ML18219B533
| ML18219B533 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/03/1978 |
| From: | Shaller D American Electrtic Power System, Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co) |
| To: | James Keppler NRC/IE, NRC/RGN-III |
| References | |
| Download: ML18219B533 (3) | |
Text
O/
REGULATORY INFORMATION DISTRIBUTION SYSTEM
< RIDS)
DlSTRIBUTION FOR INCOMING MATERIAL 50-316 REC:
KEPPLER J G
NRC ORG:
SHALLER D V IN 8( MI PWR DOCDATE: 05/03/78 DATE RCVD: 05l09/78 DOCTYPE:
LETTER NQTARI2 ED:
NO COPIES RECEIVED
SUBJECT:
LTR 1
ENCL 0 CONFIRMING VERBAL REPT OF REPORTABLE OCCURANCE ON 05j'03/78 CONCERNING WHEN UNIT 2 ENTERED MODE 4i THE CONTAINMENT SPRAY PUMP SWITCHES WERE NOT IN THE AUTOMATIC STANDBY POSITION... ADVISING FOLLOWUP REPT WILL BE SUBMITTED BY 05r 1 ~x 78.
PLANT NAME: COOK UNIT 2 REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL;~
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS NOTES:
i.
SEND 3 COPIES OF ALL MATERIAL TO IRE INCIDENT REPORTS (DISTRIBUTION CODE A002>
FOR ACTION:
INTERNAL'XTERNAL:
BR CHIEF KNIEL++L Y(4>
LPDR S ST.
JOSEPH>
MImwLTR ONLY(1>
TIC+4~LTR ONLY < 1 )
NSIC~~~LTR ONLY(i >
ACRS CAT B4~+LTR ONLY< 16)
FILE++LTR ONLY(l) 5 E4t4~I TR ONLY)
SCHRO PPG
++LTR ONLY(i>
NQVAKJCHECK4+LTR OI4LY< 1)
KNIGHT4~4LTR ONLY(1>
IHANAUER%4LTR ONLY< 1)
EISENHUT~~4~LTR ONLY(i >
SHAO~l~~LTR ONLY(1)
KREGER/J.
COLLINS+~~LTR ONLY ( 1 K SEYFRITJ'IE++LTR ONLY( 1)
NRC PDR+>LTR ONLY(i>
MIPC++LTR ONLY<3)
HOUSTON++LTR ONLY(1)
EEB4+LTR ONLY(1)
BUTLER<+LTR ONLY(i>
TEDESCO+wLTR ONLY<1)
BAERw+LTR ONLY(i>
VOLLMER/BUNCI-l~oLTR ONLY< 1)
ROSA+4LTR ONLY(i>
COPIES NOT SURIITTED PER REGULATORY GUIDE 10.1 DISTRIBU'IION:
LTR 45 ENCL 0 SIZE:
1P THE END CONTROL NBR:
781310021
0
PNlfL00!IItML'ttlA'ILP IP)'5L msrlcon leo~
INDIANA5 MlCHIGANPOt/t/ER COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 May 3, 1978 Ql CV CONC=
~cnn FJfill cn Mr. J.G-.
- Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission
-- Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
Operating License DPR-74 Docket No. 50-316 This is to confirm our verbal report to NRC Region III Inspector, Mr. K.R. Baker, at 0915 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.481575e-4 months <br /> on May 3, 1978.
At that time we reported that when Unit 82 entered Mode 4, the Containment Spray Pump switches were not in the automatic standby position.
A followup report will be submitted by May 16,
- 1978, as required by Technical Specification 6.9. 1.8..
Sincerely, D..V. Shaller Plant Manager
/bab cc:
JOE.
Dolan R.W. Jurgensen R.F.
Kroeger R. Kilburn R.J.
Vollen BPI K.R. Baker RO:III R.C. Callen'PSC P.W. Steketee, Esq.
G. Charnoff, Esq.
R. Walsh, Esq.
J.M. Hennigan G.
Olson PNSRC J.F. Stietzel Dir., IE (40 copies) nir..
Mlpc', (4 rnni~s)
~Slag 00 k'~,t