MONTHYEARML24297A0112024-10-23023 October 2024 Meeting on Section 205 of the Advance Act: Fusion Energy Regulation ML24226A4582024-08-29029 August 2024 Financial Assurance Requirements for Disposition of Category 1-3 Byproduct Material Radioactive Sealed Sources Handout August 29 2024 Meeting ML24229A0942024-08-19019 August 2024 8-19-24 Meeting with NEI on Pirts - NRC Slides Final ML24207A0262024-08-13013 August 2024 Publicmeeting_Presentation for August_14_2024--FusionMachines_ProposedRule ML24192A1272024-07-10010 July 2024 Scale and Melcor non-LWR Fuel Cycle Demonstration Project - MSR ML24164A2372024-06-17017 June 2024 ACMUI Extravasations Handout June 17 2024 Meeting ML24149A1882024-06-0505 June 2024 ACMUI June 5 2024 Meeting Handout ML24075A1722024-02-22022 February 2024 Attachment 1 - NMMSS Trtr Presentation ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23355A1432024-01-17017 January 2024 January 17, 2024 Public Meeting Handout - Fusion Systems Rulemaking ML23258A1802023-11-0909 November 2023 November 9, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23296A1992023-11-0808 November 2023 Cumulative Effects of Regulation Public Meeting (11/08/2023): Renewing Nuclear Power Plant Operating Licenses – Environmental Review (Rin 3150-AK32; NRC-2018-0296) ML23258A1712023-11-0101 November 2023 November 1, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule NUREG-1556, November 1, 2023 Public Meeting Handout Preliminary Draft Guidance (NUREG-1556, Volume 22) Fusion Systems Proposed Rule2023-10-31031 October 2023 November 1, 2023 Public Meeting Handout Preliminary Draft Guidance (NUREG-1556, Volume 22) Fusion Systems Proposed Rule ML23240A7182023-08-29029 August 2023 Slides - Public Meeting on Regulatory Basis for Rb-82 Generators, Emerging Medical Technologies, and Other Medical Use of Byproduct Material ML23191A1532023-07-12012 July 2023 – Public Meeting Presentation -- Proposed Rule: Regulatory Framework for Fusion Energy Systems ML23123A3292023-06-0606 June 2023 SGI Training ML13108A326 ML23123A3322023-06-0606 June 2023 SGI Pamphlet ML23062A7352023-04-14014 April 2023 Tanana Chiefs Conference 2023 Annual Convention NRC Presentation ML23137A0442023-04-11011 April 2023 April 11, 2023, Presentation to NOAA Narw Northeast U.S. Implementation Team - North Atlantic Right Whale and NRC Endangered Species Act Consultations ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML23019A0122023-01-19019 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Awareness Training for NRC & Agreement State Inspectors ML23012A2302023-01-12012 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Public Presentation - Decommissioning Fuel Cycle, Uranium Recovery & Materials Inspection Program ML23006A0232022-12-15015 December 2022 NEIs Presentation for the December 15, 2022 Spent Fuel Priorities Meeting with NEI ML22334A1022022-12-0505 December 2022 Advisory Committee on the Medical Uses of Isotopes (ACMUI) Fall 2022 Meeting Handout ML22334A2692022-11-30030 November 2022 Advisory Committee on the Medical Uses of Isotope (ACMUI) Fall 2022 Meeting Handout (Revised) ML22326A2222022-11-23023 November 2022 Future of the National Materials Program Working Group Public Meeting: Presentation ML22311A5532022-11-16016 November 2022 Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor ML22308A0502022-11-0303 November 2022 Presentation 2 Chapman NRC Background Slides Nov 3 2022 Discrete Radioactive Particle (DRP) Workshop ML22308A0512022-11-0303 November 2022 Presentation 3b Parks DRP Exposure Scenarios November 3, 2022 DRP Workshop Presentation ML22301A1612022-10-28028 October 2022 Discussion Questions for DRP Workshop ML22286A0712022-10-25025 October 2022 Harmonization of Transportation Safety Requirements with International Atomic Energy Agency Standards (Rin 3150-AJ85; NRC-2016-0179); Public Meeting Presentation ML22272A0402022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1D Part 53 Framework B Through Part 171 Rule Language ML22272A0362022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1A Preamble (E.G. Statements of Consideration) ML22272A0382022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1B Section-by-Section, Backfit and Issue Finality, and Availability of Guidance Documents ML22272A0392022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1C Part 2 Through Part 53 Framework a Rule Language ML22272A0422022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DG-1413 Technology-Inclusive Identification of Licensing Events for Commercial Nuclear Plants ML22272A0452022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DG-1414 Alternative Evaluation for Risk Insights (Aeri) Methodology ML22272A0472022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DRO-ISG-2023-01 Operator Licensing Programs ML22272A0492022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DRO-ISG-2023-02 Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR Part 50.54 ML22272A0512022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53- DRO-ISG-2023-03 Development of Scalable Human Factors Engineering Review Plans ML22238A2542022-08-31031 August 2022 Slides - Reporting Events and Event Trending, 2022 Annual OAS Meeting ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22112A1042022-04-0505 April 2022 NRC Staff Medical Event Slide, April 5, 2022, FY21 ML22094A1022022-04-0505 April 2022 Advisory Committee on the Medical Uses of Isotopes (ACMUI) Spring Meeting 2022 Revised Handout ML22089A1892022-04-0505 April 2022 Advisory Committee on the Medical Uses of Isotopes (ACMUI) Spring Meeting 2022 Handout ML22137A3232022-04-0505 April 2022 NRC 2022 and ACMUI 2021 Medical Event Summary Presentations ML22097A1412022-03-24024 March 2022 Part 53 Rulemaking - Advanced Reactor Applications Presentation on March 24, 2022 ML22097A1312022-03-23023 March 2022 Decommissioning Rulemaking Presentation on March 23, 2022 2024-08-29
[Table view]Some use of "" in your query was not closed by a matching "". Category:Slides and Viewgraphs
MONTHYEARML24297A0112024-10-23023 October 2024 Meeting on Section 205 of the Advance Act: Fusion Energy Regulation ML24226A4582024-08-29029 August 2024 Financial Assurance Requirements for Disposition of Category 1-3 Byproduct Material Radioactive Sealed Sources Handout August 29 2024 Meeting ML24229A0942024-08-19019 August 2024 8-19-24 Meeting with NEI on Pirts - NRC Slides Final ML24207A0262024-08-13013 August 2024 Publicmeeting_Presentation for August_14_2024--FusionMachines_ProposedRule ML24192A1272024-07-10010 July 2024 Scale and Melcor non-LWR Fuel Cycle Demonstration Project - MSR ML24149A1882024-06-0505 June 2024 ACMUI June 5 2024 Meeting Handout ML24086A5442024-03-14014 March 2024 RIC 2024 TH24 Intro/Closing Slides on Navigating the Future of Fusion ML24040A1722024-03-12012 March 2024 RIC 2024 T4 Slides - Jlubinski Chair Intro Remarks ML24075A1722024-02-22022 February 2024 Attachment 1 - NMMSS Trtr Presentation ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23355A1442024-01-17017 January 2024 January 17, 2024 Public Meeting Presentations - Fusion Systems Rulemaking ML23258A1802023-11-0909 November 2023 November 9, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23296A1992023-11-0808 November 2023 Cumulative Effects of Regulation Public Meeting (11/08/2023): Renewing Nuclear Power Plant Operating Licenses – Environmental Review (Rin 3150-AK32; NRC-2018-0296) ML23258A1712023-11-0101 November 2023 November 1, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23258A1472023-10-11011 October 2023 October 11, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23241A9492023-09-0606 September 2023 09-06-2023 Rulemaking: Proposed Rule: Public Meeting Slides - ASME 2021-2022 Code Editions Proposed Rule ML23240A7182023-08-29029 August 2023 Slides - Public Meeting on Regulatory Basis for Rb-82 Generators, Emerging Medical Technologies, and Other Medical Use of Byproduct Material ML23191A1532023-07-12012 July 2023 – Public Meeting Presentation -- Proposed Rule: Regulatory Framework for Fusion Energy Systems ML23200A3452023-06-20020 June 2023 National Organization of Test, Research, and Training Reactors 2023 Annual Conference Presentation by Jack Parrott on Decommissioning ML23186A0212023-06-0808 June 2023 Spent Nuclear Fuel Shipments in the Us: Addressing the Myths ML23123A3292023-06-0606 June 2023 SGI Training ML13108A326 ML23123A3322023-06-0606 June 2023 SGI Pamphlet ML23130A0332023-05-11011 May 2023 NRC Presentation Browns Ferry Subsequent License Renewal Pre-application Meeting, Environmental Overview ML23062A7352023-04-14014 April 2023 Tanana Chiefs Conference 2023 Annual Convention NRC Presentation ML23102A0522023-04-12012 April 2023 Meeting Slide: Information Meeting with Federally-Recognize Tribes Regarding the Proposed Rule Renewing Nuclear Power Plant Operating Licenses – Environmental Review ML23137A0442023-04-11011 April 2023 April 11, 2023, Presentation to NOAA Narw Northeast U.S. Implementation Team - North Atlantic Right Whale and NRC Endangered Species Act Consultations ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML23069A0132023-03-10010 March 2023 Pubic Meeting Slides - Proposed Rule: Renewing Nuclear Power Plant Operating Licenses - Environmental Review (Rin 3150-AK32; NRC-2018-0296) ML23019A0122023-01-19019 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Awareness Training for NRC & Agreement State Inspectors ML23012A2302023-01-12012 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Public Presentation - Decommissioning Fuel Cycle, Uranium Recovery & Materials Inspection Program ML23006A0232022-12-15015 December 2022 NEIs Presentation for the December 15, 2022 Spent Fuel Priorities Meeting with NEI ML22326A2222022-11-23023 November 2022 Future of the National Materials Program Working Group Public Meeting: Presentation ML22311A5532022-11-16016 November 2022 Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor ML22308A0512022-11-0303 November 2022 Presentation 3b Parks DRP Exposure Scenarios November 3, 2022 DRP Workshop Presentation ML22308A0502022-11-0303 November 2022 Presentation 2 Chapman NRC Background Slides Nov 3 2022 Discrete Radioactive Particle (DRP) Workshop ML22301A1612022-10-28028 October 2022 Discussion Questions for DRP Workshop ML22286A0712022-10-25025 October 2022 Harmonization of Transportation Safety Requirements with International Atomic Energy Agency Standards (Rin 3150-AJ85; NRC-2016-0179); Public Meeting Presentation ML22238A2542022-08-31031 August 2022 Slides - Reporting Events and Event Trending, 2022 Annual OAS Meeting ML22203A0192022-08-30030 August 2022 Patient Release Brochure Medical-Chinese Language ML22203A0202022-08-30030 August 2022 Patient Release Brochure Medical-French Language ML22203A0212022-08-30030 August 2022 Patient Release Brochure Medical-Spanish Language ML22221A1402022-08-10010 August 2022 Enclosure 2 - SGI Awareness Training ML22221A1412022-08-10010 August 2022 Enclosure 3 - Protection of SGI Pamphlet ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22137A3232022-04-0505 April 2022 NRC 2022 and ACMUI 2021 Medical Event Summary Presentations ML22112A1042022-04-0505 April 2022 NRC Staff Medical Event Slide, April 5, 2022, FY21 ML22088A2252022-03-30030 March 2022 Kairos Environmental Audit Closeout Meeting Presentation ML22097A1412022-03-24024 March 2022 Part 53 Rulemaking - Advanced Reactor Applications Presentation on March 24, 2022 ML22097A1312022-03-23023 March 2022 Decommissioning Rulemaking Presentation on March 23, 2022 2024-08-29
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
Material Control and Accounting Regulations Rulemaking CRGR Meeting August 16, 2018
Agenda
- Key Messages for the Final Rule.
- Background on the Rulemaking.
- Stakeholder Interactions in the Proposed and Final Rule Phases.
- Overview of the Final Rule and Guidance.
- Regulatory Analysis and Backfit Evaluation.
- Conclusion and Recommendation.
2
Schedule Update
- Initial edits and comments were resolved by staff.
- The next round of edits and comments is being prepared by OGC.
- The package is due to the Commission on September 27.
3
Key Messages for the Final Rule
- The Commission directed staff to revise and consolidate material control and accounting (MC&A) requirements for special nuclear material (SNM) in Part 74 in order to update, clarify, and strengthen the requirements.
- The principal benefits of the rule include reducing the risk of loss, theft, diversion, or misuse of SNM, and increasing regulatory efficiency and effectiveness.
- Certain provisions constitute backfitting. These provisions are necessary to ensure licensees maintain adequate protection of public health and safety and are in accord with the common defense and security. Therefore, these certain provisions are excepted from the requirement to conduct a backfit analysis. Staff has provided a documented evaluation explaining this conclusion.
4
Background:
Rulemaking, Amendments to Material Control and Accounting Regulations
- SECY-08-0059, April 25, 2008, provided the rulemaking plan that presented 6 options.
- SRM-SECY-08-0059the Commission approved the option for clarification and consolidation, and directed staff to proceed.
- SECY-11-0175 provided the proposed rule on December 15, 2011.
- COMSECY-12-0026, resulted in a revised proposed rule that was published on November 8, 2013.
- Two public meetings were held during the public comment period (120 days) that ended on March 10, 2014.
- NRC received 27 comment submissions about the proposed rule and draft guidance from licensees, industry representatives, Agreement State entities, and private citizens.
5
Stakeholder Interactions in the Final Rule Phase
- Two public meetings were held after the comment period.
- On September 25, 2014, the NRC staff discussed the public comments about the regulatory analysis.
- On March 5, 2015, the NRC staff shared preliminary information about the draft final rule text that included proposed rule text and rule text that had been modified in response to the public comments.
- Staff provided periodic updates during 2015-2018 by participating in the quarterly public meetings hosted by FCSE to discuss the status of the NRCs rulemakings and other pertinent issues that may affect the fuel cycle facilities.
- On August 28, 2018, the NRC plans to hold the public meeting about implementation of the final rule and whether there are cumulative effects of regulations (CER) for the affected facilities.
6
Overview of 10 CFR Part 74, Material Control and Accounting of Special Nuclear Material
- Specify control and accounting requirements for SNM and some source material (SM) at fixed sites and for documenting the transfer of SNM or SM.
- Requirements enable detection in a timely manner of loss, theft, diversion, or misuse of SNM.
- Subparts, organized in a graded fashion, address general requirements and specific requirements based on the category of material possessed by the facility.
- Subpart A, General Provisions.
- Subpart B, General Recordkeeping and Reporting (Part 50, 52, 70, 72).
- Subpart C, SNM of Low Strategic Significance (Part 70, Category III).
- Subpart D, SNM of Moderate Strategic Significance (Part 70, Category II).
- Subpart E, Formula Quantities of Strategic SNM (Part 70, Category I).
7
Overview of Final Rule
- Revision of MC&A regulations to consolidate, clarify, update, and strengthen them.
- Many of final rule provisions do not constitute backfitting.
- Administrative matters, information collection and reporting, clarifications, permissive relaxations or voluntary alternatives.
- Provisions that might otherwise constitute backfitting which do not affect any existing licensee (e.g., Category II requirements).
- Examples of revisions in final rule that do not constitute backfitting.
- Consolidate MC&A requirements from 10 CFR Part 72 to Part 74.
- Consolidate general performance objective (GPO) requirements within 10 CFR Part 74.
- Remove, add, revise definitions in 10 CFR 74.4.
- Plain language revisions to update, clarify, and improve understanding of the applicability of the requirements to various licensees.
8
Overview of Final Rule Backfit
- Provisions of the final rule that constitute backfitting are necessary for adequate protection and excepted from the requirement to complete a backfit analysis.
- Four new or revised provisions that constitute backfitting.
- New: provision for item control system at nuclear reactors licensed under 10 CFR Part 50 or 52 or storage installations licensed under Part 72.
- Revised: provisions regarding item control of SNM for licensees subject to Subpart C of Part 74.
- New: provision for the use of tamper-safing procedures for licensees subject to Subpart C of Part 74.
- New: provisions for the designation of material balance areas (MBAs), item control areas (ICAs), and material custodians for licensees subject to Subparts C and E of Part 74.
9
Overview of Final Draft Guidance
- A Federal Register notice solicited formal comments on the proposed draft guidance documents.
- The final draft guidance documents have been updated, to address comments and to reflect the changes in the final rule.
- Five final draft guidance documents discuss acceptable methods that licensees and applicants may use to prepare and implement their MC&A plans.
- One final draft guidance document has been expanded as guidance for licensees not required to prepare an MC&A plan.
- The final draft guidance documents clarify that using the guidance is voluntary and does not constitute a backfit.
10
Entities Affected by the Final Rule
- 8 greater than critical mass facilities licensed under 10 CFR Part 70.
- 3 Category III fuel fabrication facilities licensed under 10 CFR Part 70.
- 2 Category II facilities expected to submit applications for licensing under 10 CFR Part 70 and/or Part 50 for use of SNM for production of isotopes for medical use. There are no existing Category II facilities*.
- Category II facilities are considered in the Regulatory Analysis, but not in the Backfit Evaluation.
11
Overview of Draft Final Regulatory Analysis
- Implementation costs: Industry - Approximately
$28,000 per licensee.
- Annual operations costs: Industry - Approximately
$2,700 annual per licensee.
12
Benefits Qualitative Considerations
- Enhance security and safeguards.
- Improve licensees ability to maintain current knowledge of the SNM in their possession.
- Improve regulatory efficiency.
13
Backfit Evaluation
- Step 1: Is the proposed action of the type excluded from backfitting and issue finality provisions?
- Many provisions of the final rule are of the type that are excluded.
- Four new or revised provisions of the final rule are not of the type that are excluded.
- Step 2: Would the proposed action affect any entity that is the subject of a backfitting or issue finality provision?
- Yes, nuclear reactors licensed under 10 CFR Part 50 or 52.
- Yes, storage installations licensed under 10 CFR Part 72.
- Yes, facilities licensed under 10 CFR Part 70 and subject to Subpart H.
- Step 3: Would the proposed action constitute backfitting or involve a concern with issue finality?
- Yes, four new or revised provisions of the final rule constitute backfitting.
- Step 4: Do one or more of the Adequate Protection exceptions to preparing a backfit analysis apply?
- Yes, four new or revised provisions of the final rule constitute backfitting and are necessary to ensure that licensees maintain adequate protection of public health and safety and are in accord with the common defense and security.
- Step 5: Does the proposed action pass a backfit analysis or meet an issue finality criterion?
- N/A, provisions necessary for adequate protection are excepted from the requirements for a backfit analysis demonstrating a substantial increase in overall protection and cost justification.
- Step 6: Should the NRC take action to avoid the effect of the backfitting or issue finality provision on the proposed action by invoking an administrative exemption from the backfitting provision?
- No, on the basis of the documented evaluation, the staff finds that the final rule constitutes an acceptable instance of backfitting and violation of issue finality and recommends that the Commission issue the final rule.
14
Need for Adequate Protection
- New: item control system at nuclear reactors and storage installations.
- Existing regulations lack formal item control requirements for these types of facilities.
- Revised: item control of SNM for licensees subject to Subpart C of Part 74.
- Existing regulations include various exemptions that may allow significant quantities of SNM to be inadequately accounted for or protected.
- New: use of tamper-safing procedures for licensees subject to Subpart C of Part 74.
- Existing regulations lack formal requirements for written procedures if tamper-safing is used for MC&A purposes.
- New: designation of MBAs, ICAs, and material custodians for licensees subject to Subparts C and E of Part 74.
- Existing regulations lack formal requirements for area and custodian designations.
- Provisions are necessary extensions and clarifications of existing requirements for control and accounting of SNM at licensed facilities.
- Provisions provide reasonable assurance that the licensees would detect in a timely manner, and protect against, unauthorized removal or misuse of SNM.
15
Need for Final Rule
- Overall, the final rule is needed to provide for a comprehensive MC&A framework and continue to achieve the NRCs Strategic Goal of ensuring the secure use of radioactive materials, including SNM.
16
Conclusion and Recommendation
- The final rule strengthens the MC&A requirements and enables licensees to detect, in a timely manner, loss, theft, diversion, or misuse of SNM.
- The final rule provides reasonable assurance that the licensees maintain adequate protection of the health and safety of the public and are in accord with the common defense and security.
- Staff recommends CRGR endorsement of publishing the final rule and associated regulatory guidance documents.