Westinghouse Hematite Decommissioning Project - Request for NRC Review of Final Status Survey Final Report Volume 3, Chapter 23, Survey Area Release Record for Land Survey Area 03, Survey Units 01 and 02, LSA 03-02 App P-6
ML18205A436
Person / Time
Site: 07000036
Issue date: 05/15/2017
From:
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards
References
HEM-17-35
Download: ML18205A436 (2)


Text

1 Hematite 1

Decommissioning, Project 1

1 Procedur~: HDP-PR-FSS-701, Final Status Survey Plan Development Westinghouse Non-Proprietary Class 3 APPENDIX P-6 FSS FIELD LOG Revision: 4 Appendix P-6, Page 1 of 2 Survey Area:!

LSA 03 1

==

Description:==

Plant Soils Open Land Area (West)

Survey Unit: 1 02

==

Description:==

Adjacent to South Site Pond/ North Site Creek

("Area 5")

i 1

i Date/Time:

10/13/15 10/14/15 Quality Record Observation or Comment:

Technician Prior to coinmencing a GWS in LSA 03-02 a task-specific safety briefwas Jahmai performed by the FSS Supervisor. The FSS personnel performed a quality Williams walk-down. Background Ievels were measured at lOK-10.5K gcpm. Weather

-7"',. _,/'

conditions were sunny, warm, and dry at 73 °F. Commenced a GWS ofLSA r"J~~

03-02 at 0828 and secured at 1210. FSS personnel returned to the office to process <lata and perform instrument post-checks.

GWS files generated:

LSA _03 _ 02 _ 101315 _D _JW LSA_ 03 _ 02 _101315 _ Q_ CC Prior to continuing a GWS and commencing the systematic soil sampling of Jahmai LSA 03-02 a task-specific safety briefwas performed by the FSS Supervisor.

Williams The FSS personnel performed a quality walk-down. Background Ievels were _ -r /. d measured at 9.5K-lOK gcpm. Weather conditions were sunny, warm, and r V~

dry at 73 °F. The GWS was commenced at 1647 and secured at 1729.

Systematic soil sampling was commenced at 1515 and secured at 1725. FSS personnel returned to the office to process <lata, perform instrument post-check, and prepare samples for shipment.

GWS files generated:

LSA_03_02_101415_D_JW Sample IDs:

L03-02-0l-P-S-S-00, L03-02-02-P-R-S-OO, L03-02-03-P-E-S-00, L03-02-04-P-S-S-OO, L03-02-05-P-R-S-OO, L03-02-06-P-E-S-OO, L03-02-07-P-S-S-OO, L03-02-08-P-R-S-OO, L03-02-09-P-E-S-OO

Hematite Decommissioning Project 1

1 1'

'1 Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Westinghouse Non-Proprietary Class 3 APPENDIX P-6 FSS FIELD LOG Revision: 4 Appendix P-6, Page 2 of2 Survey Area:

LSA 03

==

Description:==

Plaot Soils Open Laod Area (West)

Survey U nit:

02

==

Description:==

Adjacent to South Site Pond/ North Site Creek

("Area 5")

Date/Time:

10/15/15 10/19/15 Quality Recod i

Observation or Comment:

Tecbnician Prior to coritinuing the systJmatic soil sampling ofLSA 03-02 a task-specific Jahmai safety briefwas performed h the FSS Supervisor. The FSS personnel Williams performed a quality walk-down. Weather conditions were cloudy aod warm at_

,/

, /

80°F. Systematic soil sampling was commenced at 0835 and secured at 1230r~..., / -~ '

  • FSS personnel returned to the office to prepare the samples for shipment.

SampleIDs:

L03-02-10-:P-S-S-OO, L03-Q2-11-P-R-S-OO, L03-12-03-P-E-S-OO, L03-02-l3CP-S-S-OO, L03-02-14-P-R-S-OO, L03-02-15-P-E-S-OO, L03-02-l 6'P-S-S-OO, L03-02-17-P-R-S-OO, L03-02-18-P-E-S-OO, L03-02-19,P-S-S-OO, L03-02-20-P-R-S-OO, L03-02-2 l -P-E-S-OO, L03-02-22'P-S-S-OO L03-02-23-P-R-S-00 L03-02-24-P-E-S-OO Prior to commencing the biased soil sampling ofLSA 03-02 a task-specific safety brief was performed by the FS S Supervisor. The FS S personnel performed a quality walk-down. Weather conditions were sunny aod warm at 73°F. Biased soil sampling was commenced at 1535 and completed at 1545.

FSS personnel returned to the office to prepare the samples for shipment.

SampleIDs:

L03-02-25-P-S-B-OO, L03-02-26-P-S-B-OO Matt Cushman