1 Hematite 1
Decommissioning, Project 1
1 Procedur~: HDP-PR-FSS-701, Final Status Survey Plan Development Westinghouse Non-Proprietary Class 3 APPENDIX P-6 FSS FIELD LOG Revision: 4 Appendix P-6, Page 1 of 2 Survey Area:!
LSA 03 1
==
Description:==
Plant Soils Open Land Area (West)
Survey Unit: 1 02
==
Description:==
Adjacent to South Site Pond/ North Site Creek
("Area 5")
i 1
i Date/Time:
10/13/15 10/14/15 Quality Record Observation or Comment:
Technician Prior to coinmencing a GWS in LSA 03-02 a task-specific safety briefwas Jahmai performed by the FSS Supervisor. The FSS personnel performed a quality Williams walk-down. Background Ievels were measured at lOK-10.5K gcpm. Weather
-7"',. _,/'
conditions were sunny, warm, and dry at 73 °F. Commenced a GWS ofLSA r"J~~
03-02 at 0828 and secured at 1210. FSS personnel returned to the office to process <lata and perform instrument post-checks.
GWS files generated:
LSA _03 _ 02 _ 101315 _D _JW LSA_ 03 _ 02 _101315 _ Q_ CC Prior to continuing a GWS and commencing the systematic soil sampling of Jahmai LSA 03-02 a task-specific safety briefwas performed by the FSS Supervisor.
Williams The FSS personnel performed a quality walk-down. Background Ievels were _ -r /. d measured at 9.5K-lOK gcpm. Weather conditions were sunny, warm, and r V~
dry at 73 °F. The GWS was commenced at 1647 and secured at 1729.
Systematic soil sampling was commenced at 1515 and secured at 1725. FSS personnel returned to the office to process <lata, perform instrument post-check, and prepare samples for shipment.
GWS files generated:
LSA_03_02_101415_D_JW Sample IDs:
L03-02-0l-P-S-S-00, L03-02-02-P-R-S-OO, L03-02-03-P-E-S-00, L03-02-04-P-S-S-OO, L03-02-05-P-R-S-OO, L03-02-06-P-E-S-OO, L03-02-07-P-S-S-OO, L03-02-08-P-R-S-OO, L03-02-09-P-E-S-OO
Hematite Decommissioning Project 1
1 1'
'1 Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Westinghouse Non-Proprietary Class 3 APPENDIX P-6 FSS FIELD LOG Revision: 4 Appendix P-6, Page 2 of2 Survey Area:
LSA 03
==
Description:==
Plaot Soils Open Laod Area (West)
Survey U nit:
02
==
Description:==
Adjacent to South Site Pond/ North Site Creek
("Area 5")
Date/Time:
10/15/15 10/19/15 Quality Recod i
Observation or Comment:
Tecbnician Prior to coritinuing the systJmatic soil sampling ofLSA 03-02 a task-specific Jahmai safety briefwas performed h the FSS Supervisor. The FSS personnel Williams performed a quality walk-down. Weather conditions were cloudy aod warm at_
,/
, /
80°F. Systematic soil sampling was commenced at 0835 and secured at 1230r~..., / -~ '
- FSS personnel returned to the office to prepare the samples for shipment.
SampleIDs:
L03-02-10-:P-S-S-OO, L03-Q2-11-P-R-S-OO, L03-12-03-P-E-S-OO, L03-02-l3CP-S-S-OO, L03-02-14-P-R-S-OO, L03-02-15-P-E-S-OO, L03-02-l 6'P-S-S-OO, L03-02-17-P-R-S-OO, L03-02-18-P-E-S-OO, L03-02-19,P-S-S-OO, L03-02-20-P-R-S-OO, L03-02-2 l -P-E-S-OO, L03-02-22'P-S-S-OO L03-02-23-P-R-S-00 L03-02-24-P-E-S-OO Prior to commencing the biased soil sampling ofLSA 03-02 a task-specific safety brief was performed by the FS S Supervisor. The FS S personnel performed a quality walk-down. Weather conditions were sunny aod warm at 73°F. Biased soil sampling was commenced at 1535 and completed at 1545.
FSS personnel returned to the office to prepare the samples for shipment.
SampleIDs:
L03-02-25-P-S-B-OO, L03-02-26-P-S-B-OO Matt Cushman