MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23151A7252023-05-31031 May 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23121A0782023-05-0101 May 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23023A2542023-01-23023 January 2023 Site Emergency Plan Implementing Procedure Revision, Includes EPIP-6, Revision 0045, EPIP-7, Revision 0040, & EPIP-12, Revision 0026 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio ML22327A1742022-11-23023 November 2022 Site Emergency Plan Implementing Procedure Revision ML22286A1122022-10-13013 October 2022 Site Emergency Plan Implementing Procedure Revision. Includes EPIP-1, Rev. 63, Emergency Classification Procedure ML22279A9452022-10-0606 October 2022 Site Emergency Plan Implementing Procedure Revision. Includes EPIP-14, Revision 0024, Radiological Control Procedures CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML22166A3952022-06-15015 June 2022 Site Emergency Plan Implementing Procedure Revision CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. CNL-22-050, Brown Ferry, Sequoyah and Watts Bar - Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-04-18018 April 2022 Brown Ferry, Sequoyah and Watts Bar - Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML22083A1692022-03-24024 March 2022 Site Emergency Plan Implementing Procedure Revision CNL-22-031, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-03-22022 March 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML22031A2842022-01-31031 January 2022 Site Emergency Plan Implementing Procedure Revision CNL-21-096, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing2021-12-17017 December 2021 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing CNL-21-088, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 242021-11-12012 November 2021 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 24 CNL-21-087, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revisions2021-11-0303 November 2021 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revisions CNL-21-071, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2021-08-13013 August 2021 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML21006A2102021-01-0707 January 2021 Site Emergency Plan Implementing Procedure Revision CNL-20-086, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-10-15015 October 2020 Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-20-080, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-10-0202 October 2020 Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML20246G8642020-09-0202 September 2020 Site Emergency Plan Implementing Procedure Revision ML20234A4862020-08-21021 August 2020 Site Emergency Plan Implementing Procedure Revision ML20220A6182020-08-0707 August 2020 Site Emergency Plan Implementing Procedure EPIP-1, Revision 60 CNL-20-062, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-07-29029 July 2020 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-20-024, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-02-21021 February 2020 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-20-007, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-01-27027 January 2020 Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML20015A2702020-01-15015 January 2020 Site Emergency Plan Implementing Procedure Revision CNL-20-001, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-01-0909 January 2020 Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML19312A0972019-11-0808 November 2019 Site Emergency Plan Implementing Procedure Revision ML19311C5752019-11-0707 November 2019 Site Emergency Plan Implementing Procedure Revision CNL-19-096, Emergency Plan Implementing Procedure Revisions2019-10-22022 October 2019 Emergency Plan Implementing Procedure Revisions CNL-19-090, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2019-09-24024 September 2019 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML19038A1642019-02-0707 February 2019 Site Emergency Plan Implementing Procedure Revision ML18309A0192018-11-0505 November 2018 Site Emergency Plan Implementing Procedure Revision ML18302A0922018-10-29029 October 2018 Submittal of Site Emergency Plan Implementing Procedure Revision ML18253A0362018-09-10010 September 2018 Site Emergency Plan Implementing Procedure Revision 2024-01-17
[Table view] Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 August 2, 2018 10 CFR 50.4 10 CFR 50.54(q) 10 CFR 50, Appendix E 10 CFR 72.44(f)
ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, 50-296, and 72-052
Subject:
Browns Ferry Nuclear Plant- Site Emergency Plan Implementing Procedure Revision
References:
- 1. Letter from NRC to TVA, "Browns Ferry Nuclear Plant, Units 1, 2, and 3; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054, MF9055, MF9056,MF9057, MF9058, MF9059, and MF9060; EPID L-2017-LLA-0160),"
dated December 22, 2017 [ML17289A032]
- 2. Letter from NRC to TVA, "Browns Ferry Nuclear Plant, Units 1, 2, and 3; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2 - Correction to an Omitted Reference for License Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060; EPID L-2017-LLA-0160)," dated May 29, 2018 [ML18138A452]
In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.54(q); 10 CFR 50, Appendix E; and 10 CFR 72.44(f), the Tennessee Valley Authority (TVA) is submitting a description of changes to the Browns Ferry Nuclear Plant (BFN) Radiological Emergency Plan. The affected documents are the BFN Emergency Plan Implementing Procedures (EPIPs) named below.
U.S. Nuclear Regulatory Commission Page 2 August 2, 2018 EPIP Revision Title Effective Date EPIP-1 0056 Emergency Classification Procedure 07/03/2018 EPIP-2 0037 Notification of Unusual Event 07/03/2018 EPIP-3 0041 Alert 07/03/2018 EPIP-4 0040 Site Area Emergency 07/03/2018 EPIP-5 0054 General Emergency 07/03/2018 Descrii;2tion of Changes and Summa!}'. of Anal~sis EPIP-1, Revision 56, was revised to incorporate both editorial and non-editorial changes. The revision for EPIP-1 incorporates several modifications that included an Emergency Action Level (EAL) scheme change. EPIP-1, Revision 56, proposed rewriting the front matter to align with the TVA Fleet template, NEI 99-01, Revision 6, and NSIR/DPR-ISG-01. Several of the changes being incorporated in this revision received prior approval in Browns Ferry's transition to the Nuclear Energy Institute (NEI) 99-01, Revision 6 classification scheme and were approved by the NRC in letter ML17289A032 issued on December 22, 2017. The first paragraph in Section 1.0 was rewritten to remove the reference to the EAL Upgrade Project, add references to Initiating Condition (IC), and remove "Emergency Plan Classification Logic." The information in Section 2 defining EAL was replaced with defining information for an Initiating Condition (IC). The first entry in Section 2.5 was rewritten to replace information related to an EAL classification scheme with more generic wording that denotes a classification scheme based on ICs. The last sentence of the first paragraph of Section 3.1 was rewritten to include information related to the EALs being referred to as Fission Product Barrier thresholds. Previous EALs were replaced with the NRG-approved EALs based on the Safety Evaluation Report dated May 29, 2018 [ML18138A452]. was replaced with new Attachments 1, 2, and 3, in order to implement the approved version. The definitions and acronyms in Section 5.0 were replaced by NEI 99-01, Revision 6, definitions and acronyms added in Section 6.0. Blank pages were added to allow for insertion of tabs. References and acronyms were updated throughout the procedure. References that are no longer applicable were eliminated. The information in Attachment 2 was revised to be BFN specific and to better align with the guidance provided in NEI 99-01 , Revision 6, including the use of IC as opposed to EAL in some cases. Attachment 1, Emergency Classification Wall Boards, was added to EPIP-1, Revision 56. Several revisions were made to Table H1 on pages 46 and 99 of the procedure. On pages 118, 124, and 134, "Startup" was added to "Operating Mode Applicability" for IC SSS, SAS, and SUS, respectively. In addition to these changes, several editorial changes were made throughout the procedure. These were editorial in nature and did not require performance of a 50.54(q) Reduction in Effectiveness Evaluation.
EPIP-2, Revision 37, was revised to incorporate both editorial and non-editorial changes. All instances of "peer check" were replaced with "peer review." Also the phrase "Emergency Action
U.S. Nuclear Regulatory Commission Page 3 August 2, 2018 Level (EAL)" was replaced with "Initiating Condition (IC)" throughout the procedure when making an emergency classification declaration.
EPI P-3, Revision 41, was revised to incorporate both editorial and non-editorial changes. All instances of "peer check" were replaced with "peer review." A typographical error in the first notes box in Appendix G was corrected, as well. Lastly, the phrase "Emergency Action Level (EAL)" was replaced with "Initiating Condition (IC)" throughout the procedure when making an emergency classification declaration.
EPIP-4, Revision 40, was revised to incorporate both editorial and non-editorial changes. All instances of "peer check" were replaced with "peer review." Also the phrase "Emergency Action Level (EAL)" was replaced with "Initiating Condition (IC)" throughout the procedure when making an emergency classification declaration.
EPIP-5, Revision 54, was revised to incorporate both editorial and non-editorial changes. The phrase "Emergency Action Level (EAL)" was replaced with "Initiating Condition (IC)" throughout the procedure when making an emergency classification declaration. This revision changed the Protective Action Recommendation (PAR) flowchart to make minor editorial changes. The PAR flowchart was also revised to update the definition for Rapidly Progressing Severe Accident (RPSA) to align with the NEI 99-01 EAL scheme which was approved for implementation by the NRC on December 22, 2017 [ML17289A032]. Lastly, the revision implemented many changes to the PAR flowchart that resulted from drill and exercise lessons learned. On page 2 of the flowchart, a note was added for Protective Action Guide exceedance beyond 10 miles. The note states "If actual or projected dose at or beyond 10 miles exceed Table 1 limits, refer to CECC EPIP-1 to determine necessary PAR upgrade." This is annotated as Note 10. The note ensures that the Ingestion Exposure Pathway is appropriately considered for protective action recommendations. Reference to this note was added to the continuous assessment block since it is applicable at all times and should be considered regardless of what flow path is being evaluated.
"See Note 9" (previously Note 7) was also added to the logic block for determining whether the site specific time has elapsed since the 2 mile radius evacuation commenced. The note was not previously referenced on the left side of the chart but should still be considered if there is a short term release. This revision also removed"~ 20% clad damage (see Note 3)" and Note 3 from the PAR flowchart. This continuous assessment item would never result in a different PAR without some other change in conditions. Note 3 is only referenced in that bullet and is no longer needed if the continuous assessment bullet is deleted. The wording "hostile action event occurs" was added to address the protective actions that would be needed if a hostile action occurs while an event is already in progress. The two bullets related to the state providing information that the impediments no longer exist were combined. If impediments no longer exist, both flowpaths should be evaluated. This change eliminates the reference to whether a release is in progress. All logic blocks that state "Does the current wind direction affect new downwind sectors?" were removed and the two logic blocks that state "Has site specific time elapsed since 2 mi radius evacuation commenced?" were combined. In addition, the extra Recommendation 3 block was removed since it will no longer be needed. The notes were renumbered so that there is no confusion between the notes on the initial assessment side and those on the continuous assessment side. Lastly, Notes 4
U.S. Nuclear Regulatory Commission Page 4 August 2, 2018 and 5 which defined RPSA were deleted. These notes are not needed based on the wording of the RPSA logic block.
There are no new regulatory commitments in this letter. If you have any questions regarding this submittal , please contact B. F. Tidwell at (256)729-3666.
D. L. Hughes Vice President cc: