ML18219B533

From kanterella
Jump to navigation Jump to search
Letter Licensee Event Report of Containment Spray Pump Switches Were Not in the Automatic Standby Position
ML18219B533
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/03/1978
From: Shaller D
American Electrtic Power System, Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To: James Keppler
NRC/IE, NRC/RGN-III
References
Download: ML18219B533 (3)


Text

O/

REGULATORY INFORMATION DISTRIBUTION SYSTEM

< RIDS)

DlSTRIBUTION FOR INCOMING MATERIAL 50-316 REC:

KEPPLER J G

NRC ORG:

SHALLER D V IN 8( MI PWR DOCDATE: 05/03/78 DATE RCVD: 05l09/78 DOCTYPE:

LETTER NQTARI2 ED:

NO COPIES RECEIVED

SUBJECT:

LTR 1

ENCL 0 CONFIRMING VERBAL REPT OF REPORTABLE OCCURANCE ON 05j'03/78 CONCERNING WHEN UNIT 2 ENTERED MODE 4i THE CONTAINMENT SPRAY PUMP SWITCHES WERE NOT IN THE AUTOMATIC STANDBY POSITION... ADVISING FOLLOWUP REPT WILL BE SUBMITTED BY 05r 1 ~x 78.

PLANT NAME: COOK UNIT 2 REVIEWER INITIAL:

XJM DISTRIBUTOR INITIAL;~

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS NOTES:

i.

SEND 3 COPIES OF ALL MATERIAL TO IRE INCIDENT REPORTS (DISTRIBUTION CODE A002>

FOR ACTION:

INTERNAL'XTERNAL:

BR CHIEF KNIEL++L Y(4>

LPDR S ST.

JOSEPH>

MImwLTR ONLY(1>

TIC+4~LTR ONLY < 1 )

NSIC~~~LTR ONLY(i >

ACRS CAT B4~+LTR ONLY< 16)

FILE++LTR ONLY(l) 5 E4t4~I TR ONLY)

SCHRO PPG

++LTR ONLY(i>

NQVAKJCHECK4+LTR OI4LY< 1)

KNIGHT4~4LTR ONLY(1>

IHANAUER%4LTR ONLY< 1)

EISENHUT~~4~LTR ONLY(i >

SHAO~l~~LTR ONLY(1)

KREGER/J.

COLLINS+~~LTR ONLY ( 1 K SEYFRITJ'IE++LTR ONLY( 1)

NRC PDR+>LTR ONLY(i>

MIPC++LTR ONLY<3)

HOUSTON++LTR ONLY(1)

EEB4+LTR ONLY(1)

BUTLER<+LTR ONLY(i>

TEDESCO+wLTR ONLY<1)

BAERw+LTR ONLY(i>

VOLLMER/BUNCI-l~oLTR ONLY< 1)

ROSA+4LTR ONLY(i>

COPIES NOT SURIITTED PER REGULATORY GUIDE 10.1 DISTRIBU'IION:

LTR 45 ENCL 0 SIZE:

1P THE END CONTROL NBR:

781310021

0

PNlfL00!IItML'ttlA'ILP IP)'5L msrlcon leo~

INDIANA5 MlCHIGANPOt/t/ER COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 May 3, 1978 Ql CV CONC=

~cnn FJfill cn Mr. J.G-.

Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission

-- Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

Operating License DPR-74 Docket No. 50-316 This is to confirm our verbal report to NRC Region III Inspector, Mr. K.R. Baker, at 0915 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.481575e-4 months <br /> on May 3, 1978.

At that time we reported that when Unit 82 entered Mode 4, the Containment Spray Pump switches were not in the automatic standby position.

A followup report will be submitted by May 16,

1978, as required by Technical Specification 6.9. 1.8..

Sincerely, D..V. Shaller Plant Manager

/bab cc:

JOE.

Dolan R.W. Jurgensen R.F.

Kroeger R. Kilburn R.J.

Vollen BPI K.R. Baker RO:III R.C. Callen'PSC P.W. Steketee, Esq.

G. Charnoff, Esq.

R. Walsh, Esq.

J.M. Hennigan G.

Olson PNSRC J.F. Stietzel Dir., IE (40 copies) nir..

Mlpc', (4 rnni~s)

~Slag 00 k'~,t