MONTHYEARML24026A2802024-01-25025 January 2024 Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) ML23270B8712023-09-27027 September 2023 NRR E-mail Capture - Draft RAIs for License Amendment Request (LAR) to Revise the Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Emergency Plan (L-2023-LLA-0083) ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23186A1392023-07-0505 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer Emergency Plan (EP) License Amendment Request (LAR) (L-2023-LLA-0083) ML23131A1492023-05-10010 May 2023 2023 V.C. Summer Commercial Grade Dedication Inspection Information Request ML23044A3392023-02-13013 February 2023 NRR E-mail Capture - Acceptance Review for Change to Reactor Vessel Surveillance Capsule Schedule (L-2023-LLL-0002) ML23027A0122023-01-26026 January 2023 002 Radiation Safety Baseline Inspection Information Request ML23026A0152023-01-23023 January 2023 NRR E-mail Capture - Feb 14, 2023 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal to Relocate the Emergency Operations Facility for the VC Summer Power Station - Dominion Slides ML22263A0502022-09-19019 September 2022 NRR E-mail Capture - Draft Request for Additional Information for Proposed Alternative Request RR-4-26 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval V.C. Summer Unit 1 ML22194A9422022-07-13013 July 2022 NRC 50.59 Inspection (IP 71111.17T) Information Request ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22173A0292022-06-17017 June 2022 NRR E-mail Capture - Acceptance Review for Summer to Defer Weld Examinations (L-2022-LLR-0052) ML22139A2302022-05-19019 May 2022 NRR E-mail Capture - Acceptance Review for Summer TS 4.6.2.1.d LAR (L-2022-LLR-0060) ML22139A2322022-05-19019 May 2022 NRR E-mail Capture - Acceptance Review for Summer TSTF-491 LAR (L-2022-LLR-0059) ML22084A4052022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review for Summer Dissimilar Metal Weld Inspection Interval (L-2022-LLR-0033) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21333A1892021-11-29029 November 2021 NRR E-mail Capture - Draft RAI for Summer LAR Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, (TSTF-425) ML21253A1352021-09-0808 September 2021 Document Request for VC Summer Nuclear Station - Radiation Protection Inspection - Inspection Report 2021-04 ML21197A0432021-07-15015 July 2021 VCS ISI 2021004 RFI - Combined ML21187A1242021-06-28028 June 2021 10CFR Part 21 Update - Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification ML21173A1782021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review - Summer LAR Unit Staff Qualification Relocation TS to Quality Assurance Program Description (QAPD) ML21145A0222021-05-24024 May 2021 003 Radiation Safety Baseline Inspection Information Request ML21131A0402021-05-11011 May 2021 NRR E-mail Capture - V.C. Summer, Unit 1 - Final RAI for the Spring 2020 RFO Sgtir Review ML21125A1942021-05-0505 May 2021 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2021-LLA-0064) ML21020A0562021-01-20020 January 2021 Email Capture Upcoming V.C. Summer POV Inspection (IP71111.21N.02) Information Request ML20342A1822020-12-0707 December 2020 NRR E-mail Capture - Final RAI for Summer LAR - TS 3.6.4 ML20342A3822020-12-0707 December 2020 NRR E-mail Capture - Final RAIs for Summer Fs LOCA LAR ML20321A2112020-11-16016 November 2020 NRR E-mail Capture - Summer, Unit 1 - Final RAIs for the SG Tube Inspection Report Review ML20316A0122020-11-0404 November 2020 NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141) ML20302A2032020-10-28028 October 2020 NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141) ML20260H4262020-09-0303 September 2020 NRR E-mail Capture - Acceptance Review for Fleet Relief Request for Code Case N-885 ML20178A5892020-06-26026 June 2020 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review of the Fsloca LAR (L-2020-LLA-0124) ML20178A5932020-06-23023 June 2020 NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-19 ML20178A5912020-06-23023 June 2020 NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-21 ML20149K4262020-05-21021 May 2020 NRR E-mail Capture - V. C. Summer, Unit 1 - Acceptance of License Amendment Request (LAR-20-142) Related to TS 3.6.4, Containment Isolation Valves (L-2020-LLA-0092) ML19218A3742019-08-0606 August 2019 NRR E-mail Capture - Virgil C. Summer, Unit 1 -Acceptance of Relief Request (RR-4-20), Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19214A2732019-08-0202 August 2019 NRR E-mail Capture - Virgil C. Summer, Unit 1 - Acceptance of License Amendment Request to Change Company Name ML19211D5102019-07-30030 July 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 (Supplement to PRA RAI 03) ML19179A1262019-06-27027 June 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19155A2752019-06-0404 June 2019 VC Summer 2019003 Rad Safety Inspection Document Request ML19140A2692019-05-17017 May 2019 Acceptance of Alternative Request (RR-4-23)to Utilize Code Case N-513-4 ML19105B1652019-04-15015 April 2019 NRR E-mail Capture - VC Summer SPRA Review - Clarification Questions on Credit for the Abeyance RCP Seals ML19102A0702019-04-11011 April 2019 NRR E-mail Capture - V.C. Summer, Unit 1: Relief Request (RR-4-22) Verbal Authorization Script ML19095A6532019-04-0404 April 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information NFPA-805 Program Revisions LAR ML19072A1442019-03-13013 March 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19095A6582019-03-0404 March 2019 NRR E-mail Capture - VC Summer SPRA Review - Clarification Questions on Peer Review Findings and Plant Modifications ML19095A6672019-01-30030 January 2019 NRR E-mail Capture - VC Summer SPRA Clarification Questions on Circuit Analysis and Relay Replacement ML19031B4332019-01-29029 January 2019 Email Regarding VC Summer Units 2 & 3 Letter from Santee Cooper on Termination of COL ML19009A1052019-01-0909 January 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-10-02395, TS 3.8.2, D.C. Sources - Operating ML19009A5362019-01-0909 January 2019 NRR E-mail Capture - VC Summer Clarification Question on Fussell-Vesely Values 2024-01-25
[Table view] |
Text
CHAIRMAN Resource From: Tom Gurdziel <tgurdziel@twcny.rr.com>
Sent: Friday, July 06, 2018 10:22 PM To: tmoore@postandcourier.com; abrown@postandcourier.com; awilks@thestate.com Cc: kormanr@enr.com; judys@enr.com; 'Ed Stronski'; Bridget Frymire; techols@psc.state.ga.us; Screnci, Diane; CHAIRMAN Resource; qainfo@nsr.gojp
Subject:
[External_Sender] Surety Bonds & V.C. Summer Units 2 & 3 Attachments: McMaster #9.docx; 259Jpg Good morning, I hope to mail this letter out with the picture showing some of my heavy construction experience by Tuesday morning. Looking northeast, I took this picture from the top of one of two oil-fired boilerhouses. Foundation rings for fuel oil storage tanks are to the right. The coal-fired Danskammer Point plant is just left of center. Going down the Hudson River, (to the right), will take you to New York City. The year is 1971, or maybe, 1970. This is the "Roseton" (New York) job .
Thank you, Tom Gurdziel Member, ASME I0 K~1 Virus-free. www.avast.com 1
9 Twin Orchard Drive Oswego, NY 13126 July 6, 2018 The Honorable Henry McMaster State House 1100 Gervais Street Columbia, South Carolina 29201
Dear Governor Henry McMaster:
To me, one of the most intriguing questions related to the SCANA/V.C. Summer Units 2 and 3 construction failures is why we have heard absolutely NO mention of any surety bond insurance coverage. Doesn't it seem like a "no-brainer "decision for high level, regulated utility management to have their customers pay completely for it as a "prudent" expense?
I have no experience with surety bonds and, in fact, I do not believe I even heard of them when I was in the heavy construction industry, which was the late 1960s to just before the 1980s.
However, I presently am reading some strong claims as to their value. In fact, the current issue of "ENR, Engineering News-Record", (July 2/9, 2018) presents an entire section, (pages 25 - 43),
on them.
Could I recommend that you have a staff member call Ann Kalb, Single Copy Sales, (248-244-6499) and purchase a copy or two, then obtain the services of an insurance-knowledgeable person to read the articles in the section and provide understandable explanations to you? In particular, read the short article "The Performance/Payment Bonds Promise on Public & Private Projects" by Robert Duke on page 34, paying special attention to paragraph 6 which discusses prequalification.
Since construction at V.C. Summer, Units 2 and 3 is not proceeding, I think we can conclude that there is no surety bond. However, I think it would be extremely valuable (perhaps when judging management communication honesty), to find out if surety bond coverage actually was requested but refused during the prequalification process.
Very truly yours, Thomas Gurdziel