Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 2024-09-09
[Table view] Category:Operating Report
MONTHYEARML16355A0982016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2 - Commitment Change Summary October 25, 2014 Through April 28, 2016 ML16355A0972016-10-24024 October 2016 Donald C. Cook Nuclear Plant - Report of Changes, Test, Experiments Pursuant to 10 CFR 50.59(d)(2) AEP-NRC-2013-91, Core Operating Limits Report (COLR) Cycle 21, Revision 02013-11-0606 November 2013 Core Operating Limits Report (COLR) Cycle 21, Revision 0 ML0501401872005-01-0606 January 2005 Reactor Pressure Vessel Upper and Lower Head Inspection Results ML0219604562002-07-12012 July 2002 June 2002 Monthly Operating Report for Donald C Cook Nuclear Plant Units 1 and 2 ML0213700292002-05-15015 May 2002 Submittal of Core Operating Limits Report for Donald C. Cook Unit 2 ML18219D3481978-05-15015 May 1978 05/15/1978 Letter Monthly Operating Report for April 1978 ML18219D3491978-04-13013 April 1978 04/13/1978 Letter Monthly Operating Report for March 1978 ML18219D3511978-03-13013 March 1978 03/13/1978 Letter Monthly Operating Report for February 1978 & Response to Refueling Information for Unit 1 Requested by Letter of 1/18/1978 ML18219D3521978-02-10010 February 1978 02/10/1978 Letter Monthly Operating Report for January 1978 ML18219D3531978-01-0606 January 1978 01/06/1978 Letter Monthly Operating Report for December 1977 ML18219D3541977-12-0606 December 1977 12/06/1977 Letter Monthly Operating Report for November 1977 ML18219E0831976-06-0808 June 1976 Attached Corrected Appendix C of Operating Report for Month of May 1976 for Replacement of Appendix C Sheet 2016-10-24
[Table view] Category:Monthly
MONTHYEARML0219604562002-07-12012 July 2002 June 2002 Monthly Operating Report for Donald C Cook Nuclear Plant Units 1 and 2 ML18219D3481978-05-15015 May 1978 05/15/1978 Letter Monthly Operating Report for April 1978 ML18219D3491978-04-13013 April 1978 04/13/1978 Letter Monthly Operating Report for March 1978 ML18219D3511978-03-13013 March 1978 03/13/1978 Letter Monthly Operating Report for February 1978 & Response to Refueling Information for Unit 1 Requested by Letter of 1/18/1978 ML18219D3521978-02-10010 February 1978 02/10/1978 Letter Monthly Operating Report for January 1978 ML18219D3531978-01-0606 January 1978 01/06/1978 Letter Monthly Operating Report for December 1977 ML18219D3541977-12-0606 December 1977 12/06/1977 Letter Monthly Operating Report for November 1977 ML18219E0831976-06-0808 June 1976 Attached Corrected Appendix C of Operating Report for Month of May 1976 for Replacement of Appendix C Sheet 2002-07-12
[Table view] |
Text
U.S. NUCLEAR REGULATOR MISSI~ DOCKET NUMBER NP~C l2.'76)
FOgI.195 t~
6 o- 3IS I NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL TO DATE OF DOCUMENT Indiana & Michigan Power Company 12/06/77 No 'Ro Co Bridgman, Michigan DATE RECEIVED D+ V~ Sheller 12/14/77 LE ON R IZED PROP INPUT FORM NUMBER OF COPIES RECEIVED ORIGINAL UNC LASS IF I E D ENCLOSURE'ROM:
OCOPY DESCRIPTION LTR TRANS THE FOLUMXG: N3HQKY HEPGRZ FOR 'November 1977 PIC &, CCMPC5ENZ OPERABILITY 6 AVAII'ABILITY.
'IHIS'EPGRZ TO BE USE IN PHEPARENG 'GRAY BOOK BY HANS 6c'OPIBAZlONS.
(1-P) {3 P)
~NT ~ilAME: Cook Unit No 1 R JL 12/14/77 FOR ACTION/INFORMATION MUG N INTERNAL 0 IST R I BUTION DR EXTERNAL DISTRIBUTION CONTROL NUMBER
~
sr NSIC 773480001
4 t
P~~~jf g
~
DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106
'Dgqg 6 9 a ~;
December 6, 1977 gp Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Pursuant to the requirements of the United States Nuclear Regulatory Commission Guide 1. 16, Revision 4, the attached monthly reports for the month of November, 1977 are submitted.
Sin cerely, D. V. Shaller Plant Manager DVS:pk Attachments cc: R. W. Jurgensen NRC Region III K. R. Baker R. C. Callen R. Walsh S. J. Mierzwa J. E.-Dolan R. J. Vollen "
G. E. Lien .
K. W. Brown J. M. Hennigan'.
W. Steketee A. F. Kozl owski J. F. Stietzel PNSRC Fi1 e 73qe00~
~
- %> M8'9ÃS@>'><4N'
APPENDIX B AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
4'1 12-1-77 COMPLETED BY ~
TELEPHONE 61 6 465-5901 1977
'ovember, DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 1042 1046 17 782 599 19 413 20 420 420 415 23 624 24 858 0 25 10 1040 26 1043 12 1044 13 747 29
'043 14 30 15 1046 31 16.
1047
'NSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
'IIMse figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
1.16-8
'< 4.
APPENDIX C
'PERATING DATA REPORT 50-315 DOCKET NO.
UNIT DATE 12 '
COMPLETED BY r
TELEPHONE <<16 465-5901 OPERATING STATUS
- 1. REPORTING PERIOD: GROSS HOURS IN REPORTING PERIOD:
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): MAX. DEPEND. CAPACITY (MWe-Net):
- 3. POWE R LEVELTO WHICH RESTRICTED (IF ANY) (MWe Net):
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5., NUMBER OF HOURS REACTOR WAS CRITICAL 411. 8 6,165. 8 19943.'1
- 6. REACTOR RESERVE SHUTDOWN HOURS 463
- 7. HOURS GENERATOR ON LINE 411. 8 5,988. 4 19295. 4 B. UNIT RESERVE SHUTDOWN HOURS 0 0 321
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 1,05'1,487 13,435,203 49 513 073 344,360 4',332,570 16,078,140
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH).......
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 329,770 4,123 761 ~15 3~+5
- 12. REACTOR SERVICE FACTOR 57. 2 76. 9
- 13. REACTOR AVAILABILITY FACTOR 57.2 76.9
- 14. UNIT SERVICE FACTOR 57.2 74.7 79. 8
- 15. UNIT AVAILABILITY FACTOR 57.2 74. 7 79.8
- 16. UNIT CAPACITY FACTOR (Using MOC) 43. 9
- 17. UNIT CAPACITY FACTOR (Using Design MWe)
- 43. 5 62.0
- 16. UNIT FORCED OUTAGE RATE
- 42. 8 8. 6- 6.8
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, ANO DURATION OF EACH):
- 20. IF SHUT DOWN AT ENO OF REPORT PERIOD, ESTIMATED DATE OF STARTUP 21 ~ UNITS IN TEST STATUS (PRIOR TO COMMERCIALOPERATION): FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION 1.16-9
J a El I
~' '..k wg C:
F,
NO. DATE TYPE FI FORCED S: SCHEDULED DURATION (HOURS)
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH REASON ())
NOVEMBER METHOD OF SHUTTING DOWN THE REACTOR OR 1977 REDUCING POWER (2)
DOCKET NO.
IINt7 NUMB Il COMPLETED ATE TELWIIONR gy
~
CORRECTIVE ACTIONS/COMMENTS IIII 12-6-77 B. A. Svensson it //.1 109 771102 0 Reduced reactor power to 61% for fuel conservation.
110 771103 s
Reduced reactor power to 45K for fuel conservation. Increased power to 70Ã 771108. Increased power to 100% 771109.
771113 Reduced reactor power to 505 to supply steam through crosstie to Unit No. 2 for Unit No. 2 steam dump test. Returned reactor power to lOOX the same day.
112 771118 308.2 . Reactor shutdown and unit placed in cold shutdown condition (Node 5) per N.R.C.
order. Reason for shutdown was to replace unqualified electrical connectors with connectors or splices meeting the requirements of the Nuclear Regulatory Commi ssion's regulations.
SUMMARY
- From the beginning of the month until the shutdown on 771118 the unit was loaded as required to meet system conditions.
RFCFIVFO OOCUMEHT
'"'SIHG UNIT