ML18227B792
| ML18227B792 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/14/1977 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Case E Office of Nuclear Reactor Regulation |
| References | |
| L-77-292 | |
| Download: ML18227B792 (4) | |
Text
lRC FoRM 196 U S NUCLEAR REGULATORY COMMISSION Z-78) r 1r NRQ DISTRIBUTION FoR PANT 60 DOCKET MATERIAL lENU E
BETTE R PpRIQINAL Cj COPY C3NOTORIZEO gfJ NClASSIFIEO FROM:
PROP
'PL MiaIIIi, Fla.
33101 R'e Uhrig'NPUT FORM.
OATS OF OOCUMENT 9-14-77 OA'TE RECEIVED 10>>14-77 NUMBER OF COPIES RECEIVEO OCSCRIPTION Ltr trans the following-lP ENCEOSURE Reactor Vessel Integr ty Analyses.. ~... ~...,
2 inches Turkey Pt.. Units'
& 4 DHL 10 7 CT MANAGER FOR ACTION/INFORMATION ASSIGNED AD.
BRANCH CHIEF:
PRO JECT MANAGER.
Ve. MOORE LTR EN ING ASSISTANT.
L'ICENSXNG ASSXSTANT:
Be HARLESS INTERNALOISTRIBUTION.
STFM FETY TTSO PIANT SYSTEMS TEDESCO BENAROYA IPPO'GITO OPERA REACTORS SITE SAFETY &
ENVIRON ANALYSIS DENTON & M~~R EP/IRC TECH ERNST GB 0
B ER GAt&XLL 2
SXYS A1MZSXS VOLL.KR BUNCH J
COLLINS EXTERNALOISTRIBUTION CONTROL NUMBER
'V J HANCHETT GYS ACRS SENT CAT GO NSIC 772870305
.rI 0
A 0
~8 "Q l
I
)
1
KIINM7ME P. O. BOX 013100, MIAMI, FL 33101 I
+ lzi hv st FLORIDAPOWER & LIGHTCOMPANY September 14, 1977 L-77-292
Mr. Edson Case, Acting Director Office of Nuclear Reactor Regulation U. S. Nuclear. Regulatory Commission Washington, D. C.
20555
Dear Mr. Case:
Re:
Turkey Point Units 3
6 4
Docket. Nos.
50-250 and 50-251 Reactor Vessel Surveillance Ca sules Florida Power a Light Company hereby submits fifteen (15) copies of a summary technical report on the results of Turkey Point.
reactor vessel integrity analyses.
The analyses were performed in accordance with 10 CFR 50, Appendix G, Section V.B.
The present report,seri'es updates previously submitted analyses for Turkey Point Units 3 and 4.
The series includes an ASME III Appendix G Analysis, a fatigue crack growth evaluation, and a
fracture mechanics evaluation of the pressure vessel subjected to postulated accident conditions.
On April 7, 1977, a meeting was held withstaff members from Operating Reactors Branch N3.
At that meeting it was shown that the weld metal surveillance'ata for the Turkey Point Unit 3 reactor vessel represents not only the coze midplane circumferential welds in Unit 3, but in Unit 4 as well.
Data supporting this con-clusion has been submitted to the Division of Operating Reactors.
I Based on the results of the April 7 meeting and the results of the present report series, the Turkey Point Units 3 and 4 reactor vessels are in full compliance with 10 CFR 50, Appendix G.
Very truly yours, Robert E. Uhrig Vice President REU/MAS/cpc Attachments cc: