Letter to NRC Expressing Thanks for Response to Inquiry of 01/14/1978 Concerning Water Consumption for Atomic Power Plants, Specifically Palo Verde. Furnishes Additional Questions Pertaining to Subject
ML18192A174
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/07/1978
From: Lowes R
- No Known Affiliation
To: Gilbert R
Office of Nuclear Reactor Regulation
References
Download: ML18192A174 (4)


Text

REGUL'ATORY INFORMATION DISTRIBUTION SYSTEM (RIDS >

DISTRIBUTION FOR INCOMING,MATERIAL 50-528/529/530 REC: GILBERT R A ORG: LOWES R J DOCDATE: 02/07/78 NRC NONE DATE RCVD: 02/15/78 DOCTYPE: L'ETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 0 EXPRESSING THANKS FOR RESPONSE TO'NQUIRY OF 01/14/78 CONCERNING WATER CONSUMPTION FOR ATOMIC PWR PLANTS... AND FURNISHING ADDL QUESITONS PERTAINING TO THIS SUBJECT.

PLANT NAME: PALO VERDE UNIT 1 REVIEWER INITIAL: X JM PALO VERDE UNIT 2 DISTRIBUTER INITIAL:

PALO VERDE UNIT 3 DISTRIBUTION OF" THIS MATERIAL IS AS FOLLOWS NOTES:

i. J. WILSON WANTS ALL AMENDMENTS.
2. STANDARDIZED PLANT ENVIRONMENTAL COMMENTS (DISTRIBUTION CODE C002)

FOR ACTION: ASST DIR MOORE++LTR ONLY(l> BRANCH CHIEF REGAN>4LTR ONLY(i)

PROJ MGR GILBERT4+LTR ONLY<1) LIC ASST DUNCAN~<LTR ONLY<i)

FOR INFO: VASSALL044LTR ONLY< 1) STOLZ44L'TR ONLY<i~)

FOR INFO: AN LY(1 > HYLTON>~LTR ONLY(i)

INTERNAL: REG FILE++LTR Ohl NRC 'PDR++LTR ONLY(i>

FFP5 (2) OELD4+LTR ONLY<i)

HANAUER++LTR ONLY(1) DENTON/MULLER+>LTR ONLY(i'>

ERNST44LTR ONLY< 1) BALLARD44LTR ONLY(1)

YOUNGBLOOD++LTR ONLY(1) GAMMILL++LTR ONLY(2)

VOLLMER++LTR ONLY(1)'.

BUNCH4+LTR ONLY< 1)

COLLINS++LTR ONLY (1 > KREGER%%LTR ONL'Y(i)

EXTERNAL: LPDRiS PHOENIXr AZ+4'LTR ONLY < 1 )

NATL LAB ANL++L'TR ONLY(6>

NSIC4+LTR ONLY<'1)

TIC+>LTR ONLY(1>

ACRS CAT B44LTR ONLY(0)

DISTRIBUTION: LTR 34 ENCL 0 CONTROL NBR: 780460046 SIZE: 1P THE END

~ V gnn V n l n

I ff ~"

n> v I " I" Itt yV,n I '1 Il I I') p

'I

'I n

n ,p', ~ I nn Vnnf I lt It * ~ I S

" emcee oowpn~~~<>r VJ ]

~ re>r~~ <>>'

<<<E/

~Ea8g Dr. Robert A. Gilbert +~@8m Environmental Project Manager for Palo Verde Environmental Projects Branch 2 Nuclear RegQatory Commission 3fashington, DC 20555

Dear Dr. Gilbert:

Please thank Nr. Regan for responding to my inquiry (14 January 1978) concerning water consumption for atomic power plants.

Xet me restate my case. For each 1270 ISle nuclear unit at Palo Verde, it is projected that the annual water consumption will be 21,000 acre-feet, assuming a 75% capacity factor, I. am concerned specifically with Palo Verde.

water consumption would. be varied. from the projected. 75%.

if I would. like to kno~v what the annual the average annual capacity factor My reason for wanting this information is that I have seen in-formation that indicates that this capacity factor might be too high.

In the EXS for Palo Verde, the NRC in one case uses a 63% capacity factor, for a lifetime average. And in NASH 1159 (74)., the USAEC indicates that the average. lifetime capacity factor will be 66%

reactor life is 50 years. thermore, I have seen two other if'he

~~

studies that conclude that a 55% capacity factor might be more likely.

Since I am concerned. with water consumption on a per-kilowatt-hour basis, I need. to know how to discount the water consumption range on an annual basis, aa.'%he electrical production range is extended on an annual basis. Do you have any criteria to determine how the water consumption cteclines as electrical production declines-on an annual basis?

I appreciated last inquiry your speedy responses by phone and: by mail to my ~,

Sincerely, Russell J. owes 7501 E. Hubbell Scottsdale, AS 85257 Qo~ ~~