10/29/1976 Letter Abnormal Environmental Occurrence on Failure to Monitor the Circulating Water Total Chlorine Residual During Chlorination Cycle in Violation of Appendix B Technical Specifications Section 2.2.1.3
ML18219D921
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/29/1976
From: Jurgensen R
American Electric Power, Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To: James Keppler
NRC/IE, NRC/RGN-III
References
Download: ML18219D921 (13)


Text

A M>eataVa

$ $ f8 D III IC 8 ON'f CON DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 October 29, 1976 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road G]an Kl lyn,,JL 60137 Operating License DPR-58 Docket No. 50-315

Dear Mr. Keppler:

This is to confirm our telephone call to Mr. K.R. Baker, NRC Region III, at 1432 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.44876e-4 months <br /> on October 29, 1976. During that conversation we reported that an abnormal environmental occurrence had taken place October 29, 1976.

This occurrence was the failure to monitor the circulating water total chlorine residual during the chlorination cycle in violation of Appendix "B" Technical Specifications Section 2.2. 1.3.

The chlorination program is presently set to chlorinate automatically at 1000 and 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> each day and; due to the Chemical Technician being unaware of the time, no monitoring=was performed at the 1000 hour0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> period.

We are continuing our investigation and will submit the required report within seven days as requi red by Appendix "B" Technical Specifications Section 5.4.2.1.

Sincerely, R.W. Jurgensen Plant Manager

/bab cc: R.S. Hunter R.C. Call.en MPSC G. Olson J.E. Dolan K.R. Baker RO:III J.M. Hennigan G.E. Lien P.W. Steketee, Esq. PNSRC R. Kilburn R. Walsh, Esq. R.S. Keith R.J. Vollen BPI G. Charnoff, Esq. Dsr., IE (20 copies)

Dir., MIPC (2 copies) Directorate of Licensing gOV 1 l976

AMERICAN EILECTRlC PEWTER Service Corpor.II.ti on 2 Droa<Iu:ay, IIatsr )'orI; E. )'. I0005 (2I2) 422.iIHOO JOIIH E DOLh,V September 10, 1976 Srnior Errrurirr err I'rrsidrn t Enginrrring Cc Conssrurtion Donald C. Cook Nuclear Plant Units Nos. 1 and 2 Docket Nos. 50-315 and 50-316 DPR No. 58 and CPPR No. 61 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement III

~

Region 799 Roosevelt Road Glen Ellyn, Illinois 60136 Attention: Mr. J. G. Ke ler Re ional Director This letter provides the information required by IE Circular No. 76-02 entitled "Relay Failures Westinghouse BF (ac). and BFD (dc) Relays."

Westinghouse type BF (ac) and BFD (dc) relays are not used in safety related systems at the Donald C. Cook Nuclear Plant Units 1 and 2.

Very truly yours, John E, Dolan JED:mam cc: Dr . E. Volgenau, Director ICE, U.S.N.R.C.

G. Charnoff R. C. Callen P. W. Steketee R. Val sh D. D. Comey R. S. Hunter R. W. Jurgensen - Bridgman .

Our Nt tiou'8 200lll )'r.'ar I 976 Our CompaII Jth 70I1c )'ear C

SEP 151976

v UNITED STATES NUCLEAR REGULATORY COMMISS III 'EGION 799 ROOSCVCLT ROAD GLFN ELLYN, ILLINOIS G0137 American Electric Power Service Company Docket No. 50-3 Indiana and kfichigan Power Company Docket Ao. 50-316 ATTHi Hr. John E. Dolan, Executive Vice President, Engineering and Construction 2 Broadway New York, iiew York 10004 Gentlemen:

Ve have rescheduled the corporate level meeting at your Hew York office which was described in my letter to you dated June 4, 1976, from July 7, 1976, to July 20, 1976.

Me regret any inconvenience which may have resulted from this change.

Sincerely yours, James G. Keppler Regional Director cc: R. M. Jurgensen Plant Superintendent'cc:

PDR Local PDR NSIC TIC Ronald Callen, ifichigan Public Service Commission R. J. Vollen, Businessmen for the Public Interest Central Files IE ifail and File Unit

~pLUTIOy e

I b.

'>as-ie<~

g'1' t

AMERICAN ElTRIC POWER Service ~ rporation 2 Broadtoati, Neto York, N. Y. M004 (212) 422.4800 JOHN E. DOLAÃ Senior Esecuticc Vicc Prceident May 13, 1977 Engineering 4 Conetruction Donald C. Cook Nuclear plant Unit Nos. 1 6 2 Docket Nos. 50-315 and 50-316 DPR No. 58 and CPPR No. 61 Dr. Ernst Volgenau, Director Office of Xnspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Dr. Volgenau:

Xn your April 15, 1977 letter to me, you requested our cooperation in posting the enclosed notice to employees concerning the NRC's willingness to accept collect telephone calls from nuclear industry workers.

I am pleased to inform you that we have posted copies of your notice in conspicuous locations at the Donald C. Cook Nuclear plant. The locations selected are such that both our own operating staff and, the contractor's construction workers may observe the notice on their way to and from their work locations.

Very truly yours, r

John E. Dolan JED:mam

'I CC R. J. Vollen G. Charnoff P. W. Steketee R. Walsh R. C. Callen R. W. Jurgensen Bridgman R. S; Hunter

D I STR I BUT IV<<: ~ e OLB R/F S(II ln OLB Facility File PFCollins JBursey ocket File PDR Local PDR Docl;et llo. 50-315 raE (3)

OELD Indiana 5 f'lichigan Power Company WCRS (16)

TBAbernathy hTTji; ter. R. V. Jurgensen, JRBuchanan Plant llanager MHFletcher Donald C. Cool: fluclear Plant P. 0. Box 458 Bridgman, Michigan 49106 Gentlemen:

This is in reply to your letter dated inarch 22, 1977, and subsequent letter from llr. R. E. Armstroog, dated April 29, 1977 relative to training per-sonnel fol licensing on Do CD Cook Unit 2~ Y0Ul lettel requested Qpprovai of the training program to be utilized in training personnel licensed on Unit 1 on the differences in Unit 2.

Based on our review of the information contained in your letters, we have d termined that individuals licensed on Unit 1 who successfully complete the Differences lraining Program v,ill b>> eligible to receive licenses for Unit 2 without liRC administered e.,amination. Upon meeting the other re-quirements of Section 55.11, their licenses :>ill be amended, at the appropriate time, to include operation of Unit 2.

I hope .this information will be of use to you.

SincerelyI2 J g

~ ~ I< ~

~

Pau'i F. Collins, Chi'ef Operator Licensing Branch Division of Project flanagement OURNAMC~

CATO+

NRC lIORM 318 (9.76) NRChf 0240 6V 8 OOVLRNMVNTI'RINTINO OI'IeICL'e I 076 021 C24

M snerlcen j'L leotrlo

"" ~+DIANA 8 MICHIGAN POLgE8 CONPAIVY DONALD'. COOK NUCLEAR PLANT P,O. Box 458, Bridgman, Michigan 49106 I

Hay 4, 1977 IiI I

Hr. J. G. Yeppler, Regional'irector Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating Li cense DPR-58 Docket No. 50-315

Dear Mr. Keppler:

t<ith reference to my letter to you of April 28, 1977, in which I reported the possible loss of an unirradiated non-radioactive incore movable detector, I am pleased to report that the detector in its wooden shipping container has been located. It was in the controlled area of the auxiliary building.

To prevent recurrence of this type of incident,. our Special Nuclear Material

'-Accountability Procedure; PMP 4040 SNH.001, has.been revised to give the

  • Nuclear Materials Manager direct responsibility for preparation of the necessary shipping documents and ensuring the detector is shipped. Also, in addition to the normal shipping documents, an NRC/ERDA-741 form shall be completed by the Nuclear Materials Manager and mailed to the company receiving the detector the same day the detector leaves the plant site. By use of the 741 form for shipment, we will be informed by the receiving company when the de te ctor a rri ves. at th ei r fa ci 1 i ty.

Sine ly,

. W. Jur e se Plant Ha ger.

RW J/pk cc: R. S. Hunter G. Olson J. E. Dolan R.. G. Callen G. E. Lien G. Charnoff, Esq.

R. Ki lb urn J. H. Henni gan R. J. Vollen BPI R. S. Keith K. R. Baker RO: III PNSRC P. kl. Steketee, Esq. Dir., IE (40 copies)

R. Malsh, Esq. Dir., HIPC (4 copies)

R. 0. lthitman pic 9 1977

DISTRIBUTION:

OLB Reading File OLB Facility File PFCollins APR 3 7 1PP RJBursey; a+Docket Files PDR Docket No. 50-315 LPDR I8IE (3)

OELD ACRS (16)

Indiana 8 Hichiqan PoFIer Company TBAbernathy ATTN: fIr. R. E. Armstrong, JRBuchanan Training Coordinator Donald C. Cook Nuclear Plant P. 0. Box 458 Br idgman, Hichigan 49106 Gentlemen:

This is in reply to your letter dated April 1, 1977. Your'etter requested NRC waive the requirement for second year examinations for those individuals who received their senior operator licenses in February 19?7. Rather than administer a second examination to these men, you requested that their "final examinations" pnior to licensinq be used for determining mandatory lecture attendance pursuant to the requirements of your requalification program.'ased on our review of the information contained in your letter, we have determined that the operator requalification examination may be waived and that the "final examinations" may be used as a basis for determining mandatory lecture attendance. The individuals involved are Messrs. Boone, Freehlinq, Cooledqe, Gallagher, Hall, Runser, Skinner, Ziomerman and Schwerha.

Sincerely, ORIGINAL'IQNPot gg P. F. COLLINS paul F'. Collins, Chief Operator Licensing Branch Division of Project  !'lanagement OPPICKW PH'OLB SIIRNAMSW PFCo > ".pm 4++77 NRC FORM 318 (9-M) NRCM 0240 *V So OOVSRNMSNT PRINTINO OPPICEI ISTS S25 624

gyes;;.;,Hf)

~g !<<,,-~,~>.p,~ .VVi)QlRO q

1 t

Indiana 8 tlichigan Power Company ATTt(: Hr. R. ll. Jurgensen, Plant tlanager Donald C. Cook tfuclear Plant P. O. Box 468 Bridgman, MIichigan 49106 Gentlemen:

He have received and revieMed the ten operator and nine senior operator applications for the D. C. Cook tiucloar Plant, Unit tfo. l. L,'e find the applications to be in order, with the followin'g exceptions:

The applications for Hessrs. )randolph, Tollas, Strasser, Craig, Foss, Lewis, Vonk and Perrine do not contain the certifications from the Combustion Engineering Training School. Prior to the administration of the operating tests, these certifications must be forwarded to this office. Also, Hr. Skinner s application indicated that his Certificate of'edical History has been fo~~carded to this office. To date, we have not received the Certificate.

The examinations have been assigned to Mr. A. .. Vinther and fir. T. E.

Edwards. The examinations are schedu'led for the week of January 17, 1977.

Sincerely, QRfQIN4X <" "'"<<<~r @~

P F. goD F48 Paul F. Collins, Chief Operator Licensing Branch Division of Project Management DISTRIBUTION! HRC PDR OLB R/F Central Files OLB Faci 1 i ty Files Do ket Files PM:OLB orrIch3r PFColli'2 OIIRNAMCW DATE~