Letter Sequence Request |
---|
EPID:L-2018-LLA-0108, Written Communication as Specified by 10 CFR 50.4(b)(l) Requesting U.S. Nuclear Regulatory Commission Approval to Revise the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 10 CFR 50.90 (Approved, Closed) |
|
|
|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARNL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report NL-24-0031, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R23 NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0584, Preservice Inspection Program Owners Activity Report2023-07-10010 July 2023 Preservice Inspection Program Owners Activity Report NL-23-0541, Inservice Inspection Program Owner’S Activity Report for Outage 1R242023-06-28028 June 2023 Inservice Inspection Program Owner’S Activity Report for Outage 1R24 NL-22-0778, Refueling Outage 2R22 Steam Generator Tube Inspection Report2022-09-30030 September 2022 Refueling Outage 2R22 Steam Generator Tube Inspection Report NL-22-0512, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R222022-07-0101 July 2022 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R22 ML22180A2612022-06-29029 June 2022 Proposed Inservice Testing Alterative ALT-VR-01 ND-22-0253, Submittal of Preservice Test Plan - Version 4.02022-04-0707 April 2022 Submittal of Preservice Test Plan - Version 4.0 ND-22-0254, Submittal of Inservice Testing Program Plan - 1st Interval, Version 2.02022-04-0707 April 2022 Submittal of Inservice Testing Program Plan - 1st Interval, Version 2.0 NL-22-0227, Refueling Outage 1R23 Steam Generator Tube Inspection Report2022-04-0101 April 2022 Refueling Outage 1R23 Steam Generator Tube Inspection Report NL-21-1130, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R232022-01-0303 January 2022 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R23 NL-21-0767, Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the 4th 10-Year Inservice Inspection Internal (VEGP-ISI-ALT-04-05, Version 1.0)2021-09-10010 September 2021 Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the 4th 10-Year Inservice Inspection Internal (VEGP-ISI-ALT-04-05, Version 1.0) NL-21-0381, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R212021-04-26026 April 2021 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R21 NL-20-1329, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1 R222020-11-23023 November 2020 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1 R22 NL-20-1312, Response to Request for Additional Information Related to Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.02020-11-23023 November 2020 Response to Request for Additional Information Related to Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.0 NL-20-1086, Refueling Outage 1R22 Steam Generator Tube Inspection Report2020-09-17017 September 2020 Refueling Outage 1R22 Steam Generator Tube Inspection Report NL-20-1011, Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.02020-09-0909 September 2020 Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.0 ND-20-0645, Submittal of Preservice Test Plan - Version 3.02020-06-0303 June 2020 Submittal of Preservice Test Plan - Version 3.0 ND-20-0601, Submittal of Inservice Testing Program Plan - 1st Interval2020-05-21021 May 2020 Submittal of Inservice Testing Program Plan - 1st Interval ND-19-1416, Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report2019-12-0909 December 2019 Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report NL-19-1094, Refueling Outage 2R20 Steam Generator Tube Inspection Report2019-09-10010 September 2019 Refueling Outage 2R20 Steam Generator Tube Inspection Report ND-19-0747, Preservice Test Plan, Version 2.02019-07-24024 July 2019 Preservice Test Plan, Version 2.0 NL-19-0712, Submittal of Inservice Inspection Program Owner'S Activity Report for Outage 2R202019-06-26026 June 2019 Submittal of Inservice Inspection Program Owner'S Activity Report for Outage 2R20 NL-19-0204, R21 Steam Generator Tube Inspection Report2019-03-21021 March 2019 R21 Steam Generator Tube Inspection Report NL-18-1571, Proposed ISI Alternative VEGP-ISI-ALT-19-01 for Tendon Inservice Inspection Extension2019-02-18018 February 2019 Proposed ISI Alternative VEGP-ISI-ALT-19-01 for Tendon Inservice Inspection Extension NL-18-1565, Inservice Inspection Program Owner'S Activity Report for Outage 1R212019-01-0303 January 2019 Inservice Inspection Program Owner'S Activity Report for Outage 1R21 ND-18-1504, Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report2018-12-0707 December 2018 Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report ND-18-1401, Request for Alternative: Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Alt-01)2018-11-29029 November 2018 Request for Alternative: Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Alt-01) ND-18-1185, Request for Alternative: Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds (VEGP 3&4-PSI/ISI-ALT-06)2018-10-19019 October 2018 Request for Alternative: Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds (VEGP 3&4-PSI/ISI-ALT-06) ND-18-1014, Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4 - PSI/ISI-ALT-10)2018-07-26026 July 2018 Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4 - PSI/ISI-ALT-10) NL-17-2128, Inservice Inspection Program Owner'S Activity Report for Outage 2R192017-12-21021 December 2017 Inservice Inspection Program Owner'S Activity Report for Outage 2R19 NL-17-1197, Fourth Ten-Year Interval Lnservice Testing Program Update2017-10-23023 October 2017 Fourth Ten-Year Interval Lnservice Testing Program Update NL-17-1641, Submittal of 1R20 Steam Generator Tube Inspection Report2017-09-27027 September 2017 Submittal of 1R20 Steam Generator Tube Inspection Report NL-17-1157, Transmittal of 1R20 ISI Report Summary2017-06-30030 June 2017 Transmittal of 1R20 ISI Report Summary NL-17-0659, Response to Request for Additional Information Re VEGP-ISI-ALT-13 Category B-N-2 and B-N-3 Examination Extension from 10 to 20 Years2017-04-20020 April 2017 Response to Request for Additional Information Re VEGP-ISI-ALT-13 Category B-N-2 and B-N-3 Examination Extension from 10 to 20 Years NL-17-0101, Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule2017-01-26026 January 2017 Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule NL-16-1609, Refueling Outage 2R18 Steam Generator Tube Inspection Report2016-09-13013 September 2016 Refueling Outage 2R18 Steam Generator Tube Inspection Report NL-16-1329, Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.02016-08-0404 August 2016 Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.0 NL-16-1242, Submittal of the Inservice Testing Program Relief Request and Alternatives for Pumps and Valves - Fourth Ten-Year Interval2016-07-28028 July 2016 Submittal of the Inservice Testing Program Relief Request and Alternatives for Pumps and Valves - Fourth Ten-Year Interval NL-16-0927, 2R18 Lnservice Inspection Report Summary2016-06-27027 June 2016 2R18 Lnservice Inspection Report Summary NL-16-0081, Submittal of 1R19 Inservice Inspection Report Summary2016-01-20020 January 2016 Submittal of 1R19 Inservice Inspection Report Summary NL-15-0058, 2R17 Inservice Inspection Report Summary2015-01-12012 January 2015 2R17 Inservice Inspection Report Summary NL-14-1276, Snubber Inspection Plan Submittal in Accordance with ASME OM Code2014-10-31031 October 2014 Snubber Inspection Plan Submittal in Accordance with ASME OM Code NL-14-1081, R18 Inservice Inspection Report Summary2014-07-11011 July 2014 R18 Inservice Inspection Report Summary NL-13-2036, Sixteenth Maintenance / Refueling Outage Steam Generator Tube Inspection Report2013-09-26026 September 2013 Sixteenth Maintenance / Refueling Outage Steam Generator Tube Inspection Report ML13184A2692013-07-0202 July 2013 R16 Inservice Inspection Report Summary NL-13-0090, 1R17 Inservice Inspection Report Summary2013-01-16016 January 2013 1R17 Inservice Inspection Report Summary 2024-07-03
[Table view] Category:Letter type:ND
MONTHYEARND-24-0103, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2024-04-26026 April 2024 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-24-0114, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-04-0101 April 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-24-0046, (Vegp), Unit 3, Condition Prohibited by Technical Specification Limiting Condition of Operation 3.1.6 Control Bank Overlap Limits Exceeded Due to Inadequate Procedure Guidance2024-03-18018 March 2024 (Vegp), Unit 3, Condition Prohibited by Technical Specification Limiting Condition of Operation 3.1.6 Control Bank Overlap Limits Exceeded Due to Inadequate Procedure Guidance ND-24-0059, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-03-0404 March 2024 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0693, Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests2024-02-15015 February 2024 Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests ND-23-0690, Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests2024-02-0808 February 2024 Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests ND-24-0019, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-02-0101 February 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0912, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-01-0202 January 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0881, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-12-0404 December 2023 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0817, Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2023-11-17017 November 2023 Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ND-23-0823, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-11-0303 November 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0723, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-10-0404 October 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0697, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-09-0505 September 2023 Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0669, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-08-0707 August 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0205, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0609, Notification of Completion of All ITAAC2023-07-20020 July 2023 Notification of Completion of All ITAAC ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0439, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) 2024-04-26
[Table view] |
Text
Southern Nuclear Operating Company, Inc.
3535 Colonnade Parkway Birmingham, AL 35243 July 26, 2018 Docket Nos.: 52-025 ND-18-1014 52-026 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Request for Alternative:
Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4- PSI/ISI-ALT-10)
Ladies and Gentlemen:
Pursuant to 10 CFR 50.55a(z)(1), Southern Nuclear Operating Company (SNC) hereby requests NRC authorization to use an alternative to the requirements of ASME Section III, NB-4424.2 (a),
of the ASME Boiler and Pressure Vessel (B&PV) Code, 1998 Edition through the 2000 Addenda (code of record) for Vogtle Electric Generating Plant (VEGP) Units 3 and 4. The proposed request for alternative is applicable to distance requirements to maintain surface finish condition from the edge of a weld crown.
The details of the 10 CFR 50.55a(z)(1) request are contained in Enclosure 1 to this letter.
Approval is requested by January 21, 2019 to support performance of preservice inspection activities prior to the Class 1 hydrostatic test.
This letter contains no regulatory commitments. This letter has been reviewed and confirmed to contain no security-related information. Should you have any questions, please contact Mr. Corey Thomas at (205) 992-5221.
U.S. Nuclear Regulatory Commission ND-18-1014 Page 2 of4 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 26th day of July 2018.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY
~J;. ~
Amy G. Aughtman Licensing Director, Nuclear Development Southern Nuclear Operating Company AGA/BCT/Ijs : Proposed Alternative VEGP 3&4-PSI/ISI-ALT-10 in Accordance with 10 CFR 50.55a(z)(1)- Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements
U.S. Nuclear Regulatory Commission ND-18-1014 Page 3 of 4 cc:
Southern Nuclear Operating Company / Georgia Power Company Mr. S. E. Kuczynski (w/o enclosure)
Mr. D. G. Bost (w/o enclosure)
Mr. M. D. Meier (w/o enclosure)
Mr. D. H. Jones (w/o enclosure)
Mr. J. B. Klecha Mr. G. Chick Mr. D. L. McKinney (w/o enclosure)
Mr. T. W. Yelverton (w/o enclosure)
Mr. B. H. Whitley Ms. C. A. Gayheart Mr. C. R. Pierce Ms. A. G. Aughtman Mr. D. L. Fulton Mr. M. J. Yox Mr. E. W. Rasmussen Mr. J. Tupik Mr. W. A. Sparkman Ms. A. C. Chamberlain Ms. A. L. Pugh Document Services RTYPE: VND.LI.L00 File AR.01.02.06 Nuclear Regulatory Commission Mr. W. Jones (w/o enclosure)
Ms. J. Dixon-Herrity Mr. C. Patel Ms. J. M. Heisserer Mr. B. Kemker Mr. G. Khouri Ms. S. Temple Mr. F. Brown Mr. T.E. Chandler Ms. P. Braxton Mr. T. Brimfield Mr. C. J. Even Mr. A. Lerch State of Georgia Mr. R. Dunn
U.S. Nuclear Regulatory Commission ND-18-1014 Page 4 of 4 Oglethorpe Power Corporation Mr. M. W. Price Ms. A. Whaley Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Mr. L. Oriani (w/o enclosure)
Mr. C. Churchman (w/o enclosure)
Mr. M. Corletti Mr. M. L. Clyde Ms. L. Iller Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham Mr. R. Grumbir, APOG NDDocumentinBox@duke-energy.com, Duke Energy Mr. S. Franzone, Florida Power & Light
Southern Nuclear Operating Company ND-18-1014 Enclosure 1 Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Proposed Alternative VEGP 3&4-PSI/ISI-ALT-10 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (Enclosure consists of 4 pages, not including this cover page.)
ND-18-1014 Proposed Alternative VEGP 3&4-PSI/ISI-ALT-10 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements Plant Site-Vogtle Electric Generating Plant (VEGP) - Units 3 and 4 Unit:
Interval-Applies to construction and preservice inspection intervals.
Interval Dates:
Requested Date for Approval is requested by 1/21/19 to support performance of preservice inspection activities prior to the Class 1 hydrostatic test.
Approval:
ASME Code Components ASME Class 1 Piping and Components Affected:
Applicable Code Edition ASME B&PV Code,Section III, 1998 Edition through the 2000 Addenda (code of record).
and Addenda:
ASME Section III NB-4424.2 (a) requires that the surface finish shall be 6.3 Ra or better for a distance of at least 2t (where t equals nominal wall Applicable thickness) plus 4 in., or 6 in., whichever is greater (Fig. NB-4250-2 or Code Fig. NB-4250-3), from the edge of the weld crown on at least one side of Requirements: the weld where an ultrasonic examination is required.
As noted in Fig. NB-4250-2 and NB-4250-3, this distance is required to be free of interferences.
1
ND-18-1014 Proposed Alternative VEGP 3&4-PSI/ISI-ALT-10 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements The requirements for surface finish, surface finish distance, and distance for which any hanger or attachment (or any other interference) can be made, is required to be 2t (where t equals nominal wall thickness) plus 4 inches, or 6 inches, whichever is greater as described in ASME Section III NB-4424.2(a) and shown in ASME Section III NB-4250-2 for ultrasonic examinations.
VEGP Units 3&4 contain interferences where these requirements cannot be met. Figure 1 is an ASME Fig. NB-4250-2 excerpt which illustrates the interference requirement.
Figure 1: ASME Section III Figure NB-4250-2 Excerpt Reason for Request:
The purpose of this distance requirement is to assure the examination area is adequate to perform a volumetric examination from the outside diameter (OD) for component-to-pipe and pipe-to-pipe welds.
Other examination configurations exist that would allow an adequate examination in accordance with ASME Section XI. One specific example is instrumentation bosses, near the AP1000 Steam Generator Hot Leg Safe End-to-Pipe welds, which are within the distance required in ASME Section III NB-4424.2 (Shown in Figure NB-4250-2). Figure 2 shows the example configuration and the method used to verify that the ASME coverage requirements are met with an interference in place.
2
ND-18-1014 Proposed Alternative VEGP 3&4-PSI/ISI-ALT-10 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements Figure 2: Method Utilized to Conclude Essentially 100% of the ASME Section XI Volume is Examined for the Steam Generator Hot Leg Safe End-to-Pipe welds.
Proposed Alternative:
For cases in which there is less than the distance of 2t plus 4 in. or 6 in.,
whichever is greater, an inspectability evaluation will be conducted to ensure that adequate examinations can be performed. The inspectability report will document the percent coverage that can be obtained from the applicable examination area (i.e., ID, OD, or both) and conclude that essentially 100% of the ASME Section XI inspection volume is obtained. This will establish the Proposed method for future inservice inspections.
Alternative For configurations that do not meet those described in NB-4424.2(a) and and Basis shown in Figure NB-4250-2 and Figure NB-4250-3:
for Use:
(a) The requirements of Figure NB-4250-1 shall be met.
(b) The Owners Design Specification shall describe the configuration and surface finish required for preservice inspection in lieu of the configuration shown in Figure NB-4250-2 or Figure NB-4250-3 and surface finish described in NB-4424.2(a).
(c) The Certificate Holder (with agreement of the Owner or Owner Designee) shall verify and document that the required preservice inspection can be performed with the proposed configuration and surface finish.
3
ND-18-1014 Proposed Alternative VEGP 3&4-PSI/ISI-ALT-10 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (d) Use of this alternative shall be documented in the applicable VEGP Units 3 and 4 Design Specifications and N-5 Data Reports.
Basis for Use:
For volumetric examination surface configurations that do not meet NB-4424.2(a), which reference Fig. NB-4250-2 and NB-4250-3, an inspectability evaluation is performed and documented to ensure that essentially 100% of the ASME Section XI volumetric examination coverage is obtained. If essentially 100% volumetric examination coverage is not obtained, this alternative shall not apply.
The proposed alternative ensures that essentially 100% of the ASME Section XI preservice inspection volume is obtained and future inservice inspection coverage requirements will be met; therefore, this proposed alternative provides an acceptable level of quality and safety in accordance with 10 CFR 50.55a(z)(1).
Duration of Proposed Until the 10 CFR Part 52.103(g) finding Alternative:
Reference:
None Status: Awaiting NRC authorization 4