Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
MONT)II.Y REPORTS (FOR GRAY HOOK PREPARATION)
NRC DISTRIBUTION FOR PART 5 .OCKET MATERIAL (TEMPORARY FORM)
CONTROL NO: 6 0 FI jE HolrfIILY REPQRT F,
~
FROM Flordia Power 8 Light Co. DATE OF DOC DATE R EC'D LTR TWX RPT OTHER Miami. Flordia A. . Schmi t ORIG CC OTHER SENT AEC PDR 1 Si ned SENT LOCAL PDR~~
CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKS T NO:
go-kg DESCRIPTION: ENCLOSURES:
Ltr trans the following: Monthly Report for Au st 1 Plant & Component Operability & Availabilit This Report to be used in preparing Gray H by Plans & Operations.
NEIBER OF COPIES REC'D:
PLANT NAME: Turkey Point 8 384 FOR-ACTION/INFO RMATION AB BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)
W/'opies W/ Copies . W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) /LEAR (L)
W/ Copies +O NOT ~+<~oyp PARR (L) VASSALLO (L) KNIGHTON (E) SPELS W/ Copies W/ Copies . W/ Copies W/ Cop,tgsn KNIEL (L) PURPLE (L) YOUNGBLOOD (E)~ MIPc/R'~KIIWLED@@@
. 'W/ Copies ~
W/ Copies W/ Copies W.4 Copies'NTERNAL DISTRIBUTION F TECH REVIEW DENTON LIC ASST A/T IND .
~ OGC,NRC PDR ROOM P.506A SCHROEDER MACCARY G R IMES R. DIGGS (L) BRAITMAN SALTZMAN H. GEAR IN (L) 'AMMILL GOSSI CK/STAFF KNIGHT KASTNER E, GOULBOURNE (L) ME LTZ, CASE PAW LIC K I BALLARD p. KREUTZER (E)
GIAMBUSSO SHAO SPANG LE R J. LE E (L) PLANS BOYD STELLO M. RUS:IHV,CCK (L) MCDONALD'
'OORE (L) HOUSTON E NVI RO ~
S. R F F D (E) CHAPMAN DEYOUNG (L) NOVAK MULLER M. SERVICE (L) DUDE (Ltr)
SKOVHOL1 (L') ROSS DICKER S. SHEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS TEDESCO YOUNG BLOOD H. SMITH (L) HARTFIELD (2)
DENISE, J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILLIAMS (E) EISENHUT FII F A RFGION (2) BENAROYA V. WILSON (L) WIGG INTON VOLLMER HAR LESS ~R. INGRAM (L)
~
STEELE )~IDUN AN EXTERNAL DISTRIBUTION
~1 LOCAL PDR ~mj, Flordia PD R-SAN/LA/NY
~1 TIC (ADERNATIIY) (1)(2)(10) NATIONALLABS 1
BROOKHAVEN NAT LAB
~1 NSIC (BUCHANAN) 1 W. PFNNINGTON, Rm E-201 GT 1 1 ASLD CONSULTANTS G. ULR I KSON, OR N L
'EWMARK/8LUME/AGBABIAN 1 1 1 Newton Anderson .
1 AGMFD (RUTH GUSSMA Rm B.127 GT 1 J. D, RUNKLES, Rm E-20
0 P.O. BOX 013100 MIAMI,FLA. 33101 nitat0TJJ pjle cubi
.:~~i ~
FLOIIIDA POWEA 5 LIGHT COMPANY 0:RLIit") i )
. ~EF'22197> m 6 II.S. PIIPiI,)y~T (SIIuI ~; y'I q LaII gq-!I;1 September 9, 1975 Office of Management Information, and Program Controls U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:
Attached are the August, 1975 Operating Status Reports for Turkey Point Units Nos. 3 and 4.
Very truly yours, A. . Schmidt Vice President Power Resources VTC/dd Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esquire gdI ~tlat P ggckel C44 SBBQ V
H C LP) NG BUILD FLORIDA
ENCLOSURE A DOCKET NO.
UNIT NAME TURKEY POINT DATE Se tember 5 1975 Kh%'LETED BY Mar lee Mont orner TELEPHONE NO. 305 245-2910 Ext. 228
'DAILY UNIT P01fER OUTPUT MiVK DAY AVERAGE DAILY Mfe-net DAY AVERAGE DAILY Mfe-net
'67 20 654 2 666 21 3 660 22 4 657 23 652'49 24 664-25 6 8 7 648 26 383 661 27 224'.45 9 668 28 10 665 29 '648
' '651 631 30 461 31 13 654 650'aily 657 657 NOTE: average power level 15 greater than 666 MWe, due 659 to cooler condenser cool-16 water.
657 18 657 19 653
DOCKET NO. 50-250 REPORT MONTH AUGUST, 1975 UiMI'I'Ahfl.. ~ TURKEY POINT IT No Se temb'er 1 DA'IT-'Pi~fPI,E'I'I',D BY TELEPI IPNE 30 245-2910 EXT. 228 OPERATING STATUS REPORTING PERIOD' 1 75 08 01 THROUGH 2400 75 08 31 GROSS IIOURS IN REPPI<TING PL'RIOD: 744. 0
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) 2200 MAX. DEPEND. CAPACITY (MWo NET) 666
- 3. POWER LEVEL 'Tp 1CIICH RESTRICTED (IF ANY): (hfffe NET) NONE REASONS FOR RESTRICTIONS (IF ANY):
THIS CUiiJLATIVE hfPNIH 'R-Tp-DATE TO DATE
- 5. MNBER OF HOURS THE REACTOR WAS CRITICAL o ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ I'40.
~ ~ g, ~ ~ ~ 9 5 577. 4 '9 605.2
- 6. REACTOR RESERVE SITDOWN HOURS ........ -'0- 7~ HOURS GENERATOR OiN LINE ...........'.... 733.0 5 476.3 18 894. 6 p
UNIT. RESERVE SI UTDOWN HOURS .....;..... 85 0
- 9. GROSS THERhfAL ENERGY'GBKRATED(MWH)....
- 10. GROSS 'LECTRICAL EiiERGY GENEIQTED OM3).........................'......... 490 895 3 665 066 11 092 871 ll; NET ELECTRICAL ENERGY GENERATED (ii1$) .. 466 603 3 509 475 10 490 640
- 12. REACTOR AVAILABILITYFACTOR Ql 99 6 95.7 81.6
- 13. UNIT AVAILABILITYFACTOR g2 8 5 93. 9 78.7
, 14. UNIT CAPACITY FACTOR J3 ................ 94.2 90.4 67. 0
- 15. UNIT FORCED OUTAGE RATE J4
'1.5 3.8 4.1
- 16. SHUTDOWNS SCIIEDULED OVER NEXT 6 MONHIS (TYPE, DATE AND DURATION OF EACH):
Oct.: ?0 - Nov, 30, .1975 - Refueling, Maintenance and 1nspections.
- 17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIhfATED DATE OF STARTUP: 'I Jg REACTOR AVAILAB ILITY FACTOR
'~5 ~&OR GROSS HOURS WAS CRI IN REPOI<TIN TI~ X 1 00 PERIOD HOURS GENEIWfOR ON LINE X 100 J2 UNIT AVAILABILITYFACTOR = GRpSS HOUI~ IN REppgT PEIupD NEf ELECTRICAI. POWER GENERATED X 100 J3 UN IT CAPACITY FACTPR Dl;PEiVDABI.E CAPACI'I'Y X GROSS MAX.
HOURS IN REPOIQ'ERIOD FORCED OUTAGE I'IOURS X 140 4 UNIT OUTAGE RA'IT: IIOVIS GL'Nl!RKI'Pl< ON LINE +
FORCI!I) OIJI'AGE I IPVI6
4 r-lf
DOCKET NO. 50-250 Spg<g<Y: Unit No. 3 operated at 1004 ~ g
~
UNIT NAME TURKEY POINT UNXT NO ~ 3 R.P. for entire month except for'oad reduction .on august conden'ser tube leak and ll, 1975, to repai reactor .triPs SEPTEMBER 5, 1975 on August 26, 1975. PREPARED By MARYLEE MONTGOMERY.
TELEPHONE 05 2 5- Ext.
REPORT. MONTH AUGUST, 1975 U N IT S H U T D 0 NN S / R E D U C T I0 N S I'E METHOD OF NO.'. DATE F-FORCED DURATION HOURS) REASON "'.
SHUTTING DOte GK ** 'O&iENTS
'oad
'-SCHEDULED REACTOR 25 75-08-,11 N/A on Unxt No. 3 was reduced to repair condenser tube leak (Non-nuclear system) 26 75-08-. 26 3.2 '3 Reactor was tripped on No. 3C reactor coolant pump breaker open coincident with reactor power greater than 45% R.P.
caused by incipient failure of a, coil in. Unit No. 3 reactor protection system. (Nuclear system) 27 75-08-26 .7. 8 A Reactor was tripped on No. 3C reactor coolant pump breaker open coincident with reactor power greater than 45% R.P.
caused by the failure of a coil in Unit, No. 3 reactor protection system. (Nuclear system)
A-EQUIPMENl FAILURE ~EXPLAIN) 1-~iShiUAL B-hfAINT. OR TEST 2-hKVJAL SCRAM C-REFUELING . 3-AUTCiQTIC SCRAhf D REGULATORY RESTRICTION E-OPERATOR TRAINING AM)
LICENSE EXAMINATION F-AMINISTRATIVE G-OPERATIOM' ERROR H-05ER (EPLAQQ
ENCLOSURE A DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT NO. 4 SEPTEMBER 5, 1975 COMPLETED BY MARYLEE MONTGOMERY TELEPHONE NO. 305 245-2910
'DAILY 'UNIT POWER OUTPUT AUGUST, 1975 DAY AVERACE DAILY Mite-net .. DAY AVEBA(Z DAILY M<e-net
~
622 20 644 609 647
~
3 10 22
- 23. 653 652'47 26 27 "643 267 28 641 10 644 29 "640 692 30 643 642 638 598 644 646 NOTE: Daily average power level greater than 666 MWe, due 649 to cooler condenser cool-
~. water.
647 642 64
DOCKET NO. 50-251 TURKEY POll UNIT NO. ORT MONTH AUGUST, 1975 UNIT N/WL:.
I[ATE, 'EPTEMBER 5, 1975 (Q4fPI.Q'I'L'D'Y MARYLEE MONTGOMERY TELEPI IONE 305 245-2910 Ext. 228 OPERAT I N G STATUS REPORTING PERIOD: 0001 75 08 01 TI.IROUGH 2400 75 08 31 GROSS JIOURS IN REPORTING PEI110D:
- 2. CURRENTLY AVEORIZED POWER LEVEL MAX. DEPEND. CAPACITY (Mfe NET)
(Mft)
'66 2200
- 3. PPNER LEVEL Tp lNICH RESTRICTED (IF ANY): (Mlle NET) None
- 4. REASONS FOR RESTRICTIOiNS (IF ANY):
THIS CUiV3LATIVE MOTS YR-Tp-DATE Tp DATE
- 5. NUMBER OF HOURS IHE REACTOR WAS CRITICAL ~ o ~ ~ ~ ~ ~' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 00 ~ 3 663.2 12 997.1
- 6. REACTOR RESERVE SHIJI'JNNN HOURS ........ 7. JlPURS GENERATOR ON LINE .. ~... ~........ 590 4 3 561.7 12 619. 5 8.'.'NIT RESERVE SFIUTDONN HOURS ............ 9. GROSS TFIERii9Q. ENERGY GENEIQTED{MIQ).... 1 282 ill 7 '550 826 25 903 036
- 10. GROSS'LECTRICAL ENERGY GENERATED (MIfFI) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 396 710 2 403 336 8 177 597 NET ELECTRICAL ENERGY GENERATED (MS) .. 376 310 2 277 006 7 746 062
- 12. REACTOR AVAILABILITYFACTOR Ql 80. 7 62. 8 74. 8
- 13. UNIT AVAILABILITYFACTOR +2 ............ I
- 79. 3 61. 1 72.6
- 14. UNIT CAPACITY FACTOR g3,.............;. 75. 9 58. 6 68.2
- 15. UNIT FORCED OUTAGE RATE J4 0.2 4.0
- 16. SHIJIDO1'SS SCHEDULED OVER NEXT 6 MpiVHIS (TYPE, DATE AND DURATION OF EACII):
Sept. 13-19, 1975 Scheduled 'Maintenance
- 17. IF SFIUTDONN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
REACTOR AVAILABILITYIACTpR HOWS ~&OR WAS CRITI~ X 100 J$
GROSS HOURS IN REPOIG'IN PERIOD HOURS GENERATOR ON LINE X 100 2 UNIT AVAI~ILITYFA~R =
GRpSS FIOUI& IN REpplg'I"PEIgpD NET El'I!CTRICAI'OWER GENERATED X 100 UNIT CAPACITY FAVOR =
IIAX. DliVL'NDABLE CAVACI'IY X GROSS IIOURS IN REPORT PERIOD FOR ED OUTAGI! IIOURS X 100 4 UNIT OUTAGE RATE =
JIOVRS Gl.'.Nf!IKlQR PN I.INL' FORCED OU'I'AGE I IOURS
DOCKET NO; 50-251 SQ&f'EY: Unit No.. 4 operated at 100% ~
" PilIT k01E TURKEY POINT UNIT NO. 4 R.P. except for scheduled maintenance shutdown August 8-9, 1975 and a load SEPTEIMER 5, 1975 reduction on August 12, 1975 PREPARED BY MARYLEE MONTGOMERY TELEPHONE 30 245-2910 Ext. 8 REPORT M3iVHH AUGUST, 1975 U N IT S H U T D 0 NN S /REDUCTI0NS
'I PE ME'IHOD OF F-FORCED DURATION SHtJITING DOWN iXO.. DATE '-SCHEDULED (HOURS) REASON " %HE REACIOR
- COUNTS 11 75-08-03 153.7 Unit No. 4 was removed from service. (controlled manual shutdown) to repair No." 4B steam generator tube leak (small leak in radio- one of 3,260 tube). There were no significant quantitiesleak. of active material released as a result of this small (Nuclear system) 12 75-08-12 N/A Load on Unit No. 4 was'utomatically reduced to approximately 70% R.P. by No. 4 reactor protection system caused by loss of power supply to control rod drive mechanism H-4. (Nuclear system)
"* REASON !
i A"EQJIPMENT FAILURE (EXPLAIN 1-14MAL B-MAINT. OR TEST ~,'-NA'UAL SCRAM C-REFUELING .! 3-AUTOMATIC SCRAM D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION i
- F"ADMINISTRATIVE G-OPERATION'2 ERROR H-GIBER (EXPLAIN)
4