ML18227D462
| ML18227D462 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/01/1977 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Lear G Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227D462 (3) | |
Text
DISTRIBUTION AFTER ISSU E OF OPERATING LICENSE ARC FoRM 195 UA. NUCLEAR REGULATORY MISSION "8 js)
NRC OISTRIBUTION FoR PART 50 DOCKET MATERIAL OOClCET NUMSER S'-
0 F IL.E NUMBER ABETTER ORIGINAL QCOPY ESCRIPTION GNOTORIZEO gUNCLASSIFIEO blr. George Lear PROP INPUT FORM ENCLOSURE FROM:~~'>>
lfiami, Fl.
33101 Robert E. Uhrig OATK OF OOCUMENT 09/01/77 OATK RECKIVEO 09/06/77 NUMSER OF COPIES RECEIVEO Furnishing comments in response to NRC's ltr dated 0?/29/77 which forwarded new "instructions for Preparation Of Data Entry She for Licensee Event Report File", NUREG-0161, Ju ts 1977...
ttKCKNOWLEDGKD DO NOT CHEMO'LJE
.LANT N~:
TURKEY POINT UNITS 3 G 4 lcm 09/08/77 SAFETY BRANCH CHIEF:
7 FOR ACTION/INFORMATION REG FILE NR~R I G E (2)
OELD HANAUER CHECK STELLO EISENHUT SHAO BAER BUTLER GRAVIES 0
INS INTERNAL0 ISTRlBUTIQN "
LPDR:
TIC NSIC 16 CYS ACRS SENT CATE 0 EXTERNALDISTRIBUTION CONTROI.NUMBER yp~
ggjoSa
P. O. BOX 013100, MIAMI, FL 33101 FLORIDAPOWER 8( LIGHTCOMPANY September 1,
1977 L-77-275 Office of Nuclear Reactor Regulation Attention:
Mr. George Lear, Chief Operating Reactors Branch 53 Division of Operating Reactors.
U. S. Nuclear Regulatory Commission.
Washington, D. C.
20555
Dear Mr. Lear:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 NUREG-0161 Ress org Your letter of July 29, 1977 forwarded new "Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)
File", NUREG-0161, July 1977.
Your letter also requested that we review the instructions and notify you if we did not anticipate being able to use the revised form.
We have reviewed NUREG-0161 and have the following comments:
(1).
NUREG-0161 states that background and any other
, supplementary information required for a full understandin of the event should be provided as an attac ment to the LER form.
This, being a
non-specific open-ended requirement, is subject to interpretation.
"Sufficient information for full understanding" depends on the reader's back-ground (2)
The mair: purpo e of thc. LER form is to pro:-'de in-formation.on off-normal events to a computer data bank.
Since attached information is not used for this purpose, the attachment. becomes of secondary importance and need not be the subject of special instructions.
(3)
Compatibility with the Nuclear Plant Reliability Data System (NPRDS) does not necessarily make the new LER form less burdensome, as claimed in the Introduction to NUREG-0161.
The responsibilities for compiling NPRDS reports and LER's reside with different.groups within. Florida Power
& Light Company.
>7~ ~/~zzW PEOPLE... SERVING PEOPLE
Office of Nuclear Reactor Regulation Page Two Increased coordination of these responsibilities would actually increase the work load.
In addition, the new LER forms are longer and more detailed, and will not be easier to complete than the current forms.
The "PROCEDURES" section on page 3 of NURFG-0161 claims that "the procedures described herein do not impose any additional reporting requirements'".
This will be true as long as NUREG-0161 instructions are interpreted as "guidelines",and not "requirements".
(5)
One effect of NUREG-.0161 will be to expand one report into two reports, i.e., the LER abstract which is intended to stand alon'e, and the separate'narrative attachment.
This considerably increases the work needed to file a Reportable Occurrence report.
Technical Specification 6.9.2 specifies the reports required to describe Reportable Occurrences.
Specifications 6.9.2.a (prompt reports) and 6.9.2.b (30-day reports) state, in part, that written followup reports shall include, as a minimum, a completed copy of a licensee event report form, to be supplemented by additional narrative material to provide complete explanation, of the circum-stances surrounding the event.
Our current practice of continuing the Event Description and Cause Description on a separate page whenever more space is needed satisfies the Technical Specification requirements.
A separate narrative attachment that restates the LER form in greater Detail is not necessary.
Although we have objections to NUREG-0161 as described
- above, we do intend to implement the new LER 'form, with the understanding that our Reportable Occurrence reports will maintain their present overall format, and that NUREG-0161 will not become an auditable requ'rement.
Also, rather than change our reporting-p actices in mid-year, it would be simpler'or us to continue using the.
current LER form for the remainder of 1977.
- Thus, we plan to use NUREG-0161 for general guidance in implementing the ne LER forms after January 1, 1978.
Very truly, yours, Robert E. Uhrig Vice President REU/MAS/cpc cc:
Mr. James P. O'Reilly, Region II Robert Lowenstein, Esquire