|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
NRC roAM 195 U.S. NUCLEAA AEGULATOAV COMMISSION DOCKET IIUMOCA
(~7G) 529/530 FILL NUMOEA NRC DISTRIBUTION roA PART 60 DOCKET MATERIAL ENVIRO TO W. H. Re'gan, Jr. FROM DEPT ~ OP THE OF DOCUMENT NRC Fyquay'ATE Angeles, Garth A.
Calif.
ARMY'os 90053 2-12-76 DATE AECEIVED 2-23-76 glf,ETTEA QNOTOAI7ED PROP INPUT FOAM NUMSEA OF COPIES AECEIVED Sk)BIG INAL CIRJ Nc LASS I I'IE D Dcopv DsscAir TioN Ltr re our 12-2-75-ltr. ~ ..furn commen sNcLosUAE on FES for Palo Verde plant...
PLANT NAME pa . 1 o Verde 1 3 atm>mLI:5$
SAPETY ~ FOR ACTION/INFORMATION ENVXRO AS S XGNE DAD: ASSlGNED AD :
BRANCH CHXEH: BRANC!I CkIXEP ~
PROJECT 1LANAGER: PROJECT 1"IANAGER: . ~
LXC, SST ~ LIC ~ ASST,: gjgfc' INTERNAL DISTRI I3UTION 8'QXFXI~S NRC PDR 3 ~DESC ERNST I&E BENAROM 3ALT.A D SPANGLER P, D T')'ND~N~HER GOSSXCK & STAFF Ng XPPOLXTO C.
SITE TECH CASE KNIGHT OPH'RATING REACTORS GAMIXLL HA 3A S lkIIPEIL STELLO STEPP 3?AWLXCKX HUUIAN OPERATXNG TECH PROJECT HANAGEMENT RHACTOR SAFETY EISENHUT SITE ANALXSXS BOYD ROSS S11AO VOLL1IER P COLLXNS NOVAK BAFR BUNCH HOUSTON ROSZTOCZY SCHWENCER J ~ COLLINS PETERSON CHF.CK GRIt IES KREGER 1LELTZ HI.'LTEMES AT & I SITE SAFETY & HNVIR SKOVHOLT 'SALTZMAN ANALYSIS RUTI3ERG DEN'rOII & 1IUI.LT R EX I'ERNAL OIS1 RII3UTION CONTROL NUMI3ER LPDR ~ Phoenix Ariz na I ATL LAB BROOKHAVI'.N NATL LAB TXC REG. V"XE ULRXKSON (ORNI.)
N$JC T.A PDR A ST.13 CONSULTANTS
~CRS~mgmglSI-'
NAC FOAM ISS (2 7G)
'%C II
~ ~ ~ ~
~ ~ ~
k
~'At 'a~
J
DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS P. 0 BOX 27I I et I,~~) regulatory Doo4-...
(
1 SPLED-E'+g4 0 $ 12 February 1976 ZSn ('Eg/Pp Wm. H. Regan, Jr; Chief, Environmental Projects Branch 4 Division of Reactor Licensing U.S. Nuclear Regulatory Commission ~l ~ OO Washington,. D.C.
OgJ'y~
20555 8
Dear Mr. Regan:
This is in response to a letter from your office dated December 2, 1975 which requested" our review and comment on the draft supplement to the final environmental statement for the Palo Verde Nuclear Generating Station, Units 1, 2 and 3, Arizona. '4 The proposed action does.not conflict with existing or authorized plans of the Corps of Engineers. We have no, comments concerning the impacts of the proposed'lan.
The Corps of Engineers is currently conducting a Phoenix Urban Water Resources Study., 'This study, which is scheduled'or" completion in the fall of 1978, is being made to develop, a comprehensive water'esources plan which will fulfillall water,-related needs. In the event that information relevant to water resources is desired'r if we can be of
,assistance in any manner, please. feel free to contact us. This may be done by contacting Mr. Henry, W. 'Worthington, Chief', Urban Studies
'Section, Phoenix, Arizona, (602) 261-4201.
(
Thank you for the opportunity to review and comment on the propose action.
Sincerely yours,"
Zi,'ygmy ppszzsm>
GARTH MM4(
A. FUQUAY 5'~0 Chief,, Engineering Divisi 5684
Ik 0 r
J 1 4
lt tp