IPEIÃMCR ~I@I CICSIBIM %If P. O. BOX 2I666 'HOENIX, ARIZONA 85036 December 13, 1977 ANPP-'9899
) IIx'//,
Docket Nos. 50-528,50-58k,1 50-530
/;,
i/
Mr.
R.
H. Engelken, Director U.S. Nuclear Regulatory Commission Region V
202 llalnut Creek Plaza 1990 North California Boulevard Walnut. Creek California 94596
Subject:
NRC IE Bulletin 77-04, dated November 4, 1977 File:
D.4.01.1 77-005-026
~ 0
Dear Mr. Engelken:
We have reviewed the IE Bulletin 77-04 dated November 4,
1977 regarding a calculational error affecting the design performance of a system for controlling pH of containment sump water following a LOCA.
We intend to use trisodium phosphate dodecahydrate (TSP) for pH control in the containment sump for Palo Verde Nuclear Generating Station Units 1, 2
5 3; however, we have not finalized 'the design nor completed all calculations at this time..
Our calcu-lations will be based on conservative worst case inputs for boric acid content and water volumes, and the design specifications will be met for, all operating 'conditions permitted by the tech-nical specifications'he results of these calculations will be presented in the Palo Verde Nuclear Generating Station Units 1, 2
tI 3
FSAR when sub-mitted to the NRC approximately October 1,
1979.
Very truly yours, CU~S ~
E.
E.
Van Brunt, Jr.
APS Vice President Construction Projects ANPP Project Director.
EEVBJr/JMA/dlc cc:
R.
L.
Robb F.
W. Hartley W.
H. Wilson C.
E.
Ferguson D.
B. Karner J.
A. Roedel W.
M. Petro NRC Office of Ins ection