Letter Attached Revision 5 to Steam Generator Repair Report
ML18227D397
Person / Time
Site: Turkey Point  
Issue date: 08/04/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
Download: ML18227D397 (3)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTION FQR INCOMING MATERIAL 50- 2 0/25

'EC:

STELLO V GRG:

Ul-IRIG R E

DOCDATE: 08/04/78 NRC FL PWR S. LIGHT DATE RCVD: 08/07/78 NOTARIZED:

NO DGCTYPE:

LETTER

SUBJECT:

FORWARDING REVISION 5 TG APPLICANT"S STEAM SUBMITTED ON 09/20/77.

kA.~I.~ ~)54 Q~

PLANT NAME:TURKEY PT I3 TURKEY Pl 84 COPIES RECEIVED gyp~ g LTR 3 ENCL 40 GENERATOR RE%AM REPT WHICH WAS REVIEWER INITIAL:

XJM DISTRIBUTER INITIAL:

I DISTRIBUTION OF Tl-IIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE QF OPERATING LICENSE.

(DISTRIBUTION CODE AOO1)

FOR ACTION:

INTERNAL:

BR CIIIEF ORBOl BC>+W/7 ENCL iEG I

+WfENCL

-4+W/2 ENCL HANAUER+>WfENCL AD FOR SYS 8( PROJ+4W/ENCL REACTOR SAFETY BR+4W/ENCL EEB~~W/ENCL J.

MCGOUGH++W/ENCL NRC PDR<+WfENCL OELD++LTR ONLY CORE PERFORMANCE BR++W/ENCL ENGINEERING BR++W/EhlCL PLANT SYSTEMS BR+~W/ENCL EFFLUENT TREAT SYS+W J/ENCL EXTERNAL:

LPDR'S MIAMI' L4<W/ENCL TERA~~~W/ENCL NS IC+<W/ENCL ACRS CAT B+>W/16

-NCL DISTRIBUTION:

LTR 40 ENCL 39 SI ZE:

1P+ -9P CONTROL NBR:

782200321

FLORIOA POWER Bc LIGHT COh1PAi~JY August 4,1978 L-78-255 Office of Nuclear Reactor Regulation Attention:

Mr. Victor Stello, Director Division of Operating Reactors U.S. Nuclear Regulatory Commission Mashington, D.C.

Z0555

Dear Mr. Stello:

Re:

Turkey Point Units 3 and 4 Docket Nos.

50-250 and 50-251 Steam Generator Repair Report Revision 5

Attached herewith is Revision 5 to our Steam Generator Repair Report which was forwarded to you on September 20, 1977 (L-77-206).

Revision 5 contains a new SGRR appendix and modifications to some existing SGRR pages.

With regards to the latter, only the actual portion of the page to be changed is indicated by a revision bar on the margin.

The attached Revision 5 package consists of the following:

(1)

Responses to Mr. A. Schwencer's request for additonal information dated April 13, 1978 are incorporated in the SGRR as Appendix C, (pages C-1-1 through C-4-4 plus page 3-8 and table 3.2-1);

(2)

Revisions to Chapters 2 and 5 to incorporate the necessitated changes as a result of the lower assemblies tube bundle being 8 inches shorter than presently described in the

SGRR, (pages 2-2, 5-3, 5-4, 5-8 5-11, 5-12 and 5-13 plus tables
2. 1-1 and 5. 1-2) and; (3)

Incorporation of accident analyses scenarios for Section 5.2 of the SGRR to demonstrate that transports of the lower assemblies over the east plant road safety related buried facilities can be acceptably accommodated with both Unit 3 and Unit 4 operating, (pages 5-Z1, 5-21a and 5-21b);

{4)

Corrections to various pages,

{pages 5-20, A-5-1, 5-19, A-6-Z and figure A.22-2).

Very truly yours, Robert E. Uhrig Vice President REU:GDM:pit cc: