NRC FOI>>M 1~JG U.S. NUCLI:AR IIGGULATORYCOMMISSION
. IV.T6)
NRC DISTRIBUTION roR PART 50 DOCICET MATERIAL OQCKGT NUM J3+~
50-25 25+335 r>>LE NvFJI MONTIILY RI PORT e 10e No Ri Co FROM:
FLORIDA POWER & LIGHT COIiIPANY MIAMIq FLORIDA ho Do SCHMIDT DATE OF DOCUMGIJT 6/8/76 DATE RECEIVED 6/14/76'ETTER QORIOINAI 0 COPY C3 IJ6'COR IZE D gU NC LASS I F I E 0 PROP INPUT I'OI>>M NUMBER OF COPIES RGCLIVGO LETTER TRANS THE FOLL01lXNG:
ONE STEED
'<OIjTHLY REPORT FOR MAY/76 PLANT & COl1PO¹NT OPERABILITY &
AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS & OPERATIONS, PLANT NAME:
mRKn POTm 3 & 4 (50-250/251)
(1-P)
STo LUCIE gl (50 335)
ACKNOWLEDGED
]3Q NOT REMOVE MIPC M lz C~YF 0
AC~YCiY FOR ACTION/INFORiAATION 6 15 76 BJL EQ ZU~E SR GDQM MARE BRANCH CHI~EF L LEA1I INTERNALD RI I3UTION IST
~P.DRAT-PIERC~RFLA
~z j.z: MIAMI~ FIA
'1;T,C LXTFIINALDIG'I IIII3UTION CONTROL NUfziII3LFR gos5.
IJIZI I OIZA>> 'I ~ ) ' ill
F FLORIDA POWER IR LIGHT COMPANY Office of Management Information and Program Controls U. S.
Nuclear 'Regulatory Commission Washington, D. C.
20555 June 8',
1976
~O-ok'~i Gentlemen:
Attached are the May, 1976 Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. -1.
'Very truly yours, D.
Schmidt Vice President Power Resources VTC/pm Attachments CC Mr; Norman C. Moseley Jack R.
Newman, Esquire QX POCKETED NUITEl MUND 197 U~5~ NUCE R REGUIA RT.
COMMISS IOIE
( ~g
~P 6G35 1I I I I ~ Ittf+
~ ~ ~
~ ~ ~
a
~
~
APPENDXX.C OPEPATXNG A A REPOR=
DOCKET NO. 50 2 0 UNIT Turke Poi No. 3
'DATE June 4
1976
'. COMPLETED BY RATING STATUS', ", '
l REPORTING PERIOD:00
~76~05~01 GROSS HOURS ZN REPORTXNG PERIODS 744.0 THROUGH 2400 76 CURRENT..
WER LEVEL (MWt): 2 200
> r.
MAX. DEPEND.
CAPACITY (MWe-Net):
DESIGN ELECTRICAL ~TING (MWe-Net):
POWER LEVEL TO WHICH RESTRICTED (XF ANY)'MWe-Net):
NONE REASONS FOR RESTRZCTZON (ZF ANY)
THIS MONTH YEAR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL....
600.9 ',244.3 24 524.4 HOURS GENERATOR ON LINE...... ~
~
585~1 3,185.9 23 555.9 UNXT RESERVE SHUTDOWN HOURS
~
~ + ~ GROSS ELECTRICAL ENERGY GENERATED (MBf)..
402,390 2,195 760 NET ELECTRICAL ENERGY GENERATED (MWH)...;
381 156 2 084 882 REACTOR SERVXCE FACTOR.
~
~
~
~ ~ ~ ~ ~ ~ ~
14 210 996 13 440 644 80.1 REACTOR AVAZLABILZTYFACTOR.. ~.....
~ ~
~ ~ '
QNZT SERVICE FACTOR..........i..
~ ~ ~
~ o
~
h UNIT AVAILABILITYFACTORe ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~
.o ~ ~ ~ ~
UNIT CAPACITY FACTOR (Using MDC).........
7.
- 78. 6 UNIT CAPACITY FACTOR (Using Design MWe)..
73.9 '2.5 II II
'SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OP EACH):-
Refueling, Maintenance, and Inspections - October 4 thorough November 14, %976
~ ZP SHUTDOWN AT END OP REPORT PERIOD, ESTIMATED DATE OF STARTUP: June 3
1976 UNITS ZN TEST STATUS (PRIOR TO COMMERCIAL OPERATXON):
FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY
'OMMERCIAL OPERATION
0 '0 0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 0 250
~4 UNIT Turkey Point Unit No.
3 DATE June 4
1 76 COMPLETED BY V
. TELEPHONE TH May 1976 AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 661 648 194 676
~
671 670 663 663 663=
662 661 658 660 19 20 21 22 23'4
'26 27 28 29 30 63 641 663 655 651 652 661 660 583 663 NOTE:
Daily average power level greater than 666 MVe due to cooler condenser cooling water.
o
~
~ '
~
~
2 '2 2 ~
~ ~
~
~
~
~
~
I
~ I
~
~ ~
~ ~
~
0 I
~ '
I
~
I
~
~ I
~
I ~
~
~
~
~
~ ~
I I
I
~
~
~ II
~
I
~
~
I~
1 I I
~
I
~
~
~ II
~
~
I
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
11 ~
~
~
~
~
I
~
~
~
~
~
APPENDIX C OPERATING DATA REPORT W!4 ~
~
~
RT MONTH
~Ma 1976 DOCKET NO. 50 - 251 UNZT
'DATE COMPLETED BY V. T.
~ Chi1son TELEPHONE 305 552 3830 No.
4
~
~
1 VOTING STATUS REPORTING PERIOD: 0001 76 05 01 GROSS HOURS IN REPORTING PERIOD: 744.0 THROUGH 2400 76 05, 31 g i:
CURRENT R LEVEL (MWt). 2 MAX. DEPEND.
CAPACITY (MWe-Net):
POWER LEVEL TO WHICH RESTRICTED (ZF ANY)
(MWe-Net) s NONE
~8
~
REASONS FOR RESTRICTION (IF ANY):
~i
= ~ 0 THIS MONTH YEAR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL
~, REACTOR RESERVE SHUTDOWN HOURS...
~ 2 411.0 18 056.9 117.1 HOURS GENERATOP.
ON LINE!~ ~ ~ ~ ~ ooo ~ ~ ooo ~ o ~ o 2,370.5'7,084.2 UNIT, RESERVE SHUTDOWN HOURS'
~ ~ ~.
.. ~ GROSS THERMAL ENFRGY GENERATED (N&)...... GROSS ELECTRXCAL ENERGY GENERATED (MWH)..
S NET ELECTRICAL ENERGY GENERATED (MWH) ~ ~
<<0
- 1 283 REACTOR SERVICE FACTOR
' REACTOR AVAILABILITYFACTOR......
o ~ o ~ ~ ~. ' 5,135,759 35.784,395 1.661,601 11;640,678 1 578 997 11'37 627 66.1
'4.3 66.1 74.7
~, 'e.
~
I UNXT SERVICE FACTOR! o o o o ~ o o o o o o o ~ o o ~ ~ o o ~ o>>
65.0 70.3 65.0
- 70. 3 0>>
UNXT AVAILABILITYFACTOR.......
~..
~
UNIT CAPACITY FACTOR (Using MDC).........
I UNIT CAPACITY FACTOR (Using Design MWe)..
~
UNIT FORCED OUTAGE RATE
~ ~
~
~ ~
~ ~
~
~ ~ ~ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATER NONE ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE 69.0 65.0 62.5 i'5.5 2.4 3.4 AND DURATION OF EACH):
h OF STARTUP: June 10, 1976 I UNITS XN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)!
FORECAST ACHIEVED ZNITXAL CRXTZCALZTY INITIALELECTRICITY COMMERCIAL OPERATION
~
5
~ 4
~
~
~
~
Sl )hfdf APPENDIX B AVERAGE DAILY UNIT POWER LEVEL L
~ ~
h DOCKET NO
- 2
@NIT
. DATE COMPLETED BY TELEPHONE
~~No.
4 on 2 830
'TH Ma 1 76
'VERAGE DAILY POWER LEVEL (MWe-Net)
/
h l DAY AVERAGE DAILY POWER LEVEL.
(MWe-Net) 0 he
~s 18 19 20
'1 22 23 h'l g 25 21 28 29 30 31
~ ~
h
~ ~
~
~
h
'ph
"~
0 n
~
~
e ~
~
~
~
~
~
I ~
~
~
~
I
~
~
~ ~
~
~ I
~
~
I I
~
~
~
~
~ I
~
I ~
~ '
~
~
I
~
I a
~
~
~
I II
~
~
~
~
~ r
~
7
~
APPENDIX C
~
OPERATING DATA REPORT
~
~
DOCKET NO UNIT St. Lucie Unit No.
1 DATE June '4 1976 COMPLETED BY V
~
~
rRATING STATUS
~
~
~
~
REPORTING PERXOD. 0001 7'6, 05 Ol GROSS HOURS ZN REPORTING PERIOD'44
~ 0(3)
'HROUGH
- 2400, 76, 05 31 9 6.
MAX. DEPEND.
CAPACITY (MWe-Net):
DESXGN ELECTRICAL RATING (MWe-Net):
POWER LEVEL TO WHICH RESTRICTED (XP ANY) (MWe-Bet):
. REASONS POR RESTRICTION (XP ANY)
NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HO~
o HOURS GENERATOR ON LINEo o ~ o o o ~ ~ o o ~ ~ o ~ o o ~ o UNIT RESERVE SHUTDOWN HOURS ~
~
416.8 "N.A.
'416. 8 N.A.( )
THIS MONTH YEAR TO DATE 536.8 709.7
~
N.A.")
. N.A."'
CUMULATIVE 709.7
'N.A.( ).
416;8 N A 75..2 REACTOR AVAILABILITYFACTOR....
~
~
~ ~
GROSS ELECTRICAL ENERGY GENERATED (MWH) ~.
117 150 117 150
. NET ELECTRICAL ENERG'2"GENERATED (MWH)....
102 34/
102 348 REACTOR SERVICE FACTOR
~ ~ o o'o ~ o o ~ ~ o ~ o ~ ~
- 72. 2 117'50 102 348 75.2 (3)
(3)
UNIT SERVICE FACTORo ~ ~ ~ ~ ~
~
~ ~ ~
~ o
~
~
UNXT AVAILILZTY FACTOR
~
~ ~
~ '
o o ~ o l.
UNIT CAPACITY FACTOR (Using MDC).........
(3) 22.0(
22.0( )
22.'0( )
22.0 22.0 22.0 24.8 UNXT CAPACITY FACTOR (Using Design MWe)..
I UNIT FORCED OUTAGE RATE
~.
~.
~ ~ ~
~
24.8 24.8
\\
SHUTDOWNS SCHEDULED OVER NEXT,6 MONTHS (TYPE, DATE, AND DURATION OP EACH):
(2)
N.A..
): ZP SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OP STARTUP:
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) x PORE CAST ACHIEVED April 22 1976 INITIALCRITICALITY XNZTZAL ELECTRICITY M~a?
1976
~
~
~
~
~
~
COMMERCIAL OPERATION i
NOTE:
(1)
Corrected-to-date
'2)
Unit in Test Status (3)
Gross hours in reporting period for unit << 579.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (From initial power generation at 8:48 p.ltd.
May 7, 1976 througli Hay 31, 1976).
I
~ (
~ ~
~
~
~
. i op.ggy APPENDIX B AVERAGE DAILY UNIT POWER LEVEL
~I DOCKET NO.
50 - 335 UNIT St. Lucre Unit No. 1
. DATE Ju e
4 COMPLETED BY TELEPHONE (305) 552 3830 EH Ma 1976
'VERAGE DAILY POWER LEVEL (MWe-Net)
DAY AERAGE DAILY POWER LEVEL (MWe-Net)
'ls
~17 IA 18 44 46 119 37 215 19 20 21
'22
'3 24 25 26 27 28 29 30 (1). N0XE:
36 295 230 118 324 328 333 330 330 327 328 331 331 Initial power generation at 8:48 p.m. Hay 7, 1976
~I s a e
e
~o
~ 0 A
0
~
Q
~
0
ZI' L