sixty days.

Very truly yours, Robert E. Uhrig Vice President REU:JAD:sl 78i67004i PEOPLE... SERVING PEOPLE