ML18192B352
| ML18192B352 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/24/1975 |
| From: | Van Brunt E Arizona Public Service Co |
| To: | Anthony Giambusso Office of Nuclear Reactor Regulation |
| References | |
| ANPP-2120 | |
| Download: ML18192B352 (4) | |
Text
'RIBUTION FOR PART 50 DOCK~1ATERIAL (TEMPORARY FQR)V(')
CONTROL NQ:
FILE'ROM.
Arizona Public Service Co
Hr. A. G'iambuaso CLASS UNCLASS PROPINFQ ORIG 1-signed INPUT CC OTHER NO CYS REC'D 1,'EiUT AEC PDR xxx SENT LOCAL PDR D
0:
STN>> 50-528
- 529, and 530 DESCRIPTION:
I Ltr I furn. schedule info conceinfng constructi of Palo Verde Nuclear Planta ENCLOSURES:
.'jDO NOT L PLANT NAME palo verde lthru 3 FOR ACTION/IfUFO RiVIATIOiU BUTLER (L)
LV/ Copies CLARK (L)
/ Copies ARR (L)
W/copies KNIEL (L)
W/ Copies SCH)iVENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSAI I A ll 1
W/ Copies PURPLE (L)
W/ Copies ZIEMANN(L)
W/ Copies DICKER (E)
W/ Copies f(fu I G Q I A foal I f= i W/ Copies YQUNGBLOOD (E)
W/ Copies REGAN (E)
W/ Copies LEAR (L)
W/ Copies SoEf S W/ Copies LV/ Copies INTERNALDISTRIBUTION RC PDR OGC, ROOM P-506A GOSSI CK/STAF F CASE GIAMBUSSO
~OYD MOORE (L)
~YOUiUG (L)
SKQVHOLT (L)
GOLI ER (L) (Ltr)
P. COLLINS DENISE
,G OFR FILE Ii REGION (2)
T.R. WILSON STEELE T CH REVIEW CIiROEDER MACCARY KNlG HT PAWLICKI SHAO STE LLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG LAINAS BENAROYA VQLLMER DE iUTOiU G R l)V(ES GA)~3 )%1 I L I KASTNER BALLARD SPAiUG LE R ENVI RO MULLER DICKER KNI6 HTON YOUNGB LOOD BEGAN PROJECT LDR HAR LESS LIC ASST R. DIGGS (L)
H. GEARIN (L)
E. GOULBQURNE (L)
P. KREUTZER (E)
J. LEE (L)
M. Iv'fAIGRET(L)
S. REED (E)
M. SERVICE (L)
S. Sl-IEPPARD (L)
M. SLATER (E)
H. Si')l1ITH (L)
S. TEETS (L)
G WI LLIAMS(E)
WWILSQN (L)
R. INGRAI)II (L)
A/T IND 8 RAI1 li>IA)U SA LTZ)~AAiU MELTZ PL NS DQNi)ALD CHAPMAN DURE (Ltr)
E. COUPF pETE RSQi I HARTFIELD (2)
KLECKER EISENHUT WlGG INTON EXTERNAL DISTRIBUTION LOCAL pDR Phoenix, Az 1 T!C (ABERNATHY)
(1)(2)(10) NATIONALLABS 1 NSIC (8UCHAiUAN) 1 W. PENNINGTON, Rill E-201 GT 1 ASLB 1
CONSULTAiUTS 1 Newton Anrlersor>
NEWillARK/BLUPI E/AG BA8I AN ACRS HOLDING/SENT '
P D R.SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSOiU, ORUL I AGMED (RUTH GUSSMAN)
Rm B-127 GT 1 J. D. RUNKLES, Rm E-201 GT i
ll'
~ ~
~
~
~
P. O. BOX 21666 PHOENIX, ARIZONA 65036 Mr. A. Giambusso, Director Division of Reactor Licensing U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555
. SN+SD C
Npq
~
~8/g~
,j ICOSI
~g(IS
~IIO Sub ject:
Palo Verde Nuclear Generating Stat'io Units 1, 2 and 3
Docket No. STN-50-528/529/530 March 24, 1975 ANPP-2120
'P 0
Dear Mr. Giambusso:
As the detailed design and construction planning for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 has proceeded, we have found that a significantly longer period of time than initially an-ticipated will be required to construct, these facilities.
Therefore, based on a prospective decision date for receipt of a construction permit of May 10, 1976 (as indicated in. NRC (AEC) letter, dated November 11, 1974),
we have changed the'resently scheduled Commercial Operation dates as follows:
Unit Presently Scheduled Commercial 0 eration New Scheduled Commercial 0 eration Dates May 1, 1981 November 1,
1982 May 1, 1984 May 1, 1982 May 1, 1984 May 1, 1986 Very truly yours, E.
E. Van Brunt, Jr.
Vice President, Nuclear Services EEVBJr/mw
)