Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load
ML18191B338
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/09/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
Shared Package
ML18191B337 List:
References
ND-18-0813
Download: ML18191B338 (4)


Text

^

Southern Nuclear JUL 0 9 2018 Docket Nos.;52-025 52-026 Michael J. Yox Regulatory Affairs Director Vogtie 3 & 4 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtie Electric Generating Plant Unit 3 and Unit 4 Resubmittal of Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load 7825 River Road Waynesboro, GA 30830 706-848-6459 tei 410-474-8587 ceii myox @soutfiernco.com ND-18-0813 10 CFR 52.99(c)(3)

Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as ofJune 7, 2018, Vogtie Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) forthe following itemshave not been completed greater than 225-days priorto initial fuel load:

ITAAC 3.3.00.07d.ii.a [Index Number 800]

ITAAC 3.3.00.07d.iii.a [Index Number 803]

ITAAC 3.3.00.07d.iv.a [Index Number 806]

ITAAC 3.3.00.07d.v.a [Index Number 809]

The Enclosures describe the planforcompleting these ITAAC. Southern NuclearOperating Company will, at a laterdate, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

Southern Nuclear Operating Company (SNC) previously submitted Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load for Items 3.3.00.07d.ii.a; iii.a; iv.a; v.a; [Index Numbers 800, 803, 806, 809] ND-18-0413 [ML18087A377, ML18087A378, ML18087A379, ML18087A380], dated March 27, 2018. This resubmittal supersedes ND-18-0413 in its entirety.

This notification is informed bythe guidance described in NEI 08-01, Industry Guideline forthe ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, oranalyses have not been performed or have been only partially completed.

All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submittedto NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

U.S. Nuclear Regulatory Commission ND-18-0813 Page 2 of 4 Respectfully submitted, Micfiael J. Yo>

Regulatory Affairs Director Vogtle 3 &4 :

Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit4 Docket No.: 52-025 & 52-026 Completion Plan for Uncompleted ITAAC 3.3.00.07d.ii.a[Index Number800] :

Vogtle Electric Generating Plant (VEGP) Unit3 and Unit 4 Docket No.: 52-025 & 52-026 Completion Plan for Uncompleted ITAAC 3.3.00.07d.iii.a [Index Number803] :

Vogtle ElectricGenerating Plant (VEGP) Unit 3 and Unit 4 Docket No.: 52-025 & 52-026 Completion Plan for Uncompleted ITAAC 3.3.00.07d.iv.a[Index Number806] :

Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Docket No.: 52-025 & 52-026 Completion Planfor Uncompleted ITAAC 3.3.00.07d.v.a[Index Number 809]

MJY/LBP/amw

U.S. Nuclear Regulatory Commission ND-18-0813 Page 3 of 4 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)

Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)

Mr. D. L. McKinney Mr. M. J. Vox Mr. D. L. Fulton Mr. J. B. Klecha Mr. G. Chick Mr. F. H. Willis Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Mr. J. P. Redd Ms. A. C. Chamberlain Mr. D. R. Culver Mr. T. G. Petrak Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reaulatorv Commission Mr. W. Jones (w/o enclosures)

Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Ms. L. A. Kent Mr. P. B. Donnelly Ms. N. C. Coovert Oalethoroe Power Corporation Mr. R. B. Brinkman Municipal Electric Authoritv of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

U.S. Nuclear Regulatory Commission ND-18-0813 Page 4 of 4 Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Sen/Ice Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham