ML18192A489
| ML18192A489 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/25/1978 |
| From: | Van Brunt E Arizona Public Service Co |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| ANPP-11792-RLR/JMA | |
| Download: ML18192A489 (4) | |
Text
REC:
STQLZ J F
NRC REGULATORY INFQRMATION DISTRIBUTION SYSTEM
< RID DISTRIBUTION FOR INCOMING MATERIAL 50-528 529/530 ORG:
VAN BRUNT E E DOCDATE: 09/25/78 AZ PUB SVC DATE RCVD:'IO O qg DOCTYPE:
LETTER NOTARIZED'O COPIES RECEIVED
SUBJECT:
LTR 1
ENCL 0 FURNISH1NG REQUE T FQR CURRENT NRC POSITION AND PLANS RE UTILITY PARTICIPATION IN THE NUC PWR RELIABILITYDATA SYSTEM.
PLANT NAME:PALO VERDE UNIT 1
PALO VERDE UNIT 2 PALO VERDE UNIT 3 REVIEWER INITIAL:
XJM DISTRIBUTER INITIAL:~"
'<<~~~~~~~<<~<<~~<<DISTRIBUTION OF 1HIS MA1ERIAL IS AS FOLLOW <<~~~<<<<<<~~~<<<<~
NOTES:
STANDARDIZED PLANT STANDARDIZED PLANTS
<DISTRIBUTION CODE E003)
I FOR ACTION:
ASST DIR VA SALLO<<LTR ONLY(i)
PROJ MGR ANGELO<<LTR ONLY(i>
BR CHIEF LWRN1 BC<<LTR ONLY(1)
LIC ASST LWRSl LA<<LTR ONLY(i)
FOR INFO:
FOR INFO:
INTERNAL:
EXTERNAL:
MOORE~~LTR ONLY(i)
R GILBERT<>LTR ONLY(i)
E FILE<<LTR ONLY</
r~~
OPERATOR LIC BR<<LTR ONLY< 1)
QAB~~LTR ONLY(i)
MIPC<<LTR ONLY(i)
MECl.l ENG BR4 >LTR ONLY(l)
MATERIAL ENG BR<<LTR ONLY(2)
REACTOR SYSTEMS BR%~LTR ONLY(i)
CORE PERFORMANCE BR<<LTR ONLY< 1 AUXILIARYGY BR~4LTR ONLY(l>
h C SYSTEMS BR<~LTR ONLY(.1)
AD FOR GITE TECH~>LTR ONLY(5)
ACCIDENT ANALYSIS<<LTR ONLY< 1)
RAD, ASSESSMENT BR<<LTR ONLY( 1 )
LPI)R'S Pl-lOENIX.
AZ><LTR ONLY< 0)
TERA~~~LTR ONLY(i>
NGIC4 ~LTR ONLY( 1 )
ACRG CAT B>+LTR ONLY(16>
EPBN2 BC<<LTR ONLY(i)
EPBN2 LA<<LTR ONLY<i)
NRC PDR<<LTR ONLY< 1)
OELD<<LTR ONLY(i.>
EMERGENCY PLAN BR+<LTR ONLY<i)
DIRECTOR NRR<<LTR ONLY(1 )
~
AD FOR ENG+4ELTR ONLY< 1 )
STRUCTURAL ENG BR~>LTR ONLY(1)
AD FOR REAC SFTY<+LTR ONLY<i)
ANALYSIS BR<<LTR ONLY(i>
AD FOR PLANT SYSTEMS<<LTR ONLY<
CONTAINMENT SYSTEMS<<LTR ONLY(i POWER SYG BR4+LTR ONLY<1)
AD FOR SITE ANLYS+~LTR ONLY(i)
EFFLUENT TREAT SYS<<LTR ONLY< 1 )
KIRKWOOD<<LTR ONLY(1)
DISTRIBUTION:
LTR 64 ENCL 0 SIZE:
1P CONTROL NBR:
781600287
<<<<<<<<4 5 v~cl% k%% 5%%<<CI k0l 0 %%4"%%4 k%%5 THE END
%%4( 3l<<%4%%3l <<<<4%%+<<><<4<<
9 (4r ff p1 sw P
l
mmmm g ww~aa EC (QCSEQIHRM'P P. 0 BOX 2I666 'HOENIX ARIZONA 65036 Septeaher 25, 1978 ANPP-11792-RLR/JMA Director, Nuclear Reactor Regulation Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Conarission Washington, D.C.
20555 Attn:
John F. Stolz, Chief Light Water Reactors Branch No. 1 Division of Project Management COI g~Cn
~C~
r R
CO f7)
A
~Pg I Re:
Palo Verde Nuclear Generating Station Units 1, 2 & 3; Docket Nos.
STN-50-528/
529/530 Please provide us with the current NRC position and plans regarding utilityparticipation in NPRDS.
Q
~CO
Dear Mr. Stolz:
It is our understanding that on Novenber 9, 1977 NRC Conakssioners Policy Meeting, the Conntissioners directed the Staff to prepare regulations to effect mandato utili artici ation in the Nuclear Power Reliability Data ystem e now un
- stan, that the NRC may be taking the p
f~a 1'ep p
<taut.k IJ@ iJtjf'(NTt HE NPF, EEVBJr/JMA/dlc cc:
R. L. Robb A. C. Rogers F.
W. Hartley J. E. Kirby D. B. Karner S. H. Shepard S. M. ayers Sincerely, Ez E. E. Van Brunt, Jr.
APS Vice President Construction Projects ANPP Project Director 78t600~87 8-eel h 5'/y
ft