MONTHYEAR05000316/LER-2024-004, AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications2024-11-11011 November 2024 AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications IR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000316/LER-2024-004, AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications2024-11-11011 November 2024 AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip 05000315/LER-2023-002, Failure of Unit 1 West Auxiliary Feedwater Pump to Restart During Load Sequencer Testing2023-12-12012 December 2023 Failure of Unit 1 West Auxiliary Feedwater Pump to Restart During Load Sequencer Testing 05000315/LER-2023-001, Two Trains of Fuel Handling Area Exhaust Ventilation Inoperable2023-09-28028 September 2023 Two Trains of Fuel Handling Area Exhaust Ventilation Inoperable 05000315/LER-2022-003-01, Automatic Trip on Losss of Flow Due to Reactor Coolant Pump Trip2023-02-22022 February 2023 Automatic Trip on Losss of Flow Due to Reactor Coolant Pump Trip 05000316/LER-2022-001, Automatic Reactor Trip Due to Steam Generator High-High Level2023-01-0404 January 2023 Automatic Reactor Trip Due to Steam Generator High-High Level 05000315/LER-2022-003, Automatic Reactor Trip on Loss of Flow Due to Reactor Coolant Pump Trip2022-10-19019 October 2022 Automatic Reactor Trip on Loss of Flow Due to Reactor Coolant Pump Trip 05000315/LER-2022-002, Ice Condenser Door Inoperable Resulting in a Condition Prohibited by Technical Specifications2022-09-20020 September 2022 Ice Condenser Door Inoperable Resulting in a Condition Prohibited by Technical Specifications 05000315/LER-2022-001, Manual Reactor Trio Following Manual Turbine Trio Due to High Vibrations on Main Turbine2022-07-21021 July 2022 Manual Reactor Trio Following Manual Turbine Trio Due to High Vibrations on Main Turbine 05000316/LER-2021-002, Re Manual Reactor Trip Due to an Unisolable Steam Leak2021-08-18018 August 2021 Re Manual Reactor Trip Due to an Unisolable Steam Leak 05000315/LER-2021-001, Main Steam Safety Valve Setpoints Found Outside Technical Specifications Limits2021-06-10010 June 2021 Main Steam Safety Valve Setpoints Found Outside Technical Specifications Limits 05000316/LER-2020-004-01, Regarding Unit 2 Automatic Reactor Trip on Low-Low 24 Steam Generator Water Level2021-02-25025 February 2021 Regarding Unit 2 Automatic Reactor Trip on Low-Low 24 Steam Generator Water Level 05000316/LER-2020-004, Automatic Reactor Trip on Low-Low 24 Steam Generator Water Level2020-12-0909 December 2020 Automatic Reactor Trip on Low-Low 24 Steam Generator Water Level 05000315/LER-2020-001, Containment Closure Requirements Not Met During Refueling Operations2020-12-0909 December 2020 Containment Closure Requirements Not Met During Refueling Operations 05000316/LER-2020-003, Manual Reactor Trip and Automatic Safety Injection Due to Failed Open Pressurizer Spray Valve2020-11-0202 November 2020 Manual Reactor Trip and Automatic Safety Injection Due to Failed Open Pressurizer Spray Valve 05000316/LER-2020-002, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Leakage2020-06-25025 June 2020 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Leakage 05000316/LER-2020-001, Failure of Source Range Nuclear Instrumentation Resulting in a Condition Prohibited by Technical Specifications2020-01-0909 January 2020 Failure of Source Range Nuclear Instrumentation Resulting in a Condition Prohibited by Technical Specifications 05000315/LER-2019-002, Condition Prohibited by Technical Specification Due to an Inoperable Steam Generator Stop Valve Dump Valve2019-11-26026 November 2019 Condition Prohibited by Technical Specification Due to an Inoperable Steam Generator Stop Valve Dump Valve 05000316/LER-2017-0012017-05-19019 May 2017 1 OF 5, LER 17-001-00 for Cook, Unit 2 re Containment Hydrogen Skimmer Ventilation Fan #1 Inoperable Longer than Allowed by Technical Specifications 05000316/LER-2016-0022017-02-0909 February 2017 Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue, LER 16-002-00 for Donald C. Cook Nuclear Plant Unit 2 Regarding Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue 05000316/LER-2016-0012016-08-31031 August 2016 Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure, LER 16-001-00 for Donald C. Cook Nuclear Plant, Unit 2 Regarding Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure ML16193A3902016-07-15015 July 2016 Donald C. Cook Nuclear Plant Unit 2 - A Loss of Main Condenser Event Occurred Due to a Storm-Induced Debris Damage of the Circulating Water System Pumps in the Forebay (LER-316-2014-003-00) 05000315/LER-2015-0022016-01-18018 January 2016 -Technical Specification Violation due to Inoperable Residual. Heat Removal Pump, LER 15-002-01 for D.C. Cook, Unit 1, Regarding Technical Specification Violation Due to Inoperable Residual Heat Removal Pump 05000316/LER-2015-0012016-01-15015 January 2016 Manual Reactor Trip Due To A Secondary Plant Transient, LER 15-001-01 for D.C. Cook, Unit 2, Regarding Manual Reactor Trip Due to a Secondary Plant Transient ML0528703602005-10-0505 October 2005 Special Report for D. C. Cook Unit 2 Re Unit 2 Reactor Coolant Inventory Tracking System ML0508903452005-03-22022 March 2005 LER 99-001-01 Donald C. Cook Nuclear Plant Unit 2, Regarding Supplemental LER for Degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations ML0210601432002-04-12012 April 2002 LER 02-02-00, Donald C. Cook Nuclear Plant Unit 2, Technical Specification 3.9.4.c Was Violated During Core Alteration ML0209205342002-03-15015 March 2002 LER 99-012-01 for Cook Nuclear Plant, Unit 1 Re Auxiliary Building ESF Ventilation System May Not Be Capable of Maintaining ESF Room Temperature Post-Accident ML9936300511999-12-20020 December 1999 LER 99-S004-00, Intentionally Falsifying Documentation Results in Unauthorized Unescorted Access, on 11/18/99. with Letter Dated 12/20/99 05000315/LER-1999-027, LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination1999-11-29029 November 1999 LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination ML18219E1521978-09-27027 September 1978 Submit Licensee Event Report Nos. RO 78-051/03L-0 & RO 78-052/03L-0 ML18219B5201978-09-27027 September 1978 09/27/1978 Letter Enclosure of Licensee Event Report ML18219B5211978-09-19019 September 1978 09/19/1978 Letter Enclosure of Licensee Event Report ML18219E1531978-09-18018 September 1978 Submit Licensee Event Report No. RO 78-050/03L-0 ML18219B5541978-09-18018 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-062/03L-0) ML18219E1541978-09-12012 September 1978 Submit Licensee Event Report No. RO 78-049/03L-0 ML18219B5551978-09-12012 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-56/03L-1 and RO 78-061/03L-0) ML18219B5561978-09-0808 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-059/03L-1 and RO 78-060/03L-0) ML18219E1551978-09-0808 September 1978 Submit Licensee Event Report No. RO 78-048/03L-0 ML18219B5571978-09-0505 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting License Event Report RO 78-059/03L-0 ML18219B5581978-08-30030 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report RO 78-058/03L-0 ML18219B5621978-08-22022 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-056/03L-0 and RO 78-057/03L-0) ML18219B5611978-08-18018 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-052/03L-0, RO 78-053/03L-0, RO 78-054-03L-0 and RO 78-055/03L-0) ML18219E1561978-08-15015 August 1978 Submit Licensee Event Report No. RO 78-047/03L-0 ML18219E1571978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-045/03L-0 & RO 78-046/03L-0 ML18219E1581978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-043/03L-1 & RO 78-044/03L-1 ML18219E1601978-08-11011 August 1978 Submit Licensee Event Report Nos. 1978-043-03L & 1978-044-03L 2024-09-12
[Table view] |
Text
O/
REGULATORY INFORMATION DISTRIBUTION SYSTEM < RIDS)
DlSTRIBUTION FOR INCOMING MATERIAL 50-316 REC: KEPPLER J G ORG: SHALLER D V DOCDATE: 05/03/78 NRC IN 8( MI PWR DATE RCVD: 05l09/78 DOCTYPE: LETTER NQTARI 2 ED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 0 CONFIRMING VERBAL REPT OF REPORTABLE OCCURANCE ON 05j'03/78 CONCERNING WHEN UNIT 2 ENTERED MODE 4i THE CONTAINMENT SPRAY PUMP SWITCHES WERE NOT IN THE AUTOMATIC STANDBY POSITION... ADVISING FOLLOWUP REPT WILL BE SUBMITTED BY 05r 1 ~x 78.
PLANT NAME: COOK UNIT 2 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS REVIEWER DISTRIBUTOR INITIAL: X JM INITIAL; ~
NOTES:
- i. SEND 3 COPIES OF ALL MATERIAL TO IRE INCIDENT REPORTS (DISTRIBUTION CODE A002>
FOR ACTION: BR CHIEF KNIEL++L Y(4>
FILE++LTR ONLY(l ) NRC PDR+>LTR ONLY(i>
5 E4t4~I TR ONLY) MIPC++LTR ONLY<3)
SCHRO PPG ++LTR ONLY(i> HOUSTON++LTR ONLY(1)
NQVAKJCHECK4+LTR OI4LY< 1) EEB4+LTR ONLY(1)
KNIGHT4~4LTR ONLY(1> BUTLER<+LTR ONLY(i>
INTERNAL'XTERNAL: IHANAUER%4LTR ONLY< 1) TEDESCO+wLTR ONLY<1)
EISENHUT~~4~LTR ONLY(i > BAERw+LTR ONLY(i>
SHAO~l~~LTR ONLY(1) VOLLMER/BUNCI-l~oLTR ONLY< 1)
KREGER/J. COLLINS+~~LTR ONLY ( 1 > ROSA+4LTR ONLY(i>
K SEYFRITJ'IE++LTR ONLY( 1)
LPDR S ST. JOSEPH> MImwLTR ONLY(1>
T I C+4~LTR ONLY < 1 )
NSIC~~~LTR ONLY(i >
ACRS CAT B4~+LTR ONLY < 16)
COPIES NOT SURIITTED PER REGULATORY GUIDE 10.1 DISTRIBU'IION: LTR 45 ENCL 0 CONTROL NBR: 781310021 SIZE: 1P THE END
0 PNlfL00!IItML'ttlA'ILP IP)'5L Ql msrlcon leo~ CV INDIANA 5 MlCHIGANPOt/t/ER COMPANY CONC=
DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106
~cnn May 3, 1978 FJ fill cn Mr. J.G-. Keppler, Regional Director Office of Inspection and Enforcement .
United States Nuclear Regulatory Commission
-- Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating Li cense DPR-74 Docket No. 50-316
Dear Mr. Keppler:
This is to confirm our verbal report to NRC Region III Inspector, Mr. K.R. Baker, at 0915 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.481575e-4 months <br /> on May 3, 1978.
At that time we reported that when Unit 82 entered Mode 4, the Containment Spray Pump switches were not in the automatic standby position.
A followup report will be submitted by May 16, 1978, as required by Technical Specification 6.9. 1.8..
Sincerely, D..V. Shaller Plant Manager
/bab cc: JOE. Dolan R.W. Jurgensen R.F. Kroeger R. Kilburn R.J. Vollen BPI K.R. Baker RO:III R.C. Callen'PSC P.W. Steketee, Esq. ~Slag 00 G. Charnoff, Esq.
R. Walsh, Esq.
J.M. Hennigan G. Olson PNSRC k'~,t J.F. Stietzel Dir., IE (40 copies)