MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
NRC FOI>>M 1~JG U.S. NUCLI:AR IIGGULATORY COMMISSION OQCKGT NUM J3+~
. IV.T6) 50-25 25+335 r>>LE NvFJI NRC DISTRIBUTION roR PART 50 DOCICET MATERIAL MONTIILY RI PORT e 10e FROM: DATE OF DOCUMGIJT FLORIDA POWER & LIGHT COIiIPANY 6/8/76 No Ri Co MIAMIq FLORIDA DATE RECEIVED ho Do SCHMIDT 6/14/76'ETTER C3 IJ6'COR IZ E D PROP INPUT I'OI>>M NUMBER OF COPIES RGCLIVGO QORIOINAI gU N C LASS I F I E 0 0 COPY ONE STEED LETTER TRANS THE FOLL01lXNG: '<OIjTHLY REPORT FOR MAY/76 PLANT & COl1PO¹NT OPERABILITY &
AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS & OPERATIONS, PLANT NAME:
mRKn POTm 3 & 4 (50-250/251) (1-P)
ACKNOWLEDGED STo LUCIE gl (50 335)
]3Q NOT REMOVE FOR ACTION/INFORiAATION 6 15 76 BJL MIPC M lz C~YF 0 AC~YCiY INTERNAL D IST RI I3UTION EQ ZU~E SR GDQM MARE BRANCH CHI~EF L LEA1I LXTFIINALDIG'I II II3UTION CONTROL NUfziII3LFR
~P.DRAT- PIERC~RFLA
~z j.z: MIAMI~ FIA
'1;T,C gos5.
IJIZI I OIZA>> 'I ~
)
' ill
F FLORIDA POWER IR LIGHT COMPANY June 8', 1976
~O-ok'~i Office of Management Information and Program Controls U. S. Nuclear 'Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the May, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. -1.
'Very truly yours, D. Schmidt Vice President Power Resources VTC/pm Attachments CC Mr; Norman C. Moseley Jack R. Newman, Esquire QX POCKETED NUITEl MUND 197 U~5~ NUCE R REGUIA RT.
COMM I SS IOIE
(
~g
~P 6G35 1I I I I~ Ittf+ ~ ~ ~ ~ ~ ~
~ ~
a APPENDXX.C OPEPATXNG A A REPOR=
DOCKET NO. 50 2 0 UNIT Turke Poi No. 3
'DATE June 4 1976
'. COMPLETED BY RATING STATUS', *,
REPORTING PERIOD:00
~76~05~01 HOURS ZN REPORTXNG PERIODS l
744.0 GROSS THROUGH 2400 76 CURRENT WER LEVEL (MWt): 2 200 > r.
MAX. DEPEND. CAPACITY (MWe-Net):
DESIGN ELECTRICAL ~TING (MWe-Net):
POWER LEVEL TO WHICH RESTRICTED (XF ANY)'MWe-Net): NONE REASONS FOR RESTRZCTZON (ZF ANY)
THIS MONTH YEAR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL.... 600.9 ',244.3 24 524.4 HOURS GENERATOR ON LINE...... ~ ~
585~1 3,185.9 23 555.9 UNXT RESERVE SHUTDOWN HOURS . ~ ~ + ~ GROSS ELECTRICAL ENERGY GENERATED (MBf).. 402,390 2,195 760 14 210 996 NET ELECTRICAL ENERGY GENERATED (MWH) ...; 381 156 2 084 882 13 440 644 REACTOR SERVXCE FACTOR. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 80.1 REACTOR AVAZLABILZTYFACTOR.. ~ ..... ~ ~
~ ~
7.
h QNZT SERVICE FACTOR..........i.. ~ ~ ~ ~ o ~ 78. 6 UNIT AVAILABILITYFACTORe ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ .o ~ ~ ~ ~
MDC).........
UNIT CAPACITY FACTOR (Using UNIT CAPACITY FACTOR (Using Design MWe).. 73.9 '2.5 II II
'SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OP EACH):-
Refueling, Maintenance, and Inspections - October 4 thorough November 14, %976
~ ZP SHUTDOWN AT END OP REPORT PERIOD, ESTIMATED DATE OF STARTUP: June 3 1976 UNITS ZN TEST STATUS (PRIOR TO COMMERCIAL OPERATXON): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY
'OMMERCIAL OPERATION
0 '0 0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 0 250 UNIT Turkey Point Unit No. 3 DATE June 4 1 76 4
COMPLETED BY V
~
. TELEPHONE TH May 1976 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 661 648 194 19 63 676 20 641
~
671 . 21 663 670 22 655 663 23 651 663 '4 652 663= 661 662 '26 660 661 27 583 658 28 29 660 30 663 NOTE: Daily average power level greater than 666 MVe due to cooler condenser cooling water.
o ~
~ '
~
~ 2 '2 2~
~ ~
~ ~
~ I ~ I
~
~
~ ~
~
~ ~
~
~ I ~
I ~
~ ' I ' ~ ~ ~
~ ~
0 I I ~
~
~
I I I ~ ~ ~ II
~ ' I ~ - ~
I~
1 I I ~
I ~ ~ ~ II ~ ~
I ~ ~ ~
~ ~
~ ~
~ ~
~ ~ ~ ~ ~ ~ ~ ~
11 ~ ~ ~
I
~ ~ ~
~ ~
~ ~
W!4 ~
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 251 UNZT No. 4 RT MONTH ~Ma 1976 'DATE COMPLETED BY V. T. ~ Chi1son TELEPHONE 305 552 3830 1
~ ~
VOTING STATUS REPORTING PERIOD: 0001 76 05 01 GROSS HOURS IN REPORTING PERIOD: 744.0 2400 05, 31 i:
THROUGH CURRENT ..
76 CAPACITY R LEVEL (MWt)
(MWe-Net):
. 2 g
MAX. DEPEND.
POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net) s NONE ~ i = ~0
~ 8 ~
REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL ~ 2 411.0 18 056.9
, REACTOR RESERVE SHUTDOWN HOURS... ~
117.1 HOURS GENERATOP. ON LINE! ~ ~ ~ ~ ~ ooo ~ ~ ooo ~ o ~ o 2,370.5'7,084.2 UNIT, RESERVE SHUTDOWN HOURS' . ~ ~ ~ . .. ~
' GROSS THERMAL ENFRGY GENERATED (N&)...... 5,135,759 35.784,395
~, 'e. ~
GROSS ELECTRXCAL ENERGY GENERATED (MWH).. <<0 1.661,601 11;640,678 I NET ELECTRICAL ENERGY GENERATED (MWH) ~
S
~ - 1 283 1 578 997 11'37 627 REACTOR SERVICE FACTOR
' 66.1
'4.3 74.7 REACTOR AVAILABILITYFACTOR...... o ~ o ~ ~ ~ . 66.1 UNXT SERVICE FACTOR! o o o o ~ o o o o o o o ~ o o ~ ~ o o ~ o>>
65.0 70.3 UNXT AVAILABILITYFACTOR....... ~ ~
65.0 70. 3 MDC)......... 0>> 65.0 69.0 UNIT CAPACITY FACTOR (Using I
UNIT CAPACITY FACTOR (Using Design MWe) .. ~ 62.5 i'5.5 UNIT FORCED OUTAGE RATE ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 2.4 3.4 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATER AND DURATION OF EACH):
h NONE ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: June 10, 1976 UNITS XN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)! FORECAST ACHIEVED I
ZNITXAL CRXTZCALZTY 5
~4
~
~
~
INITIAL ELECTRICITY COMMERCIAL OPERATION
~ ~ Sl )hfdf APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO - 2 L
@NIT ~~No. 4
! h
. DATE
~
~
COMPLETED BY on TELEPHONE 2 830
~s
'TH Ma 1 76 h l
/
'VERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL .
(MWe-Net) (MWe-Net) 0 he 18 19 20
'1 22 23 25 h'l g 21 28 29 30 31
~ ~
~ ~ ~ ~
h h 'ph
"~
0 n
e ~ ~
~ ~
~
~
~
~ ~ ~
I I ~ ~
~
~
~
I
~ ~
~
~ I ~
I ~
~
~ ~
I I ~
~ ~
~ ~ ~
I ~ I a ~ ~ ~ I II ~ ~ ~ ~
~
r ~
7 ~
APPENDIX C
~ OPERATING DATA REPORT
~
~ DOCKET NO UNIT St. Lucie Unit No. 1 DATE June '4 1976 COMPLETED BY V
~ ~
rRATING STATUS ~ ~
~ ~
REPORTING PERXOD. 0001 7'6, 05 Ol GROSS HOURS ZN REPORTING PERIOD'44 ~ 0 (3) 2400, 76, 05 31 6.
'HROUGH 9
MAX. DEPEND. CAPACITY (MWe-Net):
DESXGN ELECTRICAL RATING (MWe-Net):
POWER LEVEL TO WHICH RESTRICTED (XP ANY) (MWe-Bet):
. REASONS POR RESTRICTION (XP ANY)
THIS MONTH YEAR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL 536.8 709.7 709.7 REACTOR RESERVE SHUTDOWN HO~ '
o
~
N.A.") . N.A."' 'N.A.( ).
HOURS GENERATOR ON LINEo o ~ o o o ~ ~ o o ~ ~ o ~ o o ~ o 416.8 '416. 8 416;8 UNIT RESERVE SHUTDOWN HOURS ~ ~ "N.A. N.A.( ) N A GROSS ELECTRICAL ENERGY GENERATED (MWH) ~ . 117 150 117 150 117'50
. NET ELECTRICAL ENERG'2"GENERATED (MWH) .... 102 34/ 102 348 102 348 REACTOR SERVICE FACTOR ~ ~ o o'o ~ o o ~ ~ o ~ o ~ ~
- 72. 2 75..2 75.2 REACTOR AVAILABILITYFACTOR.. .. ~ ~ ~ ~
UNIT SERVICE FACTORo ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ (3) (3)
UNXT AVAILILZTY FACTOR ~ ~ ~ ~
' o o ~ o (3) l.
UNIT CAPACITY FACTOR (Using MDC)......... 22.0( 22.0( ) 22.'0( )
UNXT CAPACITY FACTOR (Using Design MWe).. 22.0 22.0 .. 22.0 I
UNIT FORCED OUTAGE RATE ~ . ~ . ~ ~ ~ ~ 24.8 24.8 24.8
\
SHUTDOWNS SCHEDULED OVER NEXT,6 MONTHS (TYPE, DATE, AND DURATION OP EACH):
N.A..(2)
): ZP SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OP STARTUP:
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) x PORE CAST ACHIEVED INITIAL CRITICALITY April 22 1976 XNZTZAL ELECTRICITY M~a? 1976 . ~
~ COMMERCIAL OPERATION i NOTE: (1) Corrected-to-date Unit in Test Status '2)
(3) Gross hours in reporting period for unit << 579.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (From initial power generation at 8:48 p.ltd. May 7, 1976 througli Hay 31, 1976) .
~ ~
~ ~
I
~(
~ ~ ~ . i op.ggy
~ ~
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 335 UNIT St. Lucre Unit No. 1
. DATE Ju e 4 COMPLETED BY I
~
TELEPHONE (305) 552 3830 EH Ma 1976
'VERAGE DAILY POWER LEVEL DAY AERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
'ls
~
IA 17 18 19 36 20 295 21 230
'22 118
'3 324 24 328 25 333 44 26 330 27 330 46 28 327 119 29 328 37 30 331 215 331 (1). N0XE: Initial power generation at 8:48 p.m. Hay 7, 1976
~ I s a e e
~o
~0 A
0
~ Q ~ 0
ZI' L