ML18192C068
ML18192C068 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 07/11/2018 |
From: | Arizona Public Service Co |
To: | Office of Nuclear Reactor Regulation |
References | |
10.1-9 | |
Download: ML18192C068 (1) | |
Text
PVNGS-1,2&3 ER COOLING SYSTEM ALTERNATIVES Table 10.1-9 BASIC TABULATION TO BE USED IN COMPARING ALTERNATIVE PLANT SYSTEMS (Sheet 4 of 7)
Alternatives Rectangular Mechanical Draft Round Mechanical Draft Wet-Dry Mechanical Draft Fan-Assisted Natural Draft Cooling Tower System Cooling Tower System Cooling Tower System Cooling Tower System Environmental Costs Units Magnitude Reference Magnitude Reference Magnitude Reference Magnitu de Reference 4.2 Construction activi-ties (including site preparation) 4.2.1 People Population and public (amenities) facilities within a 5 mile radius of the site Population (1980) Fig. 2.2-4 337 337 Fig. 2.2-4 337 Fig. 2.2-4 337 Fig. 2.2-4 Hospitals 0 10.1.4.5.2.1 0 10 1 4.5.2.1
~ ~ 0 10 1 4.5.2.1
~ ~ 0 10.1.4.5.2.1 Schools 0 0 0 0 Cooling system con- 21 mo 14 mo 35 mo. 21 mo struction period (per unit) 4.2.2 People Historic properties 10.1.4.5.2.2 10.1.4.5.2.2 0 10.1.4.5.2.2 10.1.4.5.2.2 (accessibility within plant site 2.3 of historical sites) 4.2.3 People Statement Any significant 10.1.4.5.2.2 Same as for 10.1.4.5.2.2 Same as for 10.1.4.5.2.2 Same as for 10.1.4.5.2.2 (accessibility archaeological selected system selected system selected system of archaeolo- resources in gical sites) area of cooling system will be mapped and investigated prior to construction 4.2.4 Wildlife Vegetation types Saltbush plain 10.1.4.5.2.3 Saltbush plain 10.1.4.5.2.3 Saltbush plain 10.1.4.5.2.3 Saltbush plain 10.1.4.5.2.3 affected mesquite wash Associated animal See 2.7 See 2.7 See 2.7 See 2.7 species 10.1-37/10.1-38 (Blank)