MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
HObTIILY REPORTS (FOR GRAY BOOI'REPARATION)
NBC BIBUTION FOR PART 50 DOCKE'TERIAL (TEMPORARY FORM)
CONTROL NO:
FILE 'IIOIITHLY'REPORT FIL" FROM. Florida Power & Light Co. DATE OF DOC DATE REC'D LTR TWX RPT OTHER Miami, Fla TO:
CLASS Office of Management UNCLASS Info PROPINFO ORIG
~l-signed INPUT CC 1'ENT OTHER NO CYS REC'D AEC PDR SENT LOCAL PDR DOCKET xxxxxx xxxx xxxxx an 251 NQ'0-250 DESCR IPTION: ENCLOSURES:
Ltr trans the following: Monthly Repor t for A ri 1 1975 Plant: & COHlpolient Operability & Availability
.This Report to be used in preparing Gray Book by Plans & Operations.
NJHBER OF CO/IES REC'D:
PLANT NAME:',Turkey Point 83 and 4 FOR ACTION/INFORMATION JGB BUTLER (L) SCHWENCER (L) Zl EMANN (L) REGAN (E)
W/ Copies W/ Copies W/ Copies W Copies CLARK (L) STOLZ (L) DICKER (E) AR (L)
W/ Copies W/ Copies W/ Copies W/ )Copies gy
~
a I
'll/i>P
~ aw4 ~
0 I I A I
~ a
~ va<<ri 1>ol Mi
~
swed i sr>
~ ~ Mtt ) ~
no~
Vs e
~ ~~y~
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E)
W/ Copies W/ Copies W/ Copies W//Copies INTERNAL DISTRIBUTION B GFI TECH BFVIEW DENTON LIC ASST A/T IND .
SCHROEDEB GRIMES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A MACCARY. GAMMILL H. G EAB IN (L) SALTZMAN GOSSI CK/STAF F KNIGHT KASTNER E. GQULBOURNE (L) ME LTZ CASE PAWLICKI BALLARD P. KREUTZER (E)
G I AMBUSSO SHAO SPANGLER ~
J. LEE (L), PI.ANS BOYD MOORE (L)
DEYOUNG (L)
STLLLO HOUSTON NOVAI<
ENVIBO MULLER M. MAIGRET (L)
BEFD(E} '
SERVICE (L)
~MCDONALD CHAPMiAN DUBE (Ltr)
SKOVHOLT (L) ROSS DICKER S. Sl IFPPARD (L) E. COUPE GOLLF.R (L} (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS TEDESCO YOUNGBLOOD H. SMITH (L) HAR C FIELD (2}
DENISE LONG BEGAN S. TEETS (L) KLECKER BFG OPR LAINAS PROJECT LDR G. WILLIAMS(E) E ISENHUT FILE 8: REGION (2) BENAROYA V ILSON (L) WIGGINTON T.B. WILSON VOLLMER HAR LESS . INGRAM (L)
STEFLE EXTERNAL DISTRIBUTION 1 'I QCAL PDB Homestead, Fla
'~1 1 IC (ABER NATHY) (1)(2)(10) NATIONALLABS 1 P D B-SAN/LA/NY 1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm F-201 GT 1 BBQQKHAVEN NA C LAB 1 ASLB 1 CONSULTANTS 1 G. ULB II<SON, QBi~! L 1 Nnvton Andersoii NEWMiAB I</8 LUME/AGBA BI AN 1 AGMED (RUTH GUSSfvlAN)
ACBS HOLDING/SENT Rm 8-127 GT 1 J. D. RUNKLES, Bm E-201 GT
. be 3100 MIAMI, FLORIDA 3310)
LZ FLORIDA POWER 8( LIGHT COMPANY May 5, 1975 0 ffice o f Management Controls Xn formation and Program U. S. Nuclear Regulatory Commission Nashington, D. C. 20555 Gentlemen:
Attached are the April, l975 Operating Status Reports for Turkey Point Unit Nos. 3 and 4; Very truly yours, J8A--
Vice President Power Resources VTC/mjs Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esquire
tnwte<> rLVwaun vs <Vs
,:~ 3f;: '" IPl ql
- ~'- ~-~L~
FLORIDA POiVGR 5 LIGHT COMPANY May 5, 1975 I
F'ffice of Management Information and Program Controls U. S. Nuclear Regulatory Commission washington,. D. C. 20555 ~ '\ ~
Gentlemen:
Attached are the April, 1975 Operating Status Reports for Turkey Point Unit Nos. 3 and 4.
Very truly yours, / ~ ~
Jg. D. S chmidt Vice President ~ N Power Resources '
VTC/mjs
~ t Attachments t cc: Mr. Norman C. Moseley Jack R. Newman, Esquire .R.
S P
" -l'"" ".'Hat.PING .8LIILO FLORIOA
l 4r g-.1,'e>
I'
~ ~
ENCLOSURE A DOCKET NO. 50-250 UN1T NAML'URKEY POINT UNIT NO. 3 May 5, 1975 COihlPLETED BY V- T. CHILSON TELEPl JO'K NO 445-6211 EXT. 2177 DAILY MiIT POtVER OUTPUT
~jr' APRIL, '1975 DAY. ~
A%%IQGR DAILY.l~SVe-net DAY AVEBA% DAILY MVe-net
'641 .. 671 20.
- 2. ~
676 21 660 676 22 652 4 683 23. '. 554 684 24
. 6 690 25 569 7 681 0 26 678 683 27
~
673 681 28 671 10 , 680 29
-"- 671 637 30 668
'1 12 '473 13 671 1a 676 645 NOTE: Daily average power level greater than 666 l1Ãe, due 557 to cooler condenser cool'-
water.
17 669 18 672 19 672
,0 I
)Q g p
-~4. 4 fg 8 - K
"~
N0.50-250 DOCKET IJ)flT hAhfE 'EY POINT UNIT NO. 3 T MONTH APRIL 1975 MAY 5g 1975 Cuff)LLTED BY V. T. CHILSON TELEI'JJONE )309 445 - 6211 - Ext.
OPERATING STATUS
- 1. REPORTING. PERIOD: 0001, 75, 04, 01 THROUGH 2400, 75, 04, 30 GROSS fKXJRS Ifif REPOKf'fii(i PERIOD: 720: 00
- 2. CURRENTLY AffffJORIZED PCi'ER LEVEL PiNt) 2200 hfAX. DEPEND. CAPACITY (iWfc JfET)
- 3. PO)fER LEVEL TO bHICH RESTRICTED {IF ANY): (MYc NET) None
- 4. REASONS FOR RESTRICI'IONS (IF ANY):
'IHIS CRJULATIVE hfiVIH YR-'lQ-DATE TO DATE
- 5. MMER OF fKXJRS %K REACIQR 1NS CRITICAL 720.0 2 751.4 16 779.1
'01.2
~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
- 6. REACIQR RESERVE SHUTDOflN HOURS ........ )DiL) G)))HLA)0R gq L))P 2 7)7,8 16 136.1 8.~ UNIT RESERVE SflffIDO)Ãi HOURS ........... 85.0
- 9. GROSS 'IHERhfAL ELVRGY GBJERATED(MGQ.... 1 457 721 5 698 194 28 378 218
- 10. GROSS ELECIRICAL PORGY GENERATED 447 437 1 838 226 9 266 031 (h nllH) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t ~ ~ ~ ~
Ef,FPPPI(PL ~)):RGv ~rnPTE)J {LILT@ 453 965 1 777 175 8 758 340
- 12. REACIQR AVAILABILITYFACIQR +1......... -
100. 0 95. 6 79. 6
- 13. UNIT AVAIIABILITYFACIQR g2............ 97.4 94.4 76. 6
- 14. UNIT CAPACITY FACIQR J3................ 94.7 92.7 63.8
- 15. UNIT FORCED OfffAGE RATE J4..........:..
- 16. SHfflIXXfNS SCHEDULED OVER NEXT 6 hfOVIHS (TYPE, DATE AND DURATION OF EACH):
June 21 - 26, 1975 -'eismic Restraint Inspecf:ion Oct. 20 - Nov. 30, 1975 - Refueling, Maintenance, and Inspections.
- 17. IF SKfflJ OfiJN AT DJD OF REPORT PERIOD, ESTihfATED DATE OF STARIUP:
fKXJRS REACIQR YAS CRITIC X 100 REACIQR AVAILABILITYFACIE 'I i Rl'i' J2 UNIT AVAILABILITYFACIQR ~
f~
GR WXXMTOR ON LI~~Z X 100 HOU N fEfiO T ERIOD g3 UN IT CAPACITY FACIQR ))
~ ELE~aI~
)~. ))L'I+i L)LUILB M~~T'R GEE &TED X 10 0 Ai. 1 )L HOURS IN REPORT PERIOD FORCED Offl'A(7). JIOURS X 100
~4 UNIT OUTAGE RATE 1M'LXEfnf R 0 FORCED OLffAGE f KXJRS
T
~ s
DOCKET NO. 50-250
'pi~> Y.-Unit No. 3 operation was UVIT NAhin TURKEY POINT UNIT NO. 3 satisfactory for month except for steam generator DATE hIAV 5, 1975 feedwater control valve '
problem on April 23, 1975. PREPARED BY V. T. CHILSON and condenser tube EAT.
April 24-25, 1975. TELEPIKtlIE repair'n REPORT. hQVIH APRIL, 1975 UNIT SHUTDOUNS/REDUCTIONS M:"IHOD OF F-KRCED DURATION SHUITING DOl~N S-SCHEDtILED rIOURS REASON " TiiE REACIQR CG)f K%IS 12 75 04 11 .<<0 N/A Lead on the unit was reduced to perform perodic test on turbine main steam stop and control valves, reheat intercept, and reheat stop valves. (Non-nuclear System) ll 13 75 04 15 S B N/A Load on the unit was reduced to clean steam generator feedwater pump Nos. 3A and 3B suction strainers. (Non-nuclear System) 14 75 04 23 18.8 N/A Uniit was .removed from service to repair steam generator feedwater control valve Nos. 3A, 3B, and 3C valve operator (Non-nuclear Sy stem) 15 75 04 24 <<p<< B N/A Load on the unit was maintained below approximately 50% R.P. to epair condenser tube leak. (Non-nuclear System)
A-EQUIPiiNI'AILURE (EXPLADI) 1-hBiXUAL
'B-h(AIiVI'. OR TEST 2-i.<VJAL SCRuI C-REFUELING 5 AUIChjQIC SCRuI D-REGULATORY RESIRICI'ION E-OPERATOR TiAINING AM)
LICENSE EMIINATIOV F-AD~IINISIRATIVE G-OPERATION'. ERROR H-OIHER (EXPLAIN)
4
~ ~
~l
".'ENCI.OSUI(E A v v
- --..-"--.'-.-.;,~.
- . -::,- .-DOCKI!T NO. 50-251 UNIT N1@JE TURKEY POXNT ONXT NO. 4 II DATE MAY 5, 1975 (D~IPLE1TD BY V. T. CHXLSON 445 6211 E
TELEPIIONE NO. 305 DAILY WiIT POLI'ER OUTPUT
>G+PI APRXL, 1975
\ ~ ~
AVEIN(T: DAIJ.Y hS('e-net DAY AVEBA(Z DAILY Nl'e-net 20.
. 21 3 22 4 23r
~
24 6
25'6.
27
=9 28
-10 -29 .
30 P
I ~ ~ ~
12 31 17 18
DOCRET NO. 50-251
,IIIIJIT NA~JE TURKEY POINT UNIT NO. 4
~ ~
~
~
~
XLATE 5, 1975
-(OhJPLLBTED BY V. T. CHILSON TELEPJJONE 305 445- 681 Ext.
OPERATING STATUS
--1 REPORTING PERIOD ~ 0001 75 04 01 'QJROUGJ J 2400 ~ 75 3 04, 30 GROSS HOURS IN REPOR1IIQ PERIOD: 720.0
- 2. CUISEN1'LY AtJH JOIE ZED FOIE LEVEL (M<t) 2200 hJAX. DEPE'Q. CAPACITY (hflfc hET)
- 3. POllKR LEVEL TO WHICH RESTRICIED (IF ANY): (hfii'c NET)
'. REARNS FOR RESIRICTIMS (IF ANY):
'IIHS QMIATIVE hDVH YR-TO-DATE 'JQ DATE
- 5. NESER OF HOURS %K REACIQR 1QS CRITICAL . '
035. 7 11 369.5
- 6. REACIQR RESERVE SHlJIIXXQ HOURS ........ ~
97.3 97. 3.
70 BOIIRS GBIERATOR CT LILB ...............
0- 3 033. 3 11 071. 1 UNIT RESERVE SEIIUOIIN RRIRS ...........
- 9. CROSS 77IEISSIL F'IERCY GBIERRTEUOSGI)...'. ~ 4 305 374 22 657 584
~4
- 10. GROSS ELECTRICAL ENERGY GEJZRATED 7 169 639 (NS). ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
h~ B:TT:CTRI4~ ax@~ ~RwqA~rJ (Rg)H)
-1 230 1 325 639 6 794 755
- 12. REACIQR AVA>LABILITYFACIQR Ql ......... 70.7 78. 8 J2............ 69.9 76.8
- 13. UNIT AVAIIABILITYFACTOR
~............... 69.1 72. 3
- 14. '.UNIT CAPACITY FACIQR J3 4.8
- 15. UNIT FORCED OUTAGE RATE J4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
- 16. SJJUTDOi'I'NS SCHEDULED OVER NEXT 6 hJONIHS (TYPE, DATE AhJD DURATION OF EACJJ):
Mar; 30 - June 1, 1975 - Refueling, Maintenance, anci Inspections.
Oct. 13 Oct. 18, 1975 - Seismic Restraint Inspection.
17 ~ IF SJIJE011N AT M) OF REPORT PERIOD, ESTlhJATED DATE OF STARTUP:
June', 1975 HOURS RFACIQR ieS CRITIC% X 100 REACIQR AVAILABILITYFACIQR R'~~)~~ggg
'OURS GBiTRATOR ON LIKE X 100 J2 UNIT AVAILABILITYFACIQR G J OJ RE'T~~g~r UNIT CAPACITY FACIQR NH ELECTRICAL POt>ER GENERATE) X 100 IKXJRS IN REPORT PERIOD FORCED OtJJ'A(II JiOURS X 100 0
FORCED OUPAGE JKXJRS
V'OCKET SQivARY: UNIT NO. 4 WAS OUT OF SERVICE ENTIRE MiOiNTH FOR REFUELING, MAINTENANCE, AND INSPECTIONS NO.
PREPAREl) BY TELEPHONE 50-251 TURKEY POINT UNIT NO. 4 MAY V. T. CHILSON 3 5 5, 1975 445 621 Ext.
2177 REPORT hOVnr APRIL. >>75 UNIT SHUTDOifNS/REDUCTIONS b FLHOD OF F-FORCED DURATION SHUTTING DOiIN NO. S-SCHEDULED URS REASON " 'GB REACIOR "* COME 05 5 03 29 720 ~ 0 C Unit No. 4 was removed from service {deliberate manual shutdown) for refueling, maintenance, and inspectiqns. {Nuclear and Non-nuclear Systems)
I ~i I
~
I I- I' ~ s v ~
REASON hKIIiOD:
'-EQJI Fi ILVI'AILURE (EXPLAIN/ 1-i%%AL
~
B-h!AIIVI'. OR lEST 2-hi%MAL SCRA~1 C-REFUL'LING D-REGULATORY RESTRICTION E-OPERATOR TRAINING M)
EX&/INATION 'ICENSE F-AININISTRATIVE G-OPERATIONAL ERROR H-OIHER (BPLABQ