Attached August, 1975, Operating Status Reports for Turkey Point Unit Nos. 3 & 4
ML18227A396
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/09/1975
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A396 (15)


Text

MONT)II.Y REPORTS (FOR GRAY HOOK PREPARATION)

NRC DISTRIBUTION FOR PART 5 .OCKET MATERIAL (TEMPORARY FORM)

CONTROL NO: 6 0 FI jE HolrfIILY REPQRT F,

~

FROM Flordia Power 8 Light Co. DATE OF DOC DATE R EC'D LTR TWX RPT OTHER Miami. Flordia A. . Schmi t ORIG CC OTHER SENT AEC PDR 1 Si ned SENT LOCAL PDR~~

CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKS T NO:

go-kg DESCRIPTION: ENCLOSURES:

Ltr trans the following: Monthly Report for Au st 1 Plant & Component Operability & Availabilit This Report to be used in preparing Gray H by Plans & Operations.

NEIBER OF COPIES REC'D:

PLANT NAME: Turkey Point 8 384 FOR-ACTION/INFO RMATION AB BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)

W/'opies W/ Copies . W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) /LEAR (L)

W/ Copies +O NOT ~+<~oyp PARR (L) VASSALLO (L) KNIGHTON (E) SPELS W/ Copies W/ Copies . W/ Copies W/ Cop,tgsn KNIEL (L) PURPLE (L) YOUNGBLOOD (E)~ MIPc/R'~KIIWLED@@@

. 'W/ Copies ~

W/ Copies W/ Copies W.4 Copies'NTERNAL DISTRIBUTION F TECH REVIEW DENTON LIC ASST A/T IND .

~ OGC,NRC PDR ROOM P.506A SCHROEDER MACCARY G R IMES R. DIGGS (L) BRAITMAN SALTZMAN H. GEAR IN (L) 'AMMILL GOSSI CK/STAFF KNIGHT KASTNER E, GOULBOURNE (L) ME LTZ, CASE PAW LIC K I BALLARD p. KREUTZER (E)

GIAMBUSSO SHAO SPANG LE R J. LE E (L) PLANS BOYD STELLO M. RUS:IHV,CCK (L) MCDONALD'

'OORE (L) HOUSTON E NVI RO ~

S. R F F D (E) CHAPMAN DEYOUNG (L) NOVAK MULLER M. SERVICE (L) DUDE (Ltr)

SKOVHOL1 (L') ROSS DICKER S. SHEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS TEDESCO YOUNG BLOOD H. SMITH (L) HARTFIELD (2)

DENISE, J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILLIAMS (E) EISENHUT FII F A RFGION (2) BENAROYA V. WILSON (L) WIGG INTON VOLLMER HAR LESS ~R. INGRAM (L)

~

STEELE )~IDUN AN EXTERNAL DISTRIBUTION

~1 LOCAL PDR ~mj, Flordia PD R-SAN/LA/NY

~1 TIC (ADERNATIIY) (1)(2)(10) NATIONALLABS 1

BROOKHAVEN NAT LAB

~1 NSIC (BUCHANAN) 1 W. PFNNINGTON, Rm E-201 GT 1 1 ASLD CONSULTANTS G. ULR I KSON, OR N L

'EWMARK/8LUME/AGBABIAN 1 1 1 Newton Anderson .

1 AGMFD (RUTH GUSSMA Rm B.127 GT 1 J. D, RUNKLES, Rm E-20

0 P.O. BOX 013100 MIAMI,FLA. 33101 nitat0TJJ pjle cubi

.:~~i ~

FLOIIIDA POWEA 5 LIGHT COMPANY 0:RLIit") i )

. ~EF'22197> m 6 II.S. PIIPiI,)y~T (SIIuI ~; y'I q LaII gq-!I;1 September 9, 1975 Office of Management Information, and Program Controls U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:

Attached are the August, 1975 Operating Status Reports for Turkey Point Units Nos. 3 and 4.

Very truly yours, A. . Schmidt Vice President Power Resources VTC/dd Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esquire gdI ~tlat P ggckel C44 SBBQ V

H C LP) NG BUILD FLORIDA

ENCLOSURE A DOCKET NO.

UNIT NAME TURKEY POINT DATE Se tember 5 1975 Kh%'LETED BY Mar lee Mont orner TELEPHONE NO. 305 245-2910 Ext. 228

'DAILY UNIT P01fER OUTPUT MiVK DAY AVERAGE DAILY Mfe-net DAY AVERAGE DAILY Mfe-net

'67 20 654 2 666 21 3 660 22 4 657 23 652'49 24 664-25 6 8 7 648 26 383 661 27 224'.45 9 668 28 10 665 29 '648

' '651 631 30 461 31 13 654 650'aily 657 657 NOTE: average power level 15 greater than 666 MWe, due 659 to cooler condenser cool-16 water.

657 18 657 19 653

DOCKET NO. 50-250 REPORT MONTH AUGUST, 1975 UiMI'I'Ahfl.. ~ TURKEY POINT IT No Se temb'er 1 DA'IT-'Pi~fPI,E'I'I',D BY TELEPI IPNE 30 245-2910 EXT. 228 OPERATING STATUS REPORTING PERIOD' 1 75 08 01 THROUGH 2400 75 08 31 GROSS IIOURS IN REPPI<TING PL'RIOD: 744. 0

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) 2200 MAX. DEPEND. CAPACITY (MWo NET) 666
3. POWER LEVEL 'Tp 1CIICH RESTRICTED (IF ANY): (hfffe NET) NONE REASONS FOR RESTRICTIONS (IF ANY):

THIS CUiiJLATIVE hfPNIH 'R-Tp-DATE TO DATE

5. MNBER OF HOURS THE REACTOR WAS CRITICAL o ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ I'40.

~ ~ g, ~ ~ ~ 9 5 577. 4 '9 605.2

6. REACTOR RESERVE SITDOWN HOURS ........ -'0- 7~ HOURS GENERATOR OiN LINE ...........'.... 733.0 5 476.3 18 894. 6 p

UNIT. RESERVE SI UTDOWN HOURS .....;..... 85 0

9. GROSS THERhfAL ENERGY'GBKRATED(MWH)....
10. GROSS 'LECTRICAL EiiERGY GENEIQTED OM3).........................'......... 490 895 3 665 066 11 092 871 ll; NET ELECTRICAL ENERGY GENERATED (ii1$) .. 466 603 3 509 475 10 490 640
12. REACTOR AVAILABILITYFACTOR Ql 99 6 95.7 81.6
13. UNIT AVAILABILITYFACTOR g2 8 5 93. 9 78.7

, 14. UNIT CAPACITY FACTOR J3 ................ 94.2 90.4 67. 0

15. UNIT FORCED OUTAGE RATE J4

'1.5 3.8 4.1

16. SHUTDOWNS SCIIEDULED OVER NEXT 6 MONHIS (TYPE, DATE AND DURATION OF EACH):

Oct.: ?0 - Nov, 30, .1975 - Refueling, Maintenance and 1nspections.

17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIhfATED DATE OF STARTUP: 'I Jg REACTOR AVAILAB ILITY FACTOR

'~5 ~&OR GROSS HOURS WAS CRI IN REPOI<TIN TI~ X 1 00 PERIOD HOURS GENEIWfOR ON LINE X 100 J2 UNIT AVAILABILITYFACTOR = GRpSS HOUI~ IN REppgT PEIupD NEf ELECTRICAI. POWER GENERATED X 100 J3 UN IT CAPACITY FACTPR Dl;PEiVDABI.E CAPACI'I'Y X GROSS MAX.

HOURS IN REPOIQ'ERIOD FORCED OUTAGE I'IOURS X 140 4 UNIT OUTAGE RA'IT: IIOVIS GL'Nl!RKI'Pl< ON LINE +

FORCI!I) OIJI'AGE I IPVI6

4 r-lf

DOCKET NO. 50-250 Spg<g<Y: Unit No. 3 operated at 1004 ~ g

~

UNIT NAME TURKEY POINT UNXT NO ~ 3 R.P. for entire month except for'oad reduction .on august conden'ser tube leak and ll, 1975, to repai reactor .triPs SEPTEMBER 5, 1975 on August 26, 1975. PREPARED By MARYLEE MONTGOMERY.

TELEPHONE 05 2 5- Ext.

REPORT. MONTH AUGUST, 1975 U N IT S H U T D 0 NN S / R E D U C T I0 N S I'E METHOD OF NO.'. DATE F-FORCED DURATION HOURS) REASON "'.

SHUTTING DOte GK ** 'O&iENTS

'oad

'-SCHEDULED REACTOR 25 75-08-,11 N/A on Unxt No. 3 was reduced to repair condenser tube leak (Non-nuclear system) 26 75-08-. 26 3.2 '3 Reactor was tripped on No. 3C reactor coolant pump breaker open coincident with reactor power greater than 45% R.P.

caused by incipient failure of a, coil in. Unit No. 3 reactor protection system. (Nuclear system) 27 75-08-26 .7. 8 A Reactor was tripped on No. 3C reactor coolant pump breaker open coincident with reactor power greater than 45% R.P.

caused by the failure of a coil in Unit, No. 3 reactor protection system. (Nuclear system)

  • REASON: l ** h+THOD.

A-EQUIPMENl FAILURE ~EXPLAIN) 1-~iShiUAL B-hfAINT. OR TEST 2-hKVJAL SCRAM C-REFUELING . 3-AUTCiQTIC SCRAhf D REGULATORY RESTRICTION E-OPERATOR TRAINING AM)

LICENSE EXAMINATION F-AMINISTRATIVE G-OPERATIOM' ERROR H-05ER (EPLAQQ

ENCLOSURE A DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT NO. 4 SEPTEMBER 5, 1975 COMPLETED BY MARYLEE MONTGOMERY TELEPHONE NO. 305 245-2910

'DAILY 'UNIT POWER OUTPUT AUGUST, 1975 DAY AVERACE DAILY Mite-net .. DAY AVEBA(Z DAILY M<e-net

~

622 20 644 609 647

~

3 10 22

23. 653 652'47 26 27 "643 267 28 641 10 644 29 "640 692 30 643 642 638 598 644 646 NOTE: Daily average power level greater than 666 MWe, due 649 to cooler condenser cool-

~. water.

647 642 64

DOCKET NO. 50-251 TURKEY POll UNIT NO. ORT MONTH AUGUST, 1975 UNIT N/WL:.

I[ATE, 'EPTEMBER 5, 1975 (Q4fPI.Q'I'L'D'Y MARYLEE MONTGOMERY TELEPI IONE 305 245-2910 Ext. 228 OPERAT I N G STATUS REPORTING PERIOD: 0001 75 08 01 TI.IROUGH 2400 75 08 31 GROSS JIOURS IN REPORTING PEI110D:

2. CURRENTLY AVEORIZED POWER LEVEL MAX. DEPEND. CAPACITY (Mfe NET)

(Mft)

'66 2200

3. PPNER LEVEL Tp lNICH RESTRICTED (IF ANY): (Mlle NET) None
4. REASONS FOR RESTRICTIOiNS (IF ANY):

THIS CUiV3LATIVE MOTS YR-Tp-DATE Tp DATE

5. NUMBER OF HOURS IHE REACTOR WAS CRITICAL ~ o ~ ~ ~ ~ ~' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 00 ~ 3 663.2 12 997.1
6. REACTOR RESERVE SHIJI'JNNN HOURS ........ 7. JlPURS GENERATOR ON LINE .. ~... ~........ 590 4 3 561.7 12 619. 5 8.'.'NIT RESERVE SFIUTDONN HOURS ............ 9. GROSS TFIERii9Q. ENERGY GENEIQTED{MIQ).... 1 282 ill 7 '550 826 25 903 036
10. GROSS'LECTRICAL ENERGY GENERATED (MIfFI) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 396 710 2 403 336 8 177 597 NET ELECTRICAL ENERGY GENERATED (MS) .. 376 310 2 277 006 7 746 062
12. REACTOR AVAILABILITYFACTOR Ql 80. 7 62. 8 74. 8
13. UNIT AVAILABILITYFACTOR +2 ............ I
79. 3 61. 1 72.6
14. UNIT CAPACITY FACTOR g3,.............;. 75. 9 58. 6 68.2
15. UNIT FORCED OUTAGE RATE J4 0.2 4.0
16. SHIJIDO1'SS SCHEDULED OVER NEXT 6 MpiVHIS (TYPE, DATE AND DURATION OF EACII):

Sept. 13-19, 1975 Scheduled 'Maintenance

17. IF SFIUTDONN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR AVAILABILITYIACTpR HOWS ~&OR WAS CRITI~ X 100 J$

GROSS HOURS IN REPOIG'IN PERIOD HOURS GENERATOR ON LINE X 100 2 UNIT AVAI~ILITYFA~R =

GRpSS FIOUI& IN REpplg'I"PEIgpD NET El'I!CTRICAI'OWER GENERATED X 100 UNIT CAPACITY FAVOR =

IIAX. DliVL'NDABLE CAVACI'IY X GROSS IIOURS IN REPORT PERIOD FOR ED OUTAGI! IIOURS X 100 4 UNIT OUTAGE RATE =

JIOVRS Gl.'.Nf!IKlQR PN I.INL' FORCED OU'I'AGE I IOURS

DOCKET NO; 50-251 SQ&f'EY: Unit No.. 4 operated at 100% ~

" PilIT k01E TURKEY POINT UNIT NO. 4 R.P. except for scheduled maintenance shutdown August 8-9, 1975 and a load SEPTEIMER 5, 1975 reduction on August 12, 1975 PREPARED BY MARYLEE MONTGOMERY TELEPHONE 30 245-2910 Ext. 8 REPORT M3iVHH AUGUST, 1975 U N IT S H U T D 0 NN S /REDUCTI0NS

'I PE ME'IHOD OF F-FORCED DURATION SHtJITING DOWN iXO.. DATE '-SCHEDULED (HOURS) REASON " %HE REACIOR

    • COUNTS 11 75-08-03 153.7 Unit No. 4 was removed from service. (controlled manual shutdown) to repair No." 4B steam generator tube leak (small leak in radio- one of 3,260 tube). There were no significant quantitiesleak. of active material released as a result of this small (Nuclear system) 12 75-08-12 N/A Load on Unit No. 4 was'utomatically reduced to approximately 70% R.P. by No. 4 reactor protection system caused by loss of power supply to control rod drive mechanism H-4. (Nuclear system)

"* REASON  !

    • MEIHOD:

i A"EQJIPMENT FAILURE (EXPLAIN 1-14MAL B-MAINT. OR TEST ~,'-NA'UAL SCRAM C-REFUELING .! 3-AUTOMATIC SCRAM D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION i

  • F"ADMINISTRATIVE G-OPERATION'2 ERROR H-GIBER (EXPLAIN)

4