SMR DC RAI - Request for Additional Information No. 429 Erai No. 9396 (18.1)
ML18204A192
Person / Time
Site: NuScale
Issue date: 07/23/2018
From:
NRC
To:
NRC/NRO/DLSE/LB1
References
Download: ML18204A192 (3)


Text

NuScaleDCRaisPEm Resource From: Cranston, Gregory Sent: Monday, July 23, 2018 9:27 AM To: NuScaleDCRaisPEm Resource Cc: Chowdhury, Prosanta

Subject:

Request for Additional Information No. 429 eRAI No. 9396 (18.1)

Attachments: Request for Additional Information No. 429 (eRAI No. 9396).pdf Attached please find NRC staffs request for additional information (RAI) concerning review of the NuScale Design Certification Application.

Please submit your technically correct and complete response within 60 days of the date of this RAI to the NRC Document Control Desk.

If you have any questions, please contact me.

Thank you.

Gregory Cranston, Senior Project Manager Licensing Branch 1 (NuScale)

Division of New Reactor Licensing Office of New Reactors U.S. Nuclear Regulatory Commission 301-415-0546 1

Hearing Identifier: NuScale_SMR_DC_RAI_Public Email Number: 530 Mail Envelope Properties (BN1PR09MB0258038CC864FE8C3B8C8E7C90560)

Subject:

Request for Additional Information No. 429 eRAI No. 9396 (18.1)

Sent Date: 7/23/2018 9:26:39 AM Received Date: 7/23/2018 9:26:43 AM From: Cranston, Gregory Created By: Gregory.Cranston@nrc.gov Recipients:

"Chowdhury, Prosanta" <Prosanta.Chowdhury@nrc.gov>

Tracking Status: None "NuScaleDCRaisPEm Resource" <NuScaleDCRaisPEm.Resource@nrc.gov>

Tracking Status: None Post Office: BN1PR09MB0258.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 566 7/23/2018 9:26:43 AM Request for Additional Information No. 429 (eRAI No. 9396).pdf 87356 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Request for Additional Information No. 429 (eRAI No. 9396)

Issue Date: 04/23/2018 Application

Title:

NuScale Standard Design Certification 048 Operating Company: NuScale Power, LLC Docket No.52-048 Review Section: 18 - Human Factors Engineering Application Section: 18 QUESTIONS 18-44 Title 10 of the Code of Federal Regulations (10CFR) Section 52.47(a)(8) requires an applicant for a design certification to provide a final safety analysis report (FSAR) that must include the information necessary to demonstrate compliance with any technically relevant portions of the Three Mile Island requirements set forth in 10 CFR 50.34(f), except paragraphs (f)(1)(xii), (f)(2)(ix), and (f)(3)(v). Section 10 CFR 50.34(f)(2)(iii) requires an applicant to "Provide, for Commission review, a control room design that reflects state-of-the-art human factor principles prior to committing to fabrication or revision of fabricated control room panels and layouts. Chapter 18, Human Factors Engineering, of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, and NUREG-0711, "Human Factors Engineering Program Review Model, identify criteria the staff uses to evaluate whether an applicant meets the regulation. The applicant stated in the FSAR, Tier 2, Section 18.0, "Human Factors Engineering - Overview," that its human factors engineering (HFE) program incorporates accepted HFE standards and guidelines including the applicable guidance provided in NUREG-0711, Revision 3.

NUREG-0711, Section 11.4.3.3, Validation Testbeds, Criterion 9 states, The applicant should verify the conformance of the testbed to the testbed-required characteristics before validation tests are conducted. NuScale provided the veification and validation (V&V) implementation plan (IP) for review. The staffed reviewed the V&V IP. In Section 4.3.9 the applicant states, The testbed is verified to conform with the required characteristics before validation tests are conducted. However, no further information is provided. As part of an audit of documents in NuScales electronic reading room, the staff had the opportunity to review an Integrated Systems Validation Test Plan. In sections 9.2 and 9.3 of this document, the applicant provides more information regarding the methods used to verify the conformance of the testbed to the testbed-required characteristics. Please either update theV&V IP to include this information or reference sections 9.2 and 9.3 of the Integrated Systems Validation Test Plan." If referencing ISV test plan, pleaswe indicate revision number.