Attached August, 1975, Operating Status Reports for Turkey Point Unit Nos. 3 & 4
ML18227A396
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/09/1975
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A396 (15)


Text

MONT)II.Y REPORTS (FOR GRAY HOOK PREPARATION)

NRC DISTRIBUTION FOR PART 5

.OCKET MATERIAL (TEMPORARY FORM)

CONTROL NO:

6 0 FIjE

~ HolrfIILY REPQRT F,

FROM Flordia Power 8 Light Co.

Miami. Flordia A.

. Schmi t DATE OF DOC DATE R EC'D LTR TWX RPT OTHER CLASS UNCLASS PROPINFO ORIG 1 Si ned INPUT CC OTHER NO CYS REC'D SENT AEC PDR SENT LOCALPDR~~

DOCKST NO:

go-kg DESCRIPTION:

Ltr trans the following:

PLANT NAME: Turkey Point 8 384 ENCLOSURES:

Monthly Report for Au st 1 Plant

& Component Operability & Availabilit This Report to be used in preparing Gray H

by Plans

& Operations.

NEIBER OF COPIES REC'D:

FOR-ACTION/INFO RMATION AB BUTLER (L)

W/'opies CLARK (L)

W/ Copies PARR (L)

W/ Copies KNIEL (L)

. 'W/ Copies SCHWENCER (L)

ZIEMANN(L)

REGAN (E)

W/ Copies W/ Copies W/ Copies STOLZ (L)

DICKER (E)

/LEAR (L) +O NOT ~+<~oyp VASSALLO (L)

KNIGHTON (E)

SPELS W/ Copies W/ Copies W/ Cop,tgsn PURPLE (L)

YOUNGBLOOD (E)~ MIPc/R'~KIIWLED@@@

~ W/ Copies W/ Copies W.4 Copies'NTERNAL DISTRIBUTION F

~ NRC PDR OGC, ROOM P.506A GOSSI CK/STAFF CASE GIAMBUSSO BOYD

'OORE (L)

DEYOUNG (L)

SKOVHOL1 (L')

GOLLER (L) (Ltr)

P. COLLINS

DENISE, REG OPR FII F A RFGION (2)

~ STEELE TECH REVIEW SCHROEDER MACCARY KNIGHT PAW LIC K I SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO J.

COLLINS LAINAS BENAROYA VOLLMER DENTON LIC ASST G R IMES R. DIGGS (L)

'AMMILL H. GEAR IN (L)

KASTNER E, GOULBOURNE (L)

BALLARD

p. KREUTZER (E)

SPANG LE R J. LE E (L)

M. RUS:IHV,CCK (L)

E NVIRO

~

S.

R F F D (E)

MULLER M. SERVICE (L)

DICKER S. SHEPPARD (L)

KNIGHTON M. SLATER (E)

YOUNG BLOOD H. SMITH (L)

REGAN S. TEETS (L)

PROJECT LDR G. WILLIAMS(E)

V. WILSON (L)

HAR LESS

~R. INGRAM (L)

)~IDUN AN EXTERNALDISTRIBUTION A/T IND.

BRAITMAN SALTZMAN

MELTZ, PLANS MCDONALD' CHAPMAN DUDE (Ltr)

E. COUPE PETERSON HARTFIELD (2)

KLECKER EISENHUT WIGGINTON

~1 LOCALPDR ~mj, Flordia

~1 TIC (ADERNATIIY) (1)(2)(10) NATIONALLABS

~1 NSIC (BUCHANAN) 1 W. PFNNINGTON, Rm E-201 GT 1 ASLD 1

CONSULTANTS 1 Newton Anderson

'EWMARK/8LUME/AGBABIAN 1 PD R-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULR I KSON, OR N L 1 AGMFD (RUTH GUSSMA Rm B.127 GT 1 J. D, RUNKLES, Rm E-20

0

nitat0TJJ P.O. BOX 013100 MIAMI,FLA. 33101 pjle cubi

.:~~

~ i 0:RLIit") i )

. ~EF'22197> m 6

II.S. PIIPiI,)y~T (SIIuI~; y'I q

LaII gq-!I;1 FLOIIIDA POWEA 5 LIGHT COMPANY September 9,

1975 Office of Management Information, and Program Controls U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:

Attached are the August, 1975 Operating Status Reports for Turkey Point Units Nos.

3 and 4.

Very truly yours, A.

. Schmidt Vice President Power Resources VTC/dd Attachments cc:

Mr. Norman C. Moseley Jack R.

Newman, Esquire gdI ~tlat P

ggckel C44 SBBQ V

H C LP) NG BUILD FLORIDA

ENCLOSURE A DOCKET NO.

UNIT NAME TURKEY POINT DATE Se tember 5

1975 Kh%'LETED BY Mar lee Mont orner TELEPHONE NO.

305 245-2910 Ext.

228

'DAILY UNIT P01fER OUTPUT MiVK DAY AVERAGE DAILYMfe-net DAY AVERAGE DAILYMfe-net 2

3 4

7 9

10 13 15 16 18 19

'67 666 660 657 652'49 648 661 668 665 631 461 654 657 657 659 657 657 653 20 21 22 23 24 25 26 27 28 29 30 31 NOTE:

654 664-6 8

383 224'.45

'648

'651 650'aily average power level greater than 666 MWe, due to cooler condenser cool-water.

DOCKET NO.

UiMI'I'Ahfl..

~

DA'IT-'Pi~fPI,E'I'I',D BY TELEPI IPNE 50-250 TURKEY POINT IT No Se temb'er 1

30 245-2910 EXT.

228 REPORT MONTH AUGUST, 1975 OPERATING STATUS 2.

3.

REPORTING PERIOD' 1

75 08 01 THROUGH 2400 75 08 31 GROSS IIOURS IN REPPI<TING PL'RIOD:

744. 0 CURRENTLY AUTHORIZED POWER LEVEL (MWt) 2200 MAX. DEPEND.

CAPACITY (MWo NET) 666 POWER LEVEL'Tp 1CIICH RESTRICTED (IF ANY): (hfffe NET)

NONE REASONS FOR RESTRICTIONS (IF ANY):

5.

MNBER OF HOURS THE REACTOR WAS THIS hfPNIH

'R-Tp-DATE CUiiJLATIVE TO DATE CRITICAL o

~ ~ ~ ~

~ ~

~ ~

~

~

~

~ ~

~

~

~

~

~ ~

~ ~ ~ g, ~ ~ ~I'40. 9 5 577. 4

'9 605.2 6.

REACTOR RESERVE SITDOWN HOURS........ -'0- 7 ~

9.

HOURS GENERATOR OiN LINE...........'....

p UNIT. RESERVE SI UTDOWN HOURS.....;.....

GROSS THERhfAL ENERGY'GBKRATED(MWH)....

733.0 5 476.3 18 894. 6 85 0

10.

GROSS 'LECTRICAL EiiERGY GENEIQTED OM3).........................'.........

490 895 3 665 066 11 092 871 ll; NET ELECTRICAL ENERGY GENERATED (ii1$)..

466 603 3 509 475 10 490 640 12.

REACTOR AVAILABILITYFACTOR Ql 99 6

95.7 81.6 13.

, 14.

15.

UNIT AVAILABILITYFACTOR g2 UNIT CAPACITY FACTOR J3................

UNIT FORCED OUTAGE RATE J4 8

5 94.2

'1.5

93. 9 90.4 3.8 78.7
67. 0 4.1 16.

17.

SHUTDOWNS SCIIEDULED OVER NEXT 6 MONHIS (TYPE, DATE AND DURATION OF EACH):

Oct.: ?0 - Nov, 30,.1975 - Refueling, Maintenance and 1nspections.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIhfATED DATE OF STARTUP:

'I Jg REACTOR AVAILABILITY FACTOR '~5 ~&OR WAS CRITI~ X 100 GROSS HOURS IN REPOI<TIN PERIOD HOURS GENEIWfOR ON LINE X 100 J2 UNIT AVAILABILITYFACTOR =

GRpSS HOUI~ IN REppgT PEIupD J3 UNIT CAPACITY FACTPR NEf ELECTRICAI. POWER GENERATED X 100 MAX. Dl;PEiVDABI.E CAPACI'I'Y X GROSS HOURS IN REPOIQ'ERIOD 4

UNIT OUTAGE RA'IT:

FORCED OUTAGE I'IOURS X 140 IIOVIS GL'Nl!RKI'Pl< ON LINE +

FORCI!I) OIJI'AGE IIPVI6

4r-lf

Spg<g<Y:

Unit No.

3 operated at 1004 R.P. for entire month except for'oad reduction

.on august ll, 1975, to repai conden'ser tube leak and reactor.triPs on August 26, 1975.

~

g

~

DOCKET NO.

50-250 UNIT NAME TURKEY POINT UNXT NO ~

3 SEPTEMBER 5, 1975 PREPARED By MARYLEE MONTGOMERY.

TELEPHONE 05 2 5-Ext.

REPORT. MONTH AUGUST, 1975

U N I T S H U T D 0 N N S / R E D U C T I 0 N S NO.'.

DATE I'E F-FORCED

'-SCHEDULED DURATION HOURS)

REASON "'.

METHOD OF SHUTTING DOte GK REACTOR

    • 'O&iENTS 25 75-08-,11 N/A'oad on Unxt No.

3 was reduced to repair condenser tube leak (Non-nuclear system) 26 75-08-. 26 27 75-08-26 3.2

.7. 8 A

'3 Reactor was tripped on No.

3C reactor coolant pump breaker open coincident with reactor power greater than 45% R.P.

caused by incipient failure of a, coil in. Unit No.

3 reactor protection system.

(Nuclear system)

Reactor was tripped on No.

3C reactor coolant pump breaker open coincident with reactor power greater than 45% R.P.

caused by the failure of a coil in Unit, No.

3 reactor protection system.

(Nuclear system)

REASON:

A-EQUIPMENl FAILURE ~EXPLAIN)

B-hfAINT. OR TEST C-REFUELING D REGULATORY RESTRICTION E-OPERATOR TRAINING AM)

LICENSE EXAMINATION F-AMINISTRATIVE G-OPERATIOM' ERROR H-05ER (EPLAQQ l ** h+THOD.

1-~iShiUAL 2-hKVJAL SCRAM

. 3-AUTCiQTIC SCRAhf

ENCLOSURE A DOCKET NO.

50-251 UNIT NAME TURKEY POINT UNIT NO.

4 SEPTEMBER 5, 1975 COMPLETED BY TELEPHONE NO.

MARYLEE MONTGOMERY 305 245-2910

'DAILY 'UNIT POWER OUTPUT AUGUST, 1975 DAY AVERACE DAILYMite-net

.. DAY AVEBA(Z DAILY M<e-net

~

3

~ 622 609 10 20 22 644 647 23.

653 652'47 10 267

" 644 692 642 598 26 27 28 29 30 "643 641 "640 643 638 644 646 649 647 642 NOTE:

~.

Daily average power level greater than 666 MWe, due to cooler condenser cool-water.

64

DOCKET NO. 50-251 UNIT N/WL:.

TURKEY POll UNIT NO.

I[ATE, 'EPTEMBER 5, 1975 (Q4fPI.Q'I'L'D'Y MARYLEE MONTGOMERY TELEPI IONE 305 245-2910 Ext.

228 ORT MONTH AUGUST, 1975 OPERAT I N G STATUS REPORTING PERIOD:

0001 75 08 01 TI.IROUGH 2400 GROSS JIOURS IN REPORTING PEI110D:

2.

CURRENTLY AVEORIZED POWER LEVEL (Mft) 2200 MAX. DEPEND.

CAPACITY (Mfe NET) '66 3.

PPNER LEVEL Tp lNICH RESTRICTED (IF ANY): (Mlle NET) 4.

REASONS FOR RESTRICTIOiNS (IF ANY):

75 08 31 None 5.

NUMBER OF HOURS IHE REACTOR WAS THIS MOTS YR-Tp-DATE CUiV3LATIVE Tp DATE CRITICAL

~ o ~

~

~ ~ ~ '

~ ~

~

~ ~

~ ~

~

~

~

~

~

~ ~

~

~ ~

~

~ ~ ~ ~

0 0 ~

6.

REACTOR RESERVE SHIJI'JNNN HOURS........ 3 663.2 12 997.1 7.

JlPURS GENERATOR ON LINE.. ~... ~........

590 4

3 561.7 12 619. 5 8.'.'NIT RESERVE SFIUTDONN HOURS............ 9.

GROSS TFIERii9Q. ENERGY GENEIQTED{MIQ)....

1 282 ill 7 '550 826 25 903 036 10.

12.

13.

14.

GROSS'LECTRICAL ENERGY GENERATED (MIfFI) ~

~

~

~

~

~

~

~

~

~

~

~

~

~

~ o

~

~

~ ~

~ ~ ~

~

~

~ ~ ~ ~ ~

~

~

~

~

NET ELECTRICAL ENERGY GENERATED (MS)..

REACTOR AVAILABILITYFACTOR Ql UNIT AVAILABILITYFACTOR +2............

I UNIT CAPACITY FACTOR g3,.............;.

80. 7
79. 3
75. 9
62. 8
61. 1
58. 6 396 710 2 403 336 376 310 2 277 006 8 177 597 7 746 062
74. 8 72.6 68.2 15.

16.

UNIT FORCED OUTAGE RATE J4 SHIJIDO1'SS SCHEDULED OVER NEXT 6 MpiVHIS (TYPE, DATE AND 0.2 DURATION OF EACII):

4.0 Sept.

13-19, 1975 Scheduled 'Maintenance 17.

IF SFIUTDONN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

J$

REACTOR AVAILABILITYIACTpR HOWS ~&OR WAS CRITI~ X 100 GROSS HOURS IN REPOIG'IN PERIOD HOURS GENERATOR ON LINE X 100 2

UNIT AVAI~ILITYFA~R =

GRpSS FIOUI& IN REpplg'I"PEIgpD UNIT CAPACITY FAVOR = NET El'I!CTRICAI'OWER GENERATED X 100 IIAX. DliVL'NDABLECAVACI'IY X GROSS IIOURS IN REPORT PERIOD 4

UNIT OUTAGE RATE = FOR ED OUTAGI! IIOURS X 100 JIOVRS Gl.'.Nf!IKlQR PN I.INL' FORCED OU'I'AGE I IOURS

SQ&f'EY: Unit No..

4 operated at 100%

R.P. except for scheduled maintenance shutdown August 8-9, 1975 and a load reduction on August 12, 1975 DOCKET NO; 50-251

~

PilIT k01E TURKEY POINT UNIT NO.

4 SEPTEIMER 5, 1975 PREPARED BY MARYLEE MONTGOMERY TELEPHONE 30 245-2910 Ext.

8 REPORT M3iVHH AUGUST, 1975 U N I T S H U T D 0 N N S / R E D U C T I 0 N S iXO..

DATE

'I PE F-FORCED

'-SCHEDULED DURATION (HOURS)

REASON "

ME'IHOD OF SHtJITING DOWN

%HE REACIOR **

COUNTS 11 75-08-03 153.7 Unit No.

4 was removed from service. (controlled manual shutdown) to repair No." 4B steam generator tube leak (small leak in one of 3,260 tube).

There were no significant quantities of radio-active material released as a result of this small leak.

(Nuclear system) 12 75-08-12 N/A Load on Unit No.

4 was'utomatically reduced to approximately 70% R.P. by No.

4 reactor protection system caused by loss of power supply to control rod drive mechanism H-4.

(Nuclear system)

REASON i

A"EQJIPMENT FAILURE (EXPLAIN B-MAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION i

  • F"ADMINISTRATIVE G-OPERATION'2 ERROR H-GIBER (EXPLAIN)

! ** MEIHOD:

1-14MAL

~,'-NA'UALSCRAM 3-AUTOMATIC SCRAM

4