WPPSS Nuclear Project No. 2 Meeting Request on Hydrogen Recombiner and Other Issues of Concern
ML18191A197
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/21/1978
From: Renberger D
Washington Public Power Supply System
To: Harold Denton
Office of Nuclear Reactor Regulation
References
G02-78-189
Download: ML18191A197 (6)


Text

REGULATQRY DISTRIBUTION FOR REC:

DENTON H R

NRC QRG:

RENBERGER D L WA PUB PWR SUPPLY SYS DOCDATE: 07/21/78 DATE RCVD: 07/25/78 INFORMATION DISTRIBUTION SYSTEM (RIDS)

INCOMING MATERIAL 397 REVIEWER INITIAL:

XJM DISTRIBUTOR INITIAL:~

+q>>++++++>++<>++++ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS DOCTYPE:

LETTER NOTARIZED:

NO COPIES RECEIVED

SUBJECT:

LTR 1

ENCL 0 REQUESTING NRC PARTICIPATION IN REGARDS TO APPLICANT"8 PROPOSED USE OF A

CATALYTIC RECOMBINER AND OTHER ISSUES OF CONCERN)

FROM PREVENTING IMPACT OF APPI ICANT"S SCHEDULED MARCH 1980 FUEL LOAD DATE.

AND REQUESTING MEETING SOON AS POSSIBLE.

PLANT NAME: WPPSS UNIT 2 PSAR/FSAR AMDTS AND RELATED CORESPONDENCE

<DISTRIBUTION CODE 8001)

FOR ACTlON:

ASST DIR VASSALLO44LTR ONLY< 1 )

BR CHIEF LWRS4 BC%<LTR ONLY< 1 )

PROJ D.

LYNCH+4LTR ONLY(1)

LIC ASST LWR04 LA>+LTR ONLY(1>

INTERNAL:

EXTERNAL:

REG F 4+LTR ONLY(1)

E+%LTR ONLY<2)

OPERATOR LIC BR++LTR ONLY(i)

QABN+LTR ONLY<i)

MIPC++LTR ONLY(1>

MECH ENG BR4+LTR ONLY<1)

MATERIAL ENG BR+>LTR ONLY(2)

REACTOR SYSTEMS BR++LTR ONLY(1)

CORE PERFORMANCE BR++LTR ONLY(1 AUXILIARYSYS BR+~LTR ONLY< 1)

I 5 C SYSTEMS BR++LTR ONLY(1>

AD FOR SITE TECH44LTR ONLY(4)

ACCIDENT ANALYSIS++LTR ONLY(1>

RAD ASSESSMENT BR++LTR ONLY(i)

GEOSCIENCES BR>+LTR ONLY(i)

LPDRiS RICHLAND, WA44LTR ONLY(i)

TERA>%LTR ONLY(1)

NSIC>+LTR ONLY<i)

ACRS CAT B++LTR ONLY(ib>

NRC PDRN+LTR ONLY(1)

OELD<+LTR ONLY(1)

EMERGENCY PLAN BR++LTR ONLY(1)

DlRECTOR NRR++LTR ONLY< 1)

AD FOR ENG4+LTR ONLY(i>

STRUCTURAL ENG BR+4LTR ONLY< 1)

AD FOR REAC SFTY>>LTR ONLY(1)

ANALYSIS BR+wLTR ONLY<i)

AD FOR PLANT SYSTEMS>+LTR ONLY(

CONTAINMENT SYSTEMS++LTR ONLY< 1 POWER SYS BR<~LTR ONLY(1>

AD FOR SITE ANLYS+%LTR ONLY< 1)

EFFLUENT TREAT SYS++LTR ONLY(1)

KIRKWOOD+4LTR ONLY<i) j DISTRIBUTION:

LTR 57 ENCL 0 S1 ZE:

2P

%%% %4%4 4 %%%%%% 0M4% <F%%%% %%%%%%%%%%%%

THE END CONTROL NBR:

78207003

/Lf

W

~

~

Vh f

If

~,

v I

lI vl~

W I

Wf

)

v I

N l

Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 968 3000 GCO. WA$NINCZON WAY RICHLAND. WASHINO'tONMQ352 July 21, 1978 G02-78-189 Docket No. 50-397 lt PHONE (509) 375 5000 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555

Subject:

WPPSS NUCLEAR PROJECT NO.

2 MEETING REQUEST ON HYDROGEN RECOMBINER AND OTHER ISSUES OF CONCERN Qu~

-'l CfP

Reference:

1)

Letter, RS Boyd to NO Strand, dated June 9, 1978 "Results of WPPSS-2 Acceptance Review" 2)
Letter, DL Renberger to SA Varga, July 10,
1978, "Post LOCA Hydrogen Recombiner Supplemental Information"

Dear Mr. Denton:

v,"l' In a meeting with members of the )$C",staff and'anagement on May 18, 1978, our proposed use of a catalytic recombiner was identified by the staff as an item of major concern.

In addition, in Reference (1) it was stated that our prompt attention to the matter was needed in order for the result-ing review not to impact our scheduled

March, 1980 fuel load date.

Accordingly, WPPSS and its contractors went to great efforts to gather the required supplemental information into a report.

It was our intent to deliver the report at a meeting with the Containment Systems Branch reviewer and give a brief presentation summarizing the report.

The reason for this desired approach was the need for expeditious feedback from the NRC on the need for any additional testing information and the licensability of the recombiners so as not to impact our construction schedule.

We were

advised, however, that a Containment Systems Branch reviewer had not been assigned to WNP-2, based upon the priority assignment for NRC review of applications and, therefore, a meeting was impossible to schedule.

Accord-ingly,,thereports were hand-delivered to the WNP-2 licensing project manager on July 13, 1978.

The accompanying transmittal letter to the reports (Reference

2) requested feedback f'rom the staff by August 15, 1978.

This frustrating development was compounded by the fact that it was also learned on July 13, 1978 that no 18C reviewer had been assigned to WNP-2 for the same reason.

This is of major concern to WPPSS since it is our understanding that the NRC will find it difficult to produce a comprehensive review schedule without assigned reviewers in the two areas particularly critical to WNP-2.

WPPSS, with the submission of the recombiner information has satisfied the necessary prerequisites stated by the NRC in Reference (1) for production of such a schedule.

78207003'

C V'

0 I

I

0 Harold R. Denton Page 2

G02-78-189 7-21-78 J,

WPPSS is spending a great deal of money and effort in attempting to attain a March, 1980 fuel load.

This includes taking necessary measures to be responsive to the NRC staff on a timely basis.

The early identi-fication and resolution of NRC concerns is necessary to afford us maxi-mum opportunity to make potential design changes in a most amenable and cost-effective manner with minimal schedule impact.

As noted above, the staff has identified the hydrogen recombiner as an item needing "prompt" resolution.

However, until an NRC staff reviewer is assigned, progress in this area is 'stopped.

Your immediate attention to this item is requested.

While the hydrogen recombiner is the item of immediate interest, there are several other items related to the review of WNP-2 which concern us due to an to an apparent lack of staff activity.

Specifically; 1)

The status of the second acceptance review questions (to date we have received none),

2)

The extension of our CP,, due to expire September.

1, 1978.

An extension was requested December 28, 1976, 3)

The Fuel-Can Interaction Topical, submitted to the NRC October 24, 1977, and 4)

The Fire Protection Report, submitted to the NRC November 3, 1977.

We request the opportunity to meet with you as soon as possible to discuss our concerns.

I,:will be contacting you by phone within the next few days to arrange the meeting.

Very truly yours, DLR:OKE:cph oc ep J~~zp D. L.

RENBERGER Assistant Director Generation 5 Technology cc:

SA HD J.

JJ FA E.

D.

N.

RS

Varga, NRC
Lynch, NRC Ellwanger, BSR Verderber, BSR
MacLean, GE
Chang, GE
Roe, BPA
Reynolds, Devevoise 5 Liberman
Boyd, NRC

4 j

~

~