~- 0529 10/7/75 4 ~

'r ~ a NRC SECR ETARIAT 0 Commissioner CE Exec. Dir./Oper.

O Cong. Liaison.

~

O Public Affairs lO/7 CI Gen. Counsel Cl Solicitor O Secretary Incoming:

From:

To:

Subject:

Orme Lewis

- Jr.

4324 E. Palo Verde Dr.

Phoenix Az.

Chairman Anders 10 3 75 V rde Cl Prepare reply for signature of:

0 Chairman D Commissioner 0 EDO, GC, CL, SOL, PA, SECY Q

Signature block omitted 0

Return original of incoming with response Q

For direct reply" Q

For appropriate action Q

For information Q

For recommendation SUSPENSE DATE:

10/27/75 Bec'd Utf. O,r,, ~

Date

> F

!Tiws~&.

Remarks:

of incoming to Chairman Anders

~

~

NRC42

'C For the Commission t

"Send three (3) copies of reply to Secy Mail Facility 8278 ACTION SLIP P

g ~

))

i'd i

FROM

~

Orme Lewis Phoenix, Ariz.

To Chairman Anders

+V S

COVNNNMKNT RRINTINC OIgIgICRI l 973 CONTROL NUMBER 9278 DATE OF DOCUMENT 10/3/75 ACTION PROCESSING DATES AcknowledgeII Intecim Reply Fino l F ILE LOCATION ACTION COMPLETION DEADLINE 10/24/75 PREPARE FOR SIGNATURE OF:

Choirmon oi g

f R g I'g Boyd DESCRIPTION Ltr,QRylglnol Q Copy Q OIher REMARKS g

Req cy preliminary & final E1S for Palo Verde, &,info re ac feet of water used annually to generate 1,270 megawatts,'

comparative capital & operating costs of generating ele'ctri by different energy sources g

'ECY 76-0529 LPDR2 REFERRED To DATE Boyd f/attiori 10/8/75 IS NOT IF ICATION To THE J CAE RECOMMENDED?

Cy':. Rusche

'. Case Eisenhut ~

Docket Piles) 50-528~

PDR 50>>529 50-530 fdo.

~q+e DO NOT DETACH THIS COPY DIRECTOR OF REGULoATION COMMUNICATIONS CONTROL Form HQ-32 (1-73)

USA EC

lqi

ORME LEWIS, JR.

October 3, 19/5 Gentlemen:

Reference the Palo Verde nuclear generating station near Buckeye, Arizona, I am writing in regard to the final environmental impact statement, As a member of the Arizona State power plant and.

Transmission Siting Committee, whose approval is needed. before construction can start, X am requesting a copy of t¹ preliminary (draft) and. final environ-mental impact statements.

Xn aMition, I would appreicate being apprasied of the estimated. general demand for cooling water per unit of electricity generated; in other words, how many acre feet of water a used annually to generate 1,270 megawatts?

Also, it would be most useful if a paper might be provided.

me which discusses the comparitive capital and. operating costs of generating electricity by different energy sources, including coal, gas, hydro, oil and nuclear, Perhaps these issues are considered. in the EIS, but l would. appreiiate independent disuesions, Your consideration of this reequest would be most welocmed.,

Sincmely,

, Hon, 11illiam A, Anders Chairman Nuclear Regulatory Commission Uashington, D,C.

P,S. Nailing address:

4325 E. Palo Verde Dr,, Phoenix, Az.

ig t

v~

~

o FROM Orme Lewis Phoenix, Ariz.

To Chairman Andsrs

+V 3 COVCNNMEIII'IIINTINaOFPICEI 1973 CONTROL NUMBER 9

78 DATE OF DOCUMENT 10/3/75 CTION PROCESSING DATES Acknowledged Interim Reply Final 493 393 FILE LOCATION ACTION COMPLETION DEADLINE 10/2e/75 PREPARE FOR SIGNATURE OF:

Chairman ol ti f R e I H Boyd DESCRIPTION Ltr

@Original Q Copy Q Orher Req cy preliminary & final ETS for Palo Verde,

& info re ac feet of water used annually to generate 1,270 megawatts,'&

comparative capital & operating costs of generating electri by different, energy sources SECY 76-0529 ee REMARKS n

LPDRP REFERRED TO-:

DATE e

Boyd f/action .,10/8/75-IS NOTIFICATIONTo THE JCAE RECOMMENDED?

cy*;--.Rusche

." Case

Eieenhue

,.",Docket Pi.les) 50-528 PDR 50-529 50-530~

(eroyy $80"" 1 DO NOT DETACH THIS COPY DIRECTOR OF REGUL'ATION COMMUNICATIONS'CONTROL Form HQ-32" tl-73)

USA EC

I

~, ~

TO:

~- 0529 NRC SECRETARIAT D Commissioner CX Exec. Dir.loper.

D Cong. Liaison-

~

CI Public Affairs Logging Dale 10/7 O

Gen. Counsel O Solicitor O Secretary Incoming:

From:

To:

Subject:

Orme Lewis Jr.

4324 E. Palo Verde Dr.

Phoenix Az.

Chairman Anders 10 3 75 Verd Q

Prepare reply for signature of:

D Chairman O Commissioner O EDO, GC, CL, SOL, PA, SECY O

Signature block omitted O Return original of incoming with response-Q For direct reply" D

For appropriate action Q

For information Q

For recommendation USPDrSE DATE:

10/27/75 Rec'd Utt Dlr.i ~

Date~>

~

Tilt'~w, Remarks:

OZ incoming to Chairman Anders Nrtc42 For the Commission:

t "Send three (3) copies of reply to Secy Mail Facility 8276 ACTION SLIP

1 T

I+I f

0 a'

OR M E LEWI S, J R.

October 3, 197$

Gentlemen:

Reference the Palo Verde nuclear generating station near Buckeye, Arisona, I am writing in regard to the final environmental impact statement, As a member of the Arisona State power plant and.

Transmission Siting Committee, whose approval is needed. before construction can start, I am requesting a copy of the preliminary (draft) and. fina1 environ-mental impact statements, In aMition, I would. appreicate being apprasied of the estimated. general demand. for cooling water per unit of electricity generated.;

in other words, how many acre feet of'ater a used. annually to generate 1,270 megawatts.

Also, it would be most useful if a paper might be provided.

me which discusses the comparitive capital and. operating costs of'enerating electricity by different energy souzces, including

coal, gas, hydro, oil and. nuclear, Perhaps these issues aze considered. in the EIS, but I would. apprekiate independent d.isussions, Your consideration of this reequest would be most welocmed.,

Sincerely, C

Hon, M5.lliam A. Angers Chairman Nuclear Regulatory Commission llashington, D,C.

P,S, Nailing address:

4325 E. Palo Verde Dr., Phoenix, Az.

~

~

4