Similar Documents at Cook |
---|
Category:Letter
MONTHYEAR05000316/LER-2024-004, AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications2024-11-11011 November 2024 AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications IR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] Category:Operating Report
MONTHYEARML16355A0982016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2 - Commitment Change Summary October 25, 2014 Through April 28, 2016 ML16355A0972016-10-24024 October 2016 Donald C. Cook Nuclear Plant - Report of Changes, Test, Experiments Pursuant to 10 CFR 50.59(d)(2) AEP-NRC-2013-91, Core Operating Limits Report (COLR) Cycle 21, Revision 02013-11-0606 November 2013 Core Operating Limits Report (COLR) Cycle 21, Revision 0 ML0501401872005-01-0606 January 2005 Reactor Pressure Vessel Upper and Lower Head Inspection Results ML0219604562002-07-12012 July 2002 June 2002 Monthly Operating Report for Donald C Cook Nuclear Plant Units 1 and 2 ML0213700292002-05-15015 May 2002 Submittal of Core Operating Limits Report for Donald C. Cook Unit 2 ML18219D3481978-05-15015 May 1978 05/15/1978 Letter Monthly Operating Report for April 1978 ML18219D3491978-04-13013 April 1978 04/13/1978 Letter Monthly Operating Report for March 1978 ML18219D3511978-03-13013 March 1978 03/13/1978 Letter Monthly Operating Report for February 1978 & Response to Refueling Information for Unit 1 Requested by Letter of 1/18/1978 ML18219D3521978-02-10010 February 1978 02/10/1978 Letter Monthly Operating Report for January 1978 ML18219D3531978-01-0606 January 1978 01/06/1978 Letter Monthly Operating Report for December 1977 ML18219D3541977-12-0606 December 1977 12/06/1977 Letter Monthly Operating Report for November 1977 ML18219E0831976-06-0808 June 1976 Attached Corrected Appendix C of Operating Report for Month of May 1976 for Replacement of Appendix C Sheet 2016-10-24
[Table view] Category:Monthly
MONTHYEARML0219604562002-07-12012 July 2002 June 2002 Monthly Operating Report for Donald C Cook Nuclear Plant Units 1 and 2 ML18219D3481978-05-15015 May 1978 05/15/1978 Letter Monthly Operating Report for April 1978 ML18219D3491978-04-13013 April 1978 04/13/1978 Letter Monthly Operating Report for March 1978 ML18219D3511978-03-13013 March 1978 03/13/1978 Letter Monthly Operating Report for February 1978 & Response to Refueling Information for Unit 1 Requested by Letter of 1/18/1978 ML18219D3521978-02-10010 February 1978 02/10/1978 Letter Monthly Operating Report for January 1978 ML18219D3531978-01-0606 January 1978 01/06/1978 Letter Monthly Operating Report for December 1977 ML18219D3541977-12-0606 December 1977 12/06/1977 Letter Monthly Operating Report for November 1977 ML18219E0831976-06-0808 June 1976 Attached Corrected Appendix C of Operating Report for Month of May 1976 for Replacement of Appendix C Sheet 2002-07-12
[Table view] |
Text
NRC FoRM 196 U.S. NUCLEAR REGUI ATORY C ISSION DOCK T NUMB I2.76)
NRC DISTRIBUTION FoR PART 50 DOCKET M/TERIAL NAKV'SrOZr
~ I FROM: DATE OF DOCUMENT TO Indiana & Michigan Power Company 1/6/78 No Ro Co Bridgman, Michigan DATE RECEIVED Di Vi Sheller 1/10/78 ETTE R ONOTORIZEO PROP INPUT FORM NUMBER OF COPIES RECEIVED RIGINAL UN C LASS( F I E 0 COPY DESCRIPTION ENCLOSURE LTR TRANS TFE H3LIQNIhG: ~Q+Y ~~ POR 'December, 1977 PQKZ 6c CGMPONBZ OPEBABILITY 6c AVAILABILITY.
THIS'EPORT TO BE USE IN PHEPARING 'GRAY BXK BY PLANS 6c OPERATIONS.
PLANT K&K: Cook RJL 1/10/78 FOR ACTION/INFORMATION E c MAC W OR INTERNAL D ISTR I BUTION LIC ASST.
EXTERNAL DISTR I BUTIOiV CONTROL NUMBER TIC:
NSIC PPi29
I i ~
II
DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 y D eN January 6, 1978 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Pursuant to the requirements of the United States Nuclear Regulatory Commission Guide 1.16, Revision 4, the attached monthly reports for the month of December, 1977 are submitted.
Sin ce re ly, D. V. Shaller Plant Manager DVS:pk Attachments cc: R. W. Jurgensen HRC Region III K. R. Baker R. C. Callen R. Walsh S. J. Mierzwa J. E. Dolan R. J. Vollen G. E. Lien K. W. Brown J. M. Hennigan P. W. Steketee A. F. Kozlowski J. F. Stietzel PNSRC File 78OioOi2~
ad'4-a, .'.
APPENDIX B AVERAGE DAILYUNIT POWER LEVEL I
DOCKET NO.
UNIT bl 1-3-78 COMPLETED BY H. T. Gillett TELEPHONE 616-465-5901 December MONTH DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (ilIWe-N t) 0 1047 1 17 0 1042 18 0 1040 19 674 1047 20 1034 21 ~
1045 1044 1047 22 1042 1010 23 1043 9'47 9
1040 1041 25 r.
')
10 1005 26 050'046 27 1040 1042 12 28 fP '043 13 29 696 1021 30 15 750 1041 31 16.
1043 INSTRUCTIONS On this form, list the average daily unit power level in Mac.Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1007o linc (or the restricted power level line). In such cases, the average daily unit power output sheet should "b.
footnoted to explain the apparent anomaly.
I. I6.8
l
~ .
APPENDIX C OPERATING DATA REPORT DOCKET NO.
UN(T ¹1 DATE COMPLETED 8Y TELEPHONE 616-465-590]
OPERATING STATUS 1 77-,1 2-01 GROSS HOURS IN REPORTING PERIOD:
- 1. REPORTING PERIOD:
- 2. CURRER LY AU RORIZ-D POWER LEVEL (Ail,-,.
DESIGie ELECTRICAL RATIilG (MWe Net): f "MAX.
3250 DEPEND. CAPAC)TY(MWe Net): 1044
- 3. POWER LFVELTO WHICH RESTRICTED (IF ANY) (MVle-Net):
- 4. REASONS FOR RESTRICTIOiV (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HoiJRS REACTOR WAS CRITICAL 679. 6 6,854. 4, 20,622. 7 0 0 463. 0
- 6. REACTOR RESERVE SHUTDOWN HOURS
- 7. HOURS GENERATOR OiV LINE 674.4 6 662.8 19 969.8
- 8. UNIT RESERVE SHUTOOYP'iV HOURS 0 0
- 9. GROSS THERiIALEiV(:RGY GENFRATED (Pr1(tt'JH)
' 068 9()0 ~~a 4~3~~~93
- 10. GROSS ELECTRICAL EiV ERGY GENERATED (I'vl'eYH) 686,950 5.0')9 520 16 765 090
- 11. NET ELECTRICAL ENERGY GENERATED (i'rlWH) 9 ~I~14
- 12. REACTOR SERVICE FACTOR
- 13. REACTOR AVAiLABILITY FACTOR 91. 3 78.1
- 14. UiVITSERVICE FACTOR
- 90. 6 76-1 80. 2
'15. UNIT AVAILABILITY FACTOR 90. 6 76. 1 80. 2
- 16. UNIT CAPACITY FACTOR (Using MDC) 85. 2 52. 3 68.4
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 84.4 51.8 62.9
- 18. UNIT FORCED OUTAGE RATE . ~
9.4 8.7 6.9 19 SHUTDOWNS SCHEDULED OVER NEXT 6 iAONTHS (TYPE DATE ANO DURATION OF EACH)
- 20. IF SHUT OOWIV AT EiVD OF REPORT PERIOD, ESTIMATED DATE OF STARTUI:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIALOPERATION): FORECAST ACHIEVED INITIALCRITICALITY liVITIALFLECTRICITY CohlM FR CI AL OP E RAT I ON
\
- Includes a-25,820 BTU to correct an error made in September 1977 report.
1.16-9
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REppRT QONTH DECEMBER 1977 DOCKET NP.
UNIT NAME DATE TELEPIIONE 616
~ 1-6-78 COMpI.ETED BY B. A. Svensson Unit'.1 465-5901
}
".}
~ ~
I METHOD OF TYPE SHUTTING DOWN Ft FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED IHOUBS) REASON ()) REDUCING POWER (2) CORRECTIVE ACTIONS/COMMENTS IC 112, 771201 69. 6 Outage continued from November, 1977. c Reason for outage was to replace unqualifie electrical connectors on safety related circuits inside the containment. Unit returned to service 771203. Increasing pow to 100K.
113 771210 reactor power to Reduced 65K for NIS Incore Excore calibration surveillance test.
Increased power to 100%%d 771211.
114 771214 A 4 Reduced reactor power to 45%%d due to problem with condensate booster pumps. Further re=
duced power to 30%%d due to condenser tube leakage. Increased power to 100K 771215.
P 115 771223 Reduced reactor power to 74%%d for noderator temperature coeffi cient surveil.lance test.
Increased power to 100Ã 771224.
116 771228 A Reduced reactor power to 74K to permit cont ol c valve testing due to EHC system low oil pre sure problem. Power increase delayed due to fai of diaphragm valve i: 're on CVCS holdup tanks.
Increased power to 100%%d 771230.
SUMMARY
- Unit operated at 100%%d power except for above noted outages.
c I
00CUlABiT ECEIV ED U'f(li PROCKSSitiG i r JN 9 55 1918 8tl 10