PVNGS-1,2&3 ER COOLING SYSTEM ALTEPJ4ATIVES Table 10.1-9 BASIC TABULATION TO BE USED IN COMPARING ALTERNATIVE PLANT SYSTEMS (Sheet 5 of 7)
Alternatives Rectangular Mechanical Draft Round Mechanical Draft Wet-Dry Mechanical Draft Fan-Assisted Natural Draft Cooling Tower System Cooling Tower System Cooling Tower System Cooling Tower System Environmental Costs Units Magnitude Reference Magnitude Reference Magnitude Reference Magnitude Reference 4.2.5 Land (erosion) Acres affected by 350 10.1.4.5.2.4 160 10.1.4.5.2.4 630 10.1.4.5.2.4 160 10.1.4.5.2.4 cooling system construction 4.3 Plant Operation Cubic yds soil dis- 847,000 10.1.4.5.2.4 S15,000 10.1.4.5.2.4 1,531,000 10 1 4 5 2 4 756 000 10 1 4 5 2 4 placed by excavation 4.3.1 People 1) Residences (1973) 10.1.4.5.3.1 10.1.4.5.3.1 10.1.4.5.3.1 10.1.4.5.3.1 (amenities) and public facili-ties within HUD "clearly unaccept-able" noise range Residences Schools Hospitals
- 2) Residences (1973) 10.1.4.5.3.1 10.1.4.5.3.1 10.1.4.5.3.1 10.1.4.5.3.1 and public facili-ties within HUD "normally unac-ceptable" noise range Residences Schools Hospitals
- 3) Residences (1973) 10.1.4.5.3.1 10.1.4.5.3.1 10.1.4.5.3.1 10.1.4.5.3.1 and public facili-ties within HUD "normally accept-able" noise range Residences 15 Schools 0 Hospitals 0
- 10. 1-39/10. 1-40 (Blank)