MONTHYEARIR 05000250/20240032024-11-13013 November 2024 Integrated Inspection Report - 05000250/2024003 & 05000251/2024003 & Notice of Violation L-2024-188, Supplement to License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-11-12012 November 2024 Supplement to License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-187, Supplement to the Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-11-12012 November 2024 Supplement to the Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles ML24305A1482024-11-0606 November 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 ML24276A2162024-11-0101 November 2024 Request for Withholding Information from Public Disclosure L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, And Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 And Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
MONT)II.Y REPORTS (FOR GRAY HOOK PREPARATION)
NRC DISTRIBUTION FOR PART 5 .OCKET MATERIAL (TEMPORARY FORM)
CONTROL NO: 6 0 FI jE HolrfIILY REPQRT F,
~
FROM Flordia Power 8 Light Co. DATE OF DOC DATE R EC'D LTR TWX RPT OTHER Miami. Flordia A. . Schmi t ORIG CC OTHER SENT AEC PDR 1 Si ned SENT LOCAL PDR~~
CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKS T NO:
go-kg DESCRIPTION: ENCLOSURES:
Ltr trans the following: Monthly Report for Au st 1 Plant & Component Operability & Availabilit This Report to be used in preparing Gray H by Plans & Operations.
NEIBER OF COPIES REC'D:
PLANT NAME: Turkey Point 8 384 FOR-ACTION/INFO RMATION AB BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)
W/'opies W/ Copies . W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) /LEAR (L)
W/ Copies +O NOT ~+<~oyp PARR (L) VASSALLO (L) KNIGHTON (E) SPELS W/ Copies W/ Copies . W/ Copies W/ Cop,tgsn KNIEL (L) PURPLE (L) YOUNGBLOOD (E)~ MIPc/R'~KIIWLED@@@
. 'W/ Copies ~
W/ Copies W/ Copies W.4 Copies'NTERNAL DISTRIBUTION F TECH REVIEW DENTON LIC ASST A/T IND .
~ OGC,NRC PDR ROOM P.506A SCHROEDER MACCARY G R IMES R. DIGGS (L) BRAITMAN SALTZMAN H. GEAR IN (L) 'AMMILL GOSSI CK/STAFF KNIGHT KASTNER E, GOULBOURNE (L) ME LTZ, CASE PAW LIC K I BALLARD p. KREUTZER (E)
GIAMBUSSO SHAO SPANG LE R J. LE E (L) PLANS BOYD STELLO M. RUS:IHV,CCK (L) MCDONALD'
'OORE (L) HOUSTON E NVI RO ~
S. R F F D (E) CHAPMAN DEYOUNG (L) NOVAK MULLER M. SERVICE (L) DUDE (Ltr)
SKOVHOL1 (L') ROSS DICKER S. SHEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS TEDESCO YOUNG BLOOD H. SMITH (L) HARTFIELD (2)
DENISE, J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILLIAMS (E) EISENHUT FII F A RFGION (2) BENAROYA V. WILSON (L) WIGG INTON VOLLMER HAR LESS ~R. INGRAM (L)
~
STEELE )~IDUN AN EXTERNAL DISTRIBUTION
~1 LOCAL PDR ~mj, Flordia PD R-SAN/LA/NY
~1 TIC (ADERNATIIY) (1)(2)(10) NATIONALLABS 1
BROOKHAVEN NAT LAB
~1 NSIC (BUCHANAN) 1 W. PFNNINGTON, Rm E-201 GT 1 1 ASLD CONSULTANTS G. ULR I KSON, OR N L
'EWMARK/8LUME/AGBABIAN 1 1 1 Newton Anderson .
1 AGMFD (RUTH GUSSMA Rm B.127 GT 1 J. D, RUNKLES, Rm E-20
0 P.O. BOX 013100 MIAMI,FLA. 33101 nitat0TJJ pjle cubi
.:~~i ~
FLOIIIDA POWEA 5 LIGHT COMPANY 0:RLIit") i )
. ~EF'22197> m 6 II.S. PIIPiI,)y~T (SIIuI ~; y'I q LaII gq-!I;1 September 9, 1975 Office of Management Information, and Program Controls U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:
Attached are the August, 1975 Operating Status Reports for Turkey Point Units Nos. 3 and 4.
Very truly yours, A. . Schmidt Vice President Power Resources VTC/dd Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esquire gdI ~tlat P ggckel C44 SBBQ V
H C LP) NG BUILD FLORIDA
ENCLOSURE A DOCKET NO.
UNIT NAME TURKEY POINT DATE Se tember 5 1975 Kh%'LETED BY Mar lee Mont orner TELEPHONE NO. 305 245-2910 Ext. 228
'DAILY UNIT P01fER OUTPUT MiVK DAY AVERAGE DAILY Mfe-net DAY AVERAGE DAILY Mfe-net
'67 20 654 2 666 21 3 660 22 4 657 23 652'49 24 664-25 6 8 7 648 26 383 661 27 224'.45 9 668 28 10 665 29 '648
' '651 631 30 461 31 13 654 650'aily 657 657 NOTE: average power level 15 greater than 666 MWe, due 659 to cooler condenser cool-16 water.
657 18 657 19 653
DOCKET NO. 50-250 REPORT MONTH AUGUST, 1975 UiMI'I'Ahfl.. ~ TURKEY POINT IT No Se temb'er 1 DA'IT-'Pi~fPI,E'I'I',D BY TELEPI IPNE 30 245-2910 EXT. 228 OPERATING STATUS REPORTING PERIOD' 1 75 08 01 THROUGH 2400 75 08 31 GROSS IIOURS IN REPPI<TING PL'RIOD: 744. 0
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) 2200 MAX. DEPEND. CAPACITY (MWo NET) 666
- 3. POWER LEVEL 'Tp 1CIICH RESTRICTED (IF ANY): (hfffe NET) NONE REASONS FOR RESTRICTIONS (IF ANY):
THIS CUiiJLATIVE hfPNIH 'R-Tp-DATE TO DATE
- 5. MNBER OF HOURS THE REACTOR WAS CRITICAL o ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ I'40.
~ ~ g, ~ ~ ~ 9 5 577. 4 '9 605.2
- 6. REACTOR RESERVE SITDOWN HOURS ........ -'0- 7~ HOURS GENERATOR OiN LINE ...........'.... 733.0 5 476.3 18 894. 6 p
UNIT. RESERVE SI UTDOWN HOURS .....;..... 85 0
- 9. GROSS THERhfAL ENERGY'GBKRATED(MWH)....
- 10. GROSS 'LECTRICAL EiiERGY GENEIQTED OM3).........................'......... 490 895 3 665 066 11 092 871 ll; NET ELECTRICAL ENERGY GENERATED (ii1$) .. 466 603 3 509 475 10 490 640
- 12. REACTOR AVAILABILITYFACTOR Ql 99 6 95.7 81.6
- 13. UNIT AVAILABILITYFACTOR g2 8 5 93. 9 78.7
, 14. UNIT CAPACITY FACTOR J3 ................ 94.2 90.4 67. 0
- 15. UNIT FORCED OUTAGE RATE J4
'1.5 3.8 4.1
- 16. SHUTDOWNS SCIIEDULED OVER NEXT 6 MONHIS (TYPE, DATE AND DURATION OF EACH):
Oct.: ?0 - Nov, 30, .1975 - Refueling, Maintenance and 1nspections.
- 17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIhfATED DATE OF STARTUP: 'I Jg REACTOR AVAILAB ILITY FACTOR
'~5 ~&OR GROSS HOURS WAS CRI IN REPOI<TIN TI~ X 1 00 PERIOD HOURS GENEIWfOR ON LINE X 100 J2 UNIT AVAILABILITYFACTOR = GRpSS HOUI~ IN REppgT PEIupD NEf ELECTRICAI. POWER GENERATED X 100 J3 UN IT CAPACITY FACTPR Dl;PEiVDABI.E CAPACI'I'Y X GROSS MAX.
HOURS IN REPOIQ'ERIOD FORCED OUTAGE I'IOURS X 140 4 UNIT OUTAGE RA'IT: IIOVIS GL'Nl!RKI'Pl< ON LINE +
FORCI!I) OIJI'AGE I IPVI6
4 r-lf
DOCKET NO. 50-250 Spg<g<Y: Unit No. 3 operated at 1004 ~ g
~
UNIT NAME TURKEY POINT UNXT NO ~ 3 R.P. for entire month except for'oad reduction .on august conden'ser tube leak and ll, 1975, to repai reactor .triPs SEPTEMBER 5, 1975 on August 26, 1975. PREPARED By MARYLEE MONTGOMERY.
TELEPHONE 05 2 5- Ext.
REPORT. MONTH AUGUST, 1975 U N IT S H U T D 0 NN S / R E D U C T I0 N S I'E METHOD OF NO.'. DATE F-FORCED DURATION HOURS) REASON "'.
SHUTTING DOte GK ** 'O&iENTS
'oad
'-SCHEDULED REACTOR 25 75-08-,11 N/A on Unxt No. 3 was reduced to repair condenser tube leak (Non-nuclear system) 26 75-08-. 26 3.2 '3 Reactor was tripped on No. 3C reactor coolant pump breaker open coincident with reactor power greater than 45% R.P.
caused by incipient failure of a, coil in. Unit No. 3 reactor protection system. (Nuclear system) 27 75-08-26 .7. 8 A Reactor was tripped on No. 3C reactor coolant pump breaker open coincident with reactor power greater than 45% R.P.
caused by the failure of a coil in Unit, No. 3 reactor protection system. (Nuclear system)
A-EQUIPMENl FAILURE ~EXPLAIN) 1-~iShiUAL B-hfAINT. OR TEST 2-hKVJAL SCRAM C-REFUELING . 3-AUTCiQTIC SCRAhf D REGULATORY RESTRICTION E-OPERATOR TRAINING AM)
LICENSE EXAMINATION F-AMINISTRATIVE G-OPERATIOM' ERROR H-05ER (EPLAQQ
ENCLOSURE A DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT NO. 4 SEPTEMBER 5, 1975 COMPLETED BY MARYLEE MONTGOMERY TELEPHONE NO. 305 245-2910
'DAILY 'UNIT POWER OUTPUT AUGUST, 1975 DAY AVERACE DAILY Mite-net .. DAY AVEBA(Z DAILY M<e-net
~
622 20 644 609 647
~
3 10 22
- 23. 653 652'47 26 27 "643 267 28 641 10 644 29 "640 692 30 643 642 638 598 644 646 NOTE: Daily average power level greater than 666 MWe, due 649 to cooler condenser cool-
~. water.
647 642 64
DOCKET NO. 50-251 TURKEY POll UNIT NO. ORT MONTH AUGUST, 1975 UNIT N/WL:.
I[ATE, 'EPTEMBER 5, 1975 (Q4fPI.Q'I'L'D'Y MARYLEE MONTGOMERY TELEPI IONE 305 245-2910 Ext. 228 OPERAT I N G STATUS REPORTING PERIOD: 0001 75 08 01 TI.IROUGH 2400 75 08 31 GROSS JIOURS IN REPORTING PEI110D:
- 2. CURRENTLY AVEORIZED POWER LEVEL MAX. DEPEND. CAPACITY (Mfe NET)
(Mft)
'66 2200
- 3. PPNER LEVEL Tp lNICH RESTRICTED (IF ANY): (Mlle NET) None
- 4. REASONS FOR RESTRICTIOiNS (IF ANY):
THIS CUiV3LATIVE MOTS YR-Tp-DATE Tp DATE
- 5. NUMBER OF HOURS IHE REACTOR WAS CRITICAL ~ o ~ ~ ~ ~ ~' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 00 ~ 3 663.2 12 997.1
- 6. REACTOR RESERVE SHIJI'JNNN HOURS ........ 7. JlPURS GENERATOR ON LINE .. ~... ~........ 590 4 3 561.7 12 619. 5 8.'.'NIT RESERVE SFIUTDONN HOURS ............ 9. GROSS TFIERii9Q. ENERGY GENEIQTED{MIQ).... 1 282 ill 7 '550 826 25 903 036
- 10. GROSS'LECTRICAL ENERGY GENERATED (MIfFI) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 396 710 2 403 336 8 177 597 NET ELECTRICAL ENERGY GENERATED (MS) .. 376 310 2 277 006 7 746 062
- 12. REACTOR AVAILABILITYFACTOR Ql 80. 7 62. 8 74. 8
- 13. UNIT AVAILABILITYFACTOR +2 ............ I
- 79. 3 61. 1 72.6
- 14. UNIT CAPACITY FACTOR g3,.............;. 75. 9 58. 6 68.2
- 15. UNIT FORCED OUTAGE RATE J4 0.2 4.0
- 16. SHIJIDO1'SS SCHEDULED OVER NEXT 6 MpiVHIS (TYPE, DATE AND DURATION OF EACII):
Sept. 13-19, 1975 Scheduled 'Maintenance
- 17. IF SFIUTDONN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
REACTOR AVAILABILITYIACTpR HOWS ~&OR WAS CRITI~ X 100 J$
GROSS HOURS IN REPOIG'IN PERIOD HOURS GENERATOR ON LINE X 100 2 UNIT AVAI~ILITYFA~R =
GRpSS FIOUI& IN REpplg'I"PEIgpD NET El'I!CTRICAI'OWER GENERATED X 100 UNIT CAPACITY FAVOR =
IIAX. DliVL'NDABLE CAVACI'IY X GROSS IIOURS IN REPORT PERIOD FOR ED OUTAGI! IIOURS X 100 4 UNIT OUTAGE RATE =
JIOVRS Gl.'.Nf!IKlQR PN I.INL' FORCED OU'I'AGE I IOURS
DOCKET NO; 50-251 SQ&f'EY: Unit No.. 4 operated at 100% ~
" PilIT k01E TURKEY POINT UNIT NO. 4 R.P. except for scheduled maintenance shutdown August 8-9, 1975 and a load SEPTEIMER 5, 1975 reduction on August 12, 1975 PREPARED BY MARYLEE MONTGOMERY TELEPHONE 30 245-2910 Ext. 8 REPORT M3iVHH AUGUST, 1975 U N IT S H U T D 0 NN S /REDUCTI0NS
'I PE ME'IHOD OF F-FORCED DURATION SHtJITING DOWN iXO.. DATE '-SCHEDULED (HOURS) REASON " %HE REACIOR
- COUNTS 11 75-08-03 153.7 Unit No. 4 was removed from service. (controlled manual shutdown) to repair No." 4B steam generator tube leak (small leak in radio- one of 3,260 tube). There were no significant quantitiesleak. of active material released as a result of this small (Nuclear system) 12 75-08-12 N/A Load on Unit No. 4 was'utomatically reduced to approximately 70% R.P. by No. 4 reactor protection system caused by loss of power supply to control rod drive mechanism H-4. (Nuclear system)
"* REASON !
i A"EQJIPMENT FAILURE (EXPLAIN 1-14MAL B-MAINT. OR TEST ~,'-NA'UAL SCRAM C-REFUELING .! 3-AUTOMATIC SCRAM D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION i
- F"ADMINISTRATIVE G-OPERATION'2 ERROR H-GIBER (EXPLAIN)
4