August 17, 2018 MEMORANDUM TO:
Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM:
Donald Habib, Project Manager /RA/
Licensing Branch 4 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
SUMMARY
OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON JUNE 28, 2018 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on June 28, 2018. The purpose of the meeting was to discuss issues associated with the safety review of licensing actions for SNCs Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18150A282. The meeting notice is also posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The other documents referenced during the discussion can be found at the ADAMS Accession Nos. given below:
Licensing Exemption Request for Crediting VC Summer Initial Operating Licensing Exam for VEGP Operators, NRC Comments
- ML18170A139 Licensing Amendment Request 17-037, Changes to Tier 2* Departure Evaluation Process, related to Initial Test Program
- ML17355A416 CONTACT:
Donald Habib, NRO/DLSE (301) 415-1035
J. Dixon-Herrity Summary of Meeting:
On June 24, 2018, staff from the NRC conducted a public meeting with representatives from SNC to discuss issues associated with the safety review of licensing actions for SNCs VEGP Units 3 and 4. Specifically, the meeting discussed (1) operator licensing, and (2) LAR 17-037 for changing the Tier 2* departure evaluation process for VEGP Units 3 and 4.
The first topic discussed was operator licensing. The staff sent SNC comments on June 19, 2018. SNC asked a question about how to complete the portion of the NRC Form 398 for the applicants that will be included in the exemption request. The staff informed SNC they would need to review NRC Form 398 and discuss the staffs response at a later time.
The second topic discussed was how changes to initial test program Tier 2* information would be handled under SNCs proposed license condition in LAR 17-037. For this topic, the staff requested SNC to clarify its reference to Tier 1 information (i.e., Adequately Addressed in Tier 1 and COL) for the passive residual heat removal natural circulation test and automatic depressurization system and core make-up tank verification tests, as noted in its initial LAR submittal dated December 21, 2017, Enclosure 5, page 5 of 6. SNC stated that the relevant Tier 1 information included the following items, including inspections, tests, analyses, and acceptance criteria (ITAAC):
For UFSAR Section 14.2.10.3.7 - Passive Residual Heat Removal Heat Exchanger (First Plant Only):
Tier 1 Table 2.2.3-4, ITAAC 8.b For UFSAR Section 14.2.9.1.3 - Passive Core Cooling System Testing:
Tier 1 Table 2.2.3-4, ITAAC ITAAC 8.c Tier 1 Table 2.1.2-4, ITAAC 8.d and 12.a Tier 1 Table 2.5.1-1 and 2.5.2-3 Tier 1 Table 2.1.2-4, ITAAC 5.b, piping information *
- Table 2.1.2-4 is the correct citation. This was misstated on the call as Table 2.1.2-2 At the end of each topic discussed, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from members of the public.
Docket Nos.: 052-025 052-026
Enclosure:
As stated cc w/encls.: See next page
ML18184A099 NRC-001 OFFICE PM: DLSE/LB4 LA: DLSE/LB4 BC: DLSE/LB4 PM: DLSE/LB4 NAME DHabib (c)
RButler (c)
JDixon-Herrity (c)
DHabib (s)
DATE 8/17/18 7/16/18 8/17/18 8/17/18
AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)
Thursday, June 28, 2018 9:00 a.m. - 12:00 p.m.
PURPOSE:
To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
OPEN Time Topic Led By 9:00 a.m.
Opening Remarks NRC 9:05 a.m.
Discussion of Operator Licensing NRC/SNC 9:15 a.m.
Opportunity for Public Comment PUBLIC/NRC 9:15 a.m.
Discussion of LAR 17-037 for Changing the Tier 2* Departure Evaluation Process for VEGP Units 3 and 4 NRC/SNC/Westinghouse 9:25 a.m.
Opportunity for Public Comment PUBLIC/NRC 9:25 a.m.
Adjourn NRC/SNC
PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, June 28, 2018 9:00 a.m. - 12:00 p.m.
List of Attendees Name Organization Representing the Nuclear Regulatory Commission Chandu Patel NRO/DNRL/LB4 Donald Habib NRO/DNRL/LB4 Jennifer Dixon-Herrity NRO/DNRL/LB4 Lauren Nist NRO/DCIP/HOIB Jim Gaslevic NRO/DCIP/HOIB Bruno Caballero RII/DRS/OB2 Kevin Roach OGC/GCHEA/AGCNRP David Roth OGC/GCLR/RMR John Frost NSIR/DPCP/RSB Paul Prescott NRO/DCIP/QVIB Representing Industry Wes Sparkman Southern Nuclear Operating Company (SNC)
Tom Hicks SNC Kelli Roberts SNC Tom Admunsen SNC Neil Haggerty SNC Representing Public Steve Franzone
- Florida Power & Light Company Jana Bergman
- Curtis-Wright
- = participated via teleconference
Vogtle Units 3 & 4 Mailing List (Revised 03/13/2018) cc:
Office of the Attorney General Resident Inspector 40 Capitol Square, SW Vogtle Plant Units 3 & 4 Atlanta, GA 30334 8805 River Road Waynesboro, GA 30830 Resident Manager Oglethorpe Power Corporation Mr. Barty Simonton Alvin W. Vogtle Nuclear Plant Team Leader 7821 River Road Environmental Radiation Program Waynesboro, GA 30830 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 42 Inverness Center Parkway, Bin 237 Birmingham, AL 35242 George B. Taylor, Jr.
2100 East Exchange Pl Anne F. Appleby Atlanta, GA 30084-5336 Olgethorpe Power Corporation 2100 East Exchange Place Brian H. Whitley Tucker, GA 30084 Regulatory Affairs Director Southern Nuclear Operating Company County Commissioner 42 Inverness Center Parkway, BIN B237 Office of the County Commissioner Birmingham, AL 35242 Burke County Commission Waynesboro, GA 30830 Mr. Michael Yox Site Regulatory Affairs Director Mr. Wayne Guilfoyle Vogtle Units 3 & 4 Commissioner District 8 7825 River Road, Bin 63031 Augusta-Richmond County Commission Waynesboro, GA 30830 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman)
ALPUGH@southernco.com (Amanda Pugh) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)
G2NDRMDC@southernco.com (SNC Document Control) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jannina.blanco@pillsburylaw.com (Jannina Blanco) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) jranalli@meagpower.org (Jerry Ranalli) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy)
KSutton@morganlewis.com (Kathryn M. Sutton)
Page 2 of 3
Vogtle Units 3 & 4 Mailing List kwaugh@impact-net.org (Kenneth O. Waugh) lchandler@morganlewis.com (Lawrence J. Chandler)
Marc.Pickering@hq.doe.gov (Marc Pickering) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Melissa.Smith@Hq.Doe.Gov (Melissa Smith)
Michael.Kuca@hq.doe.gov (Michael Kuca) mike.price@opc.com (M.W. Price)
MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)
MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)
RJB@NEI.org (Russell Bell)
Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephan.moen@ge.com (Stephan Moen) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)
Page 3 of 3