ML18191A089
| ML18191A089 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point, Columbia, Limerick, LaSalle, Zimmer, Shoreham, Bailly File:Long Island Lighting Company icon.png |
| Issue date: | 07/17/1978 |
| From: | Sobon L General Electric Co |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| MFN-293-78, NEDO-21669 | |
| Download: ML18191A089 (3) | |
Text
(M/ey REGULATORY INFORMATION DISTRIBUTION SYSTEN
< RIDS)
DISTRIBUTION FOR INCOMING MATERIAL TGPREP REC:
STOLZ J F
NRC ORG:
SOBON L J GEN ELEC DOCDATE: 07/17/78 DATE RCVD: 07/27/78 DOCTYPE:
LETTER NOTARIZED:
NO COPIES RECEIVED
SUBJECT:
LTR 1
ENCL 70 FORWARDING GE REPT ENTITLED:
"THE MULTIVENT HYDRODYNAMIC MODEL FOR CALCULATING POOL BOUNDARY LOADS DUE TO CHUGGING MARK II CGNTAINNENTS>
NEDO-21669 FEB 1978.
REVIEWER INITIAL: XJN DISTRIBUTOR INITIAL:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS TOPICAL RPTS 8( CORRESPONDENCE RE MARK II CONTAINMENT (DISTRIBUTION CODE T002)
INTERNAL:
REG FILE++M/0 ENCL CENTRAL FILE4+W/2 ENCL 50-322 FILE++LTR ONLY 50-352 FILE4<LTR ONLY 50- - 53 FILE+4 LTR ONLY 59-~
F ILE++LTR ONLY 50-367 FILE++LTR ONLY ILE++LTR ONLY 50-374 FILE~~LTR ONLY 50-~
FILE++LTR ONLY 50" 410 FILE+4LTR ONLY PDR+~W/ENCL STRUCTURAL ENG BR4+W/2 ENCL CONTAINNENT SYSTEMS++W/7 ENCL AD FOR ENG+4W/2 ENCL C ANDERSGN+wW/EhICL I PELTIER~~W/ENCL M
D LYNCH+<M/ENCL J
SNELL~~WfENCL A BOURNIA~~W/EhICL W KANE++W/ENCL S MINER~~W/ENCL D TIBBETTS~~4W/ENCL DEPUTY DIR DPM+4LTR ONLY D VASSALLO++LTR ONLY LWR02 CHIEF+>LTR ONLY LWR83 CIHIEF+~~LTR ONLY LWR51 CI.IIEF++LTR ONLY AD FOR PLANT SYSTENS++LTR ONLY N RUSIIBROOK++LTR ONLY W PIKE++LTR ONLY LWRS4 CHIEF44LTR ONLY EXTERNAL:
LPDR'8 PORT JEFFERSON-PDR++W/ENCL POTTSTOWhl, PA-PDR++WfENCL BATAVIAi OH-PDR+'+W/ENCL CI.IESTERTON> IN-PDR+4W/ENCL OGLESBY IL-PDR++W/ENCL RICHLAND WA-PDR++WfEhtCL OSWEGO) NY-PDR++W/ENCL TERA~~W/ENCL NS IC++W/ENCL ACRS CAT ++Wf16 ENCL DISTRIBUTION:
LTR 65 ENCL 47
-"IZE:
1P+ 50P TIIE END CONTROL NBR:
7820100: 3
GENERAL ELECTRIC COMPANY, 175 CURTNER AVE., SAN JOSE, CALIFORNIA95125 MC 681, (408) 925-3495 NUCLEAR ENERGY PROJECTS DIVISION MFN-293-78 July 17, 1978 U.
S. Nuclear Regulatory Commission Division of Reactor Licensing Office of Nuclear Reactor Regulation Washington, D.
C.
20555 Attention:
Gentlemen:
SUBJECT:
Reference:
Mr. John F. Stolz, Chief Light Water Reactors Branch No.
1 GENERAL ELECTRIC REPORT, "THE MULTIVENT HYDRODYNAMIC MODEL FOR CALCULATING POOL BOUNDARY LOADS DUE TO CHUGGING-MARK II CONTAINMENTS," NED0-21669, FEBRUARY, 1978 Letter with report, "General Electric Report,
'The Multivent Hydrodynamic Model for Calculating Pool Boundary Loads Due to Chugging - Mark II Containments,"
- February, 1978" to John F. Stolz (NRC), from L. J.
Sobon (GE) dated March 8, 1978 Seventy (70) copies of the subject report are being provided by General Electric for the Mark II Owners Group for your review as part of the Mark II Containment Supporting
- Program, Task A.6.
This report presents the method for calculating design evaluation basis pool boundary loads due to chugging for Mark II containments.
This report is the non-proprietary version of NEDC-21669P submitted to you in March, 1978 (Reference).
Sincere L. J.
- Sobon, Manager BWR Containment Licensing Containment Improvement Programs LJS: csc/399-400
Enclosures:
70 cc:
C. J.
Anderson (NRC)
H.
C.
Brinkmann (Mark II Owners Group)
H.
Chau (Mark II Owners Group)
L.
S. Gifford (GE-Bethesda) 732@/QO'7'~
I. A. Peltier (NRC}
R.
L. Tedesco (I/RC)
h>>
/
A