ML18219D939

From kanterella
Jump to navigation Jump to search
Letter Supplement to Startup Test Report
ML18219D939
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/29/1976
From: Hunter R
American Electric Power Service Corp
To: James Keppler
NRC/IE, NRC/RGN-III
References
Download: ML18219D939 (6)


Text

NRC For +195, I2.76)

U.S. NUCLEAR AEOULATOAYC SSION J

DOCKET NUMOEA o-. s/

NRC DISTRIBUTION FoR PART 60 DOC)(ET MATERIAL FILE NUMBER Mr Keppler FROM:'merica)II Elec Pwr Service Co New York, NY R

S Hunter DATE OF DOCUMENT10-29-76 DATE RECEIVED LETTER OOAIGINAL Vcor T DE S C R IP TI0 N 0 NOTOAI LE D 94NC LASS IF I E D PROP INPUT FORM NUMBER OF COPIES RECEIVED one signed Ltr trans the following; ENCLOSU AF.

r Supplement, to Startup Test Report for DC Cook 7P1..'....(55.Cys encl re'c'd) r NOTE:

.ADDL CYS ARE BEING HELD IN DOCKET SECTION.

pO@Oi PF~iO

~g PLANT NAME:

Cook 81 p,G

~g@DG SAFETY ASSIGI1ED AD BRANCH CHIEF:

PROJECT 1)ANAGER:

LIC~ ASST.:

ASSTrN".T)

PRO E

hIAN

~

11 6 NRC PD.

INTERNAL D IST R I BUT ION SYSTEMS SAFETY HEXNEHAN SITF~

ENV RO

'I I & E OELD t

GOSSICK & STAFF MXPC HANAUER

~IAQLE$

PROJEC HANA Eh)EN',

COLLINS HOUSTON PETERSON hfELTZ IIELTI'.MES SKOV)IOLT LPDR:

SCHROEDER ENGXNEERING HACCARRY KNXG)IT SX)NEIL PAWLICKX REACTOR SAFE'IIY ROSS NOVAK ROSZTOCZY C)IECK AT&X SALTZh)AN RUTHI'.RG EXTERNAL DISTRIBUTION NAT LAB:

Rl G ~ VIE BENAROYA IPPOLITO K RKMOOD OPERAT N

REACTO S

OPERAT N EXSEN)I SIIAO BUTLER RIHES 13 ROOK)IAV~F~Q~

UI.RIKSON{ORNI.}

N F MMZSZ OLLhEI LHC))

COLLINS XZE CONTROL NUMBER Nrc:

ASI.B

'1CRS CYS ~~@-N

)> Pl)R CONSUI,TANTS Nllc FO)IM IQb {2 70)

,( ~

ll,

~

~

~

~

~

I I

I

4 V 00".~'ET PLE COn.

AMERICA@~RC'TRlC PQWER Service Corporation 2 Broad~gay, ¹to York, iV. Y l0004 (2/2) 422 -4800 ROBERT S. HUNTER Vice President-Eaekar Engineering October 29, 1

Donald C. Cook Nuclear Plant Unit No.

1 Startup Test Report Docket No. 50-315 License No.

DPR-58 Nr. J.

G. Keppler, Regional Director U.S. Nuclear Regulatory Commission Office of Xnspection and Enforcement Region XXX 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Nr. Keppler:

Xn compliance with Regulatory Guides 1.16 and 10.1, we are sending you two (2) copies of the second supplement, dated September 23, 1976, to our Startup Test Report for the Donald C. Cook Nuclear Plant Unit l.

This covers the startup testing at power levels up to and including 100% of rated thermal power.

The completed tests included in this report are:

Steam generator moisture carryover testing Loose parts monitoring Power range nuclear instrumentation noise measurements Power. coef ficient measurement 10/, step decrease from 400/o 50% ramp decrease (5%/minute) from 100%

Turbine trip from 100%

t rg V

+ IP

~" '~~"p, ~",

't li ~%

"-I~&"f~ L'~

'h I

l Mr.. Z. G. Keppler October 29, 1976 Tests yet to be completed are:

Generator trip from 100%

Full load rejection testing from 50%

6 100%

The results of these will be transmitted in a subsequent.

report.

Twenty-five (25) copies are being sent to Dr. Ernst Volgenau, Director, Office of Inspection and Enforcement.

Two (2) copies are being sent to Mr. W. G. McDonald, Director, Office of Management Information and Program Control.

Thirty (30) copies are also being sent to Mr. M. H. Fletcher, Licensing Project Manager for the Donald C.

Cook Nuclear Plant Unit No.

1, Directorate of Licensing.

I Very truly yours, R. S. Hunter Vice President-Nuclear Engineering RSH:mam CC:

Vol enau Director I.E.

25 W. G. McDonald, Director, M.I.P.C.

(2)

M. H. Fletcher (30)

G. Charnoff (1)

R.

C. Callen (1)

R. J. Vollen (1)

P.

W. Steletee (1)

R. Walsh (1)

R.

W. Zurgensen Bridgman, (1)

~ 4~

w

~f~