ML18192C068
| ML18192C068 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/11/2018 |
| From: | Arizona Public Service Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 10.1-9 | |
| Download: ML18192C068 (1) | |
Text
PVNGS-1,2&3 ER COOLING SYSTEM ALTERNATIVES Table 10.1-9 BASIC TABULATION TO BE USED IN COMPARING ALTERNATIVE PLANT SYSTEMS (Sheet 4 of 7)
Alternatives Rectangular Mechanical Draft Cooling Tower System Round Mechanical Draft Cooling Tower System Wet-Dry Mechanical Draft Cooling Tower System Fan-Assisted Natural Draft Cooling Tower System Environmental Costs Units Magnitude Reference Magnitude Reference Magnitude Reference Magnitu de Reference 4.2 Construction activi-ties (including site preparation) 4.2.1 People (amenities)
Population and public facilities within a 5 mile radius of the site Population (1980)
Hospitals Schools Cooling system con-struction period (per unit) 337 0
0 21 mo Fig. 2.2-4 10.1.4.5.2.1 337 0
0 14 mo Fig. 2.2-4 10
~ 1 ~ 4.5.2.1 337 0
0 35 mo.
Fig. 2.2-4 10
~ 1 ~ 4.5.2.1 337 0
0 21 mo Fig. 2.2-4 10.1.4.5.2.1 4.2.2 People (accessibility of historical sites)
Historic properties within plant site 10.1.4.5.2.2 2.3 10.1.4.5.2.2 0
10.1.4.5.2.2 10.1.4.5.2.2 4.2.3 People (accessibility of archaeolo-gical sites)
Statement Any significant archaeological resources in area of cooling system will be mapped and investigated prior to construction 10.1.4.5.2.2 Same as for selected system 10.1.4.5.2.2 Same as for selected system 10.1.4.5.2.2 Same as for selected system 10.1.4.5.2.2 4.2.4 Wildlife Vegetation types affected Associated animal species Saltbush plain See 2.7 10.1.4.5.2.3 Saltbush plain See 2.7 10.1.4.5.2.3 Saltbush plain mesquite wash See 2.7 10.1.4.5.2.3 Saltbush plain See 2.7 10.1.4.5.2.3 10.1-37/10.1-38 (Blank)