ML18219D353

From kanterella
Jump to navigation Jump to search
Letter Monthly Operating Report for December 1977
ML18219D353
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/06/1978
From: Shaller D
American Electric Power, Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To:
Office of Nuclear Reactor Regulation
References
Download: ML18219D353 (9)


Text

NRC FoRM 196 I2.76)

U.S. NUCLEAR REGUI ATORY C ISSION DOCK T NUMB NRC DISTRIBUTION FoR PART 50 DOCKET M/TERIAL NAKV'SrOZr TO

~ I No Ro Co FROM:

Indiana

& Michigan Power Company Bridgman, Michigan Di Vi Sheller DATE OF DOCUMENT 1/6/78 DATE RECEIVED 1/10/78 ETTE R RIGINAL COPY DESCRIPTION ONOTORIZEO UN C LASS( F I E0 PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED LTR TRANS TFE H3LIQNIhG:

~Q+Y~~ POR 'December, 1977 PQKZ 6c CGMPONBZ OPEBABILITY 6c AVAILABILITY.

THIS'EPORT TO BE USE IN PHEPARING 'GRAY BXK BY PLANS 6c OPERATIONS.

PLANT K&K: Cook RJL 1/10/78 MAC W OR FOR ACTION/INFORMATION E c

INTERNALDISTR I BUTION LIC ASST.

TIC:

NSIC EXTERNAL DISTR I BUTIOiV CONTROL NUMBER PPi29

I i ~

II

DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 y

D eN January 6,

1978 Director, Office of Management Information and Program Control U.

S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of the United States Nuclear Regulatory Commission Guide 1.16, Revision 4, the attached monthly reports for the month of December, 1977 are submitted.

Sin ce re ly, D.

V. Shaller Plant Manager DVS:pk Attachments cc:

R.

W. Jurgensen HRC Region III K.

R. Baker R.

C. Callen R. Walsh S. J.

Mierzwa J.

E.

Dolan R.

J.

Vollen G.

E. Lien K.

W.

Brown J.

M. Hennigan P.

W. Steketee A.

F.

Kozlowski J.

F. Stietzel PNSRC File 78OioOi2~

ad'4-a,.'.

APPENDIX B AVERAGEDAILYUNITPOWER LEVEL I

DOCKET NO.

UNIT bl 1-3-78 COMPLETED BY H. T. Gillett TELEPHONE 616-465-5901 MONTH December DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 1 0

DAY AVERAGE DAILYPOWER LEVEL (ilIWe-N t) 1047 17 9

r.

10 12 fP 13 15 16.

0 0

674 1034 1044 1042 1043 1040 1005 1040

'043 696 750 1043 18 19 20 21

~

22 23 25 26 27 28 29 30 31 1042 1040 1047 1045 1047 1010 9'47 1041

')

050'046 1042 1021 1041 INSTRUCTIONS On this form, list the average daily unit power level in Mac.Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1007o linc (or the restricted power level line). In such

cases, the average daily unit power output sheet should "b.

footnoted to explain the apparent anomaly.

I.I6.8

l

~

APPENDIX C OPERATING DATAREPORT DOCKET NO.

UN(T

¹1 DATE COMPLETED 8Y TELEPHONE 616-465-590]

OPERATING STATUS

1. REPORTING PERIOD:

1 77-,1 2-01 GROSS HOURS IN REPORTING PERIOD:

2. CURRER LY AU RORIZ-D POWER LEVEL(Ailf"MAX.DEPEND. CAPAC)TY(MWeNet):

,-,. 3250 1044 DESIGie ELECTRICALRATIilG(MWe Net):

3. POWER LFVELTO WHICH RESTRICTED (IF ANY) (MVle-Net):
4. REASONS FOR RESTRICTIOiV (IF ANY):
5. NUMBER OF HoiJRS REACTOR WAS CRITICAL
6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR OiV LINE
8. UNIT RESERVE SHUTOOYP'iV HOURS
9. GROSS THERiIALEiV(:RGYGENFRATED (Pr1(tt'JH)
10. GROSS ELECTRICAL EiVERGY GENERATED (I'vl'eYH)
11. NET ELECTRICALENERGY GENERATED (i'rlWH)
12. REACTOR SERVICE FACTOR
13. REACTOR AVAiLABILITYFACTOR
14. UiVITSERVICE FACTOR

'15. UNITAVAILABILITYFACTOR

16. UNIT CAPACITY FACTOR (Using MDC)
17. UNITCAPACITY FACTOR (Using Design MWe)
18. UNIT FORCED OUTAGE RATE

~

THIS MONTH 679. 6 0

674.4 0

068 9()0 686,950

91. 3
90. 6
90. 6
85. 2 84.4 9.4 YR TO DATE CUMULATIVE 6,854. 4, 20,622. 7 0

463. 0 6 662.8 19 969.8 0

~~a 4~3~~~93 5.0')9 520 16 765 090 9~I~14 78.1 76-1

80. 2
76. 1
80. 2
52. 3 68.4 51.8 62.9 8.7 6.9 19 SHUTDOWNS SCHEDULED OVER NEXT 6 iAONTHS (TYPE DATE ANO DURATIONOF EACH)
20. IF SHUT OOWIV AT EiVD OF REPORT PERIOD, ESTIMATED DATE OF STARTUI:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIALOPERATION):

FORECAST ACHIEVED INITIALCRITICALITY liVITIALFLECTRICITY CohlM FR CI AL OP E RAT I ON

\\

  • Includes a-25,820 BTU to correct an error made in September 1977 report.

1.16-9

APPENDIX D UNITSHUTDOWNS AND POWER REDUCTIONS REppRT QONTH DECEMBER 1977

}

~

~

DOCKET NP.

UNIT NAME~

Unit'.1 DATE 1-6-78

".}

I COMpI.ETED BY B. A. Svensson TELEPIIONE 616 465-5901 NO.

DATE

112, 771201 113 771210 114 771214 115 771223 116 771228 TYPE Ft FORCED S: SCHEDULED DURATION IHOUBS)
69. 6 REASON ())

A A

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2) 4 CORRECTIVE ACTIONS/COMMENTS Outage continued from November, 1977.

Reason for outage was to replace unqualifie electrical connectors on safety related circuits inside the containment.

Unit returned to service 771203.

Increasing pow to 100K.

Reduced reactor power to 65K for NIS Incore Excore calibration surveillance test.

Increased power to 100%%d 771211.

Reduced reactor power to 45%%d due to problem with condensate booster pumps.

Further re=

duced power to 30%%d due to condenser tube leakage.

Increased power to 100K 771215.

P Reduced reactor power to 74%%d for noderator temperature coeffi cient surveil.lance test.

Increased power to 100Ã 771224.

Reduced reactor power to 74K to permit cont valve testing due to EHC system low oil pre problem.

Power increase delayed due to fai of diaphragm valve on CVCS holdup tanks.

Increased power to 100%%d 771230.

IC c

c ol sure

'rei:

SUMMARY

Unit operated at 100%%d power except for above noted outages.

c I

ECEIVED 00CUlABiT PROCKSSitiG U'f(li i r 1918 8tl 10 JN 9 55