ML18227D809
| ML18227D809 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/27/1978 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Stello V Office of Nuclear Reactor Regulation |
| References | |
| L-78-32 | |
| Download: ML18227D809 (7) | |
Text
REGULATORY INFQRMATION 1? ISTRI BUTION SYSTEM DISTRIBUTION FOR INCOMING MATERIAL REC:
STELLQ V ORG:
UHRIG R E
NRC FL PWR' L1GHT (RIDS>50-25
. >51 DQCDATE: 01/27/78 DATE"RCVD 02/01/78 1?OCTYPE:
LETTER NOTARIZED:
YES SIJBJECT:
LICENSE NO DPR-31 8: 41 APPL FQR AMEND:
CONCERNING APPENDIX A REVISION TO THF THE THERMAL AND HYDRAULIC SAFETY LIl"lIT OPERATION... NOTORIZED 01/27/78.
COPIES RECEIVED LTR 3 ENCL 40 TECH SPECS PROPOSED CHANGE ECCS ANAI YSIS PERTAINING TO CURVES FOR 3-LOOP PLANT NAME: TURKEY POINT UNIT 3 TURKEY POINT UNIT 4 REVIEWER INITIAL:
XJM DISTRIBUTFR INITIAL:
+++++++4<'.++++4++4 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS 4444+<++<<++++++++
GENERAl DISTRIBUTION FOR AFTER 1'SSUANCE OF OPERATING LICENSE" (DISTRIBUTION CODE AOOi )
FOR ACTION:
INTERNAL:
LEAR++W/7 ENCL REG F ILE++l CL P
~
e ENCL HANAUER++W/ENCL EISENHUT+4 W/ENCL BAER++W/ENCL GR IMES4 +W/ENCL J.
MCGOUGH++W/ENCL NRC PDR++W/ENCL OELD4+LTR ONLY CHECK+>W/ENCL SHAO44W/ENCL BUTLER~~W/ENCL J.
COLLINS++W/ENCL EXTERNAL:
LPDR'S MIAMIi FL+4 W/ENCL TIC++W/ENCL NS IC+4 W/ENCL ACRS CAT B++W/lb ENCL 3ISTRIBUTION:
LTR 40 ENCL 39 SIZE:
2P+1P+37P CONTROL NBR:
780-20024 THE END
Ã
P. O. BOX 013100, MIAMI, FL 33101 FLORIDA POWER 84 LIGHT COMPANY january 27, 1978 L-78-32 Director of Nuclear Reactor Regulation Attention:
Mr. Victor Stello, Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stello:
j
. ~
I.
> M'CMg gIPI~
CC:~~gg$4g IOky
~ +f41oy Re:
Turkey Point Units 3 and 4-Docket: Nos.
50-250 and 50-251 Proposed Amendment to Facility 0 eratin Licenses DPR-31 and DPR-41 In accordance with 10 CFR 50..30, Florida Power 6 Light Company submits herewith three (3) signed originals and forty (40) copies of a request to amend Appendix A of Facility Operating Licenses DPR-31 and DPR-41.
An ECCS reanalysis has been performed assuming greater t:han 15% steam generator tube plugging and its anticipated effect on RCS flow.
The reanalysis has shown that a Technical Speci-fication amendment is necessary to support operat.on under these conditions.
The proposed amendment is desc='bed below and shown on the accompanying Technical Specification pages bearing the date of this letter in the lower right hand corner.
Ficrure 2.1-1 A note is added to the reactor core t:hermal and hydraulic safety limit curves for 3-loop operation to indicate that the curves are applicable when steam generator. tube plugging is less than or equal to 15%.
Fi ure 2.l-la Additional reactor core thermal and hydraulic safety limit curves for 3-loop operation have been developed to incor-porate a reactor coolant system flow rate of 98$ thermal design flow.
These curves will be applicable when steam generator tube plugging is greater than 15% but less than or equal to 19%.
Pa e 2.3-2 Page 2.3-2 for Unit 3 and page 2.3-2a for Unit 4 are com-bined into one page applicable to both units.
A note is ply 7g0320024.
PEOPLE... SERVING PEOPLE
w~
~
Mr. Victor Stello,
'rector Proposed Amendment P'a e Two added to lower the factor Kl for 3-loop operation from 1.095 to 1.08 when steam generator tube plugging is greater than 15% but less than or equal to 19%.
Pa e 2.3-3 Page 2.3-3 for Unit 3 and page 2.3-3a for Unit 4 are com-bined into one page applicable to both units.
A note is added to lower the factor 1.11 in the Overpower hT equation to 1.10 when steam generator tube plugging is greater than 15% but less than or equal to 19%.
Pa e 3.1-7 Page 3.1-7 for Unit 3 and page 3.1-7a for Unit 4 are com-bined into one page applicable to both units.
A note is added to lower the "reactor coolant flow" DNB parameter from 268,500 gpm to 263,130'gpm when steam generator tube plugging is greater than 15% but less than or equal to 19%.
Pa e 3.2-3 The hot channel factors of Specification 3. 2.6 are revised to provide separate specifications for steam generator tube plugging less than or equal to 15 percent and for. tube plugging greater than 15 percent but less than or equal to 19 percent.
i'he proposed amendment has been reviewed by the Turkey Point Plant Nuclear Safety Committee and the Florida Power
& Light Company Nuclear Review Board.
They have concluded that it does not affect the health and safety of the public..
A safety evalua-tion-is attached.'ery truly yours, Robert E. Uhrig Vice President REU/MAS/lah Attachment
. cc:
Mr. James P. O'Reilly, Region II Robert Lowenstein, Esquire
STATE OF FLORIDA
)
)
COUNTY OF DADE
)
ss Robert E. Uhrig, being first duly sworn, deposes and says=
That he is a Vice President of Florida Power
& Light Company, the Licensee herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.
Robert E. Uhrig Subscribed and sworn to before me this day o<
19'~
NOTARY PUBLIC, in and for the County of Dade, State of Florida My commission expires: