MONTHYEARML21287A4512021-10-15015 October 2021 Email for NuScale Topical Report Quality Assurance Program Description Topical Report -A Version Verification ML21154A1322021-05-26026 May 2021 Final Safety Evaluation Transmittal Email ML21053A2662021-02-22022 February 2021 SMR DC Docs - FW: NuScale EPZ Review Path Forward ML20203M1872020-07-14014 July 2020 Control Room Staffing Topical Report - NRC Staff'S Documentation of the Results of the Completeness Review ML20190A2352020-07-0808 July 2020 SMR DC Docs - Approved Version of NuScale Topical Report, Rod Ejection Accident Methodology, TR-0716-50350, Revision 1 ML20141L6102020-05-20020 May 2020 SMR DC Docs - NuScale Topical Report - Approved Version of NuScale Applicability of Areva Method for the Evaluation of Fuel Assembly Structural Response to Externally Applied Forces, TR-07116-50351, Revision 1 ML20090A8642020-03-30030 March 2020 SMR DC Docs - NuScale Topical Report - Approved Version of TR-0516-49417, Evaluation Methodology for the Stability of the NuScale Power Module, Revision 1 ML19331A7302019-11-27027 November 2019 SMR DC Docs - FW: Ibr Flow Chart ML19331A7382019-11-27027 November 2019 SMR DC Docs - FW: Chapter 18 (Di IP) Related (non-prop) ML19331A7262019-11-26026 November 2019 SMR DC Docs - (External_Sender) Ibr Flow Chart ML19329E7132019-11-25025 November 2019 SMR DC Docs - FW: Chapter 18 (Di IP) Related ML19323F6982019-11-19019 November 2019 DCA Technical Specification Confirmatory Items - Email Commitments ML19329E7022019-11-0606 November 2019 SMR DC Docs - (External_Sender) Chapter 18 (Di IP) Related ML19309D7862019-10-31031 October 2019 Reconciliation - NRR Response to Acrs' September 20 2019 Letter on NuScale Stability Analysis Topical Report ML19309E0172019-10-31031 October 2019 Reconciliation - NRR Response to Acrs'S September 24 2019 Letter on NuScale External Forces Topical Report ML19309F8612019-10-31031 October 2019 Reconciliation - NRR Response to Acrs'S September 25, 2019 Letter on the Focus Area Review Approach ML19276D2812019-10-0303 October 2019 SMR DC RAI - Request for Additional Information No. 526 Erai No. 9719 ML19235A1092019-08-23023 August 2019 SMR DC RAI - Request for Additional Information No. 525 Erai No. 9705 (19.02) ML19206B0772019-07-25025 July 2019 SMR DC Docs - FW: FW: NuScale Chapter 5 Section 5.2.3 - Changes to Information on Check Valves ML19171A0092019-06-20020 June 2019 SMR DC RAI - Request for Additional Information No. 524 Erai No. 9691 (3.9.4) ML19157A0352019-06-0606 June 2019 SMR DC RAI - Request for Additional Information No. 523 Erai No. 9682 (12.3-12.4, 9.3.2) ML19150A3172019-05-30030 May 2019 SMR DC RAI - Request for Additional Information No. 522 Erai No. 9681 (14) ML19151A0272019-05-30030 May 2019 SMR DC RAI - Request for Additional Information No. 522 Erai No. 9681 (14) ML19099A1272019-04-0909 April 2019 SMR DC Docs - FW: NuScale Comments Chapter 5 SER W/Ois ML19098A2362019-04-0808 April 2019 SMR DC Docs - FW: NuScale Comments Chapter 5 SER W/Ois ML19089A0112019-03-29029 March 2019 SMR DC Docs - NuScale Topical Report - Approved Version of Subchannel Analysis Methodology, TR-0915-17564, Revision 2 ML19081A2722019-03-22022 March 2019 SMR DC RAI - Request for Additional Information No. 521 Erai No. 9672 (19) ML19079A3632019-03-20020 March 2019 SMR DC RAI - Request for Additional Information No. 520 Erai No. 9642 (16) ML19077A2852019-03-18018 March 2019 SMR DC RAI - Request for Additional Information No. 519 Erai No. 9656 (12.03) ML19063D4042019-03-0404 March 2019 SMR DC RAI - Request for Additional Information No. 518 Erai No. 9659 (19) ML19062A0012019-03-0303 March 2019 SMR DC RAI - Request for Additional Information No. 518 Erai No. 9659 (19) ML19057A4382019-02-26026 February 2019 SMR DC Docs - March 5, 2019, Public/Closed Meeting on NuScale EPZ Sizing Methodology Topical Report_Nrc Staff Talking Points (Public) ML19056A5062019-02-25025 February 2019 SMR DC RAI - FW: Request for Additional Information No. 365 RAI No. 9309 (3.8.4) Rev 1 (to Remove Prop from Previous Subject Line) ML19046A0672019-02-15015 February 2019 SMR DC RAI - Request for Additional Information No. 517 Erai No. 9657 (12.03) ML19032A1202019-02-0101 February 2019 SMR DC RAI - Request for Additional Information No. 516 Erai No. 9647 (15.0.6) ML19016A2692019-01-16016 January 2019 SMR DC RAI - Request for Additional Information No. 515 Erai No. 9607 (12.02) Revision 1 ML19015A2782019-01-15015 January 2019 SMR DC RAI - Request for Additional Information No. 366 RAI No. 9292 (12.3) ML19015A2742019-01-15015 January 2019 SMR DC RAI - Request for Additional Information No. 486 Erai No. 9296 (12.3) ML19014A0882019-01-14014 January 2019 SMR DC RAI - Request for Additional Information No. 515 Erai No. 9607 (12.02) ML19014A0842019-01-14014 January 2019 SMR DC RAI - FW: Request for Additional Information No. 371 RAI No. 9373 (15.06.06) ML19003A1772019-01-0303 January 2019 SMR DC Docs - Approved Version of NuScale Topical Report TR-0616-48793, Nuclear Analysis Codes and Methods Qualification, Revision 1 ML19003A4612019-01-0303 January 2019 SMR DC Docs - Approved Version of Topical Report TR-0116-21012, NuScale Power Critical Heat Flux Corrections, Revision 1 ML18352B0812018-12-18018 December 2018 SMR DC RAI - Request for Additional Information No. 513 Erai No. 9643 (4.04) ML18352B0852018-12-18018 December 2018 SMR DC RAI - Request for Additional Information No. 514 Erai No. 9645 (4.04) ML18341A3452018-12-0707 December 2018 SMR DC RAI - NuScale Request for Additional Information -eRAI No. 9631, Section 6.2.6 - Cancelled ML18333A0212018-11-29029 November 2018 SMR DC RAI - Request for Additional Information No. 512 Erai No. 9634 (16) ML18324A8142018-11-20020 November 2018 SMR DC RAI - Request for Additional Information No. 511 Erai No. 9613 (12.02) ML18312A2492018-11-0808 November 2018 SMR DC Docs - FW: NuScale FSAR Draft Changes in Section 2.4.4 ML18309A2642018-11-0505 November 2018 SMR DC RAI - Request for Additional Information No. 510 Erai No. 9631 (6.2.6) ML18296A2342018-10-23023 October 2018 SMR DC RAI - Request for Additional Information No. 509 Erai No. 9608 (14.3.8) 2021-05-26
[Table view] |
Text
NuScaleDCRaisPEm Resource From: Cranston, Gregory Sent: Tuesday, August 14, 2018 12:23 PM To: Request for Additional Information Cc: Lee, Samuel; Karas, Rebecca; Travis, Boyce; Bavol, Bruce; Chowdhury, Prosanta; NuScaleDCRaisPEm Resource
Subject:
Request for Additional Information No. 497 eRAI No. 9570 (5.4.3)R1 - RESENT TO CORRECT RAI No. IN HEADING OF RAI.
Attachments: Request for Additional Information No. 497 (eRAI No. 9570).pdf Attached please find NRC staffs request for additional information (RAI) concerning review of the NuScale Design Certification Application.
Please submit your technically correct and complete response within 60 days of the date of this RAI to the NRC Document Control Desk.
If you have any questions, please contact me.
Thank you.
1
Hearing Identifier: NuScale_SMR_DC_RAI_Public Email Number: 534 Mail Envelope Properties (BN1PR09MB02589BC4D62903B0C7830EE190380)
Subject:
Request for Additional Information No. 497 eRAI No. 9570 (5.4.3)R1 - RESENT TO CORRECT RAI No. IN HEADING OF RAI.
Sent Date: 8/14/2018 12:22:37 PM Received Date: 8/14/2018 12:22:45 PM From: Cranston, Gregory Created By: Gregory.Cranston@nrc.gov Recipients:
"Lee, Samuel" <Samuel.Lee@nrc.gov>
Tracking Status: None "Karas, Rebecca" <Rebecca.Karas@nrc.gov>
Tracking Status: None "Travis, Boyce" <Boyce.Travis@nrc.gov>
Tracking Status: None "Bavol, Bruce" <Bruce.Bavol@nrc.gov>
Tracking Status: None "Chowdhury, Prosanta" <Prosanta.Chowdhury@nrc.gov>
Tracking Status: None "NuScaleDCRaisPEm Resource" <NuScaleDCRaisPEm.Resource@nrc.gov>
Tracking Status: None "Request for Additional Information" <RAI@nuscalepower.com>
Tracking Status: None Post Office: BN1PR09MB0258.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 364 8/14/2018 12:22:45 PM Request for Additional Information No. 497 (eRAI No. 9570).pdf 60452 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Request for Additional Information No. 497 (eRAI No. 950)
Issue Date: 08/13/2018 Application
Title:
NuScale Standard Design Certification 048 Operating Company: NuScale Power, LLC Docket No.52-048 Review Section: 05.04.07 - Residual Heat Removal (RHR) System Application Section: 5.4.3 QUESTIONS 05.04.07-7 10 CFR Part 50, Appendix A, GDC 34 requires in part that a system to remove residual heat shall be provided, the safety function of which shall be to transfer fission product decay heat and other residual heat from the reactor core at a rate such that design limits and conditions are not exceeded. NuScale has adopted a PDC that uses identical language to the GDC with the exception of the power provisions, which are not pertinent to this question. In order to satisfy GDC 34, NuScale states the DHRS design ensures the RCS average temperature is below 420 degrees F within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> after an initiating event without challenging the RCPB or uncovering the core. While the analytical performance of the system is documented in the FSAR, the staff requires additional information to confirm that the decay heat removal function of the as-built system as a whole will perform in accordance with the analytical assumptions.
As part of the response to RAI 8817, Question 14.3-1, NuScale provided no information related to testing of the DHRS as part of ITAAC 02.08.08 that would demonstrate how the as-built DHRS thermal performance will exceed its design assumptions. While staff recognizes prototype and legacy testing play a large part in showing adequate system performance from a design perspective, staff believes it to be important to demonstrate adequate performance of the as-built system before it is called on to perform its safety function given the relative importance of the system.
As such, staff requests that NuScale include a test or a commitment to perform a test (either supplementing an existing test or a new one) that involves operating the DHRS valves with a heated system (not necessarily full temperature and pressure) such that natural circulation flow removes heat from the loop and the thermal performance of the system can be measured. The test, if not run at design basis conditions, should then be compared against a limiting analysis using the tool of record (NRELAP) for the test conditions to show that the as-built performance meets or exceeds analytical assumptions. This approach corresponds to that used for previous novel decay heat removal systems.