Hernatite
~
Decomrnissionin Project Survey Area Survey U nit:
Date/Time:
09/30/15 10/05/15 10/06/15 Quality Reco)d 1 :
1 1
Procedure: HDP-PR-FSS-701, Final Status Survey Plan Developrnent Westinghouse Non-Proprietary C!ass 3 Revision: 4 Appendix P-6, Page 1 of2 LSA03 01 APPENDIX P-6 FSS FIELD LOG
==
Description:==
==
Description:==
Observation or Comment:
Plant Soils Open Laud Area (West)
West Open Laud Area ("Area 5")
Technician Prior to commencing a GWS in LSA 03-01 a task-sJ?ecific safety briefwas Jahmai perfonned bythe FSS Supervisor. Before commencmg the GWS the FSS Williams personnel performed a quality walk-down. Backgronnd Ievels were measured
,-;r /
at 8.5K-9.5K gcpm. Weather conditions were partly cloudy aud cool at 69 r '-"...., -
~F. Commenced a GWS ofLSA 03-01 at 1521and secured at 1629. FSS personnel returned to the office to process <lata aud perform instrument post-checks.
GWS files generated:
LSA 03 01 093015 D JW Priorto resuming a GWS ofLSA 03-01 a task-specific safety briefwas Jahmai performed by the FSS Supervisor. Before commencing the GWS the FSS Williams personnel performed a quality walk-down. Background Ievels were measured ~
,. ~,,
at 9K - 1 OK gcpm. Weather conditions were partly cloudy aud cool dry at 69
~
~F. At 0921 the GWS was initiated aud secured at 1128 for end ofmorning shift. The GWS was recommenced at 1358 aud secured at 1605. FSS personnel returned to the office to process data and perform instrument post-checks.
GWS files generated:
LSA_03_01_l00515_D2_JW LSA_03_01_1005l5_D2_JW LSA_03_01_100515_Q_CC LSA_03_01_100515_Q3_CC LSA_03_01_100515_P _MS Prior to continuing a GWS in LSA 03-01 a task-specific safety briefwas Jahmai performed by the FSS Supervisor. Before commencing the GWS the FSS Williams personnel performed a quality walk-down. Background Ievels were measured _
- ef -:;-.--~.
at 8.5K-9.5K gross cpm. Weather conditions were partly clondy aud warm a{..__/~~
75 °F. Commenced a GWS ofLSA 03-01 at 0921aud secured at 1046. FSS personnel returned to the office to process dala aud perform instrument post-checks.
GWS files generated:
, 1
[
Hematite Decommissioning Project Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Westinghouse Non-Proprietary Class 3 APPENDIX P-6 FSS FIELD LOG Revision: 4 Appendix P-6, Page 2 of2 Snrvey Area:
LSA 03
==
Description:==
Plant Soils Open Land Area (West)
Survey Unit:
==
Description:==
West Open Land Area ("Area 5")
Date/Time:
10/08/15 10/09/15 1
1 1
1 1
1 1
1 1
Quality RecoL 1
Observation or Comment:
Technician Prior to commencing the systematic sampling ofLSA 03-01 a task-specific Jahmai safety briefwas performed by the FSS Supervisor. The FSS personnel
~
performed a quality walk-down. Weather conditions were cloudy and warm at~.
82°F. Commenced the systematic sampling of03-0l at 0925 and secured at 1115 for end of moming shift. Sampling was resumed at 1340 and completed at 1615. FSS personnel exited LSA 03-01 to prepare the samples for shipment.
Prior to commencing the biased sampling ofLSA 03-01 a task-specific safety Jahmai briefwas performed by the FSS SuJ?ervisor. The FSS personnel performed a Williams quality walk-down. Weather condit10ns were cloudy and cool at 68°F. The ~ -7' /. ~
bias sample was collected at 1110. FSS personnel exited LSA 03-01 to
( \\./~
prepare the sample for shipment.
SampleID:
L03-01-25-P-S-B-OO