Region III Fire Protection Utilities Group Meeting on 06/12/2018 (DRS-D.Szwarc)
ML18176A340
Person / Time
Issue date: 06/12/2018
From: Atif Shaikh, Dariusz Szwarc
Engineering Branch 3
To:
References
Download: ML18176A340 (16)


Text

Region III Fire Protection Utilities Group Meeting Atif Shaikh Dariusz Szwarc June 12, 2018 ADAMS Accession Number: ML18176A340

Topics

  • Fire protection staff
  • Inspections
  • Findings
  • Inspection procedure changes 2

Fire Protection Staff

  • EB3 inspectors

- Alan Dahbur, Jasmine Gilliam, Jessie Hafeez, George Hausman, John Robbins, Atif Shaikh, Dariusz Szwarc

  • DRS inspectors 3

Post Fire Safe Shutdown Training

  • Completed
  • NRC inspectors

2017 and 2018 Inspections

  • Monticello 2017007
  • Fermi 2017012
  • LaSalle 2017010
  • Duane Arnold 2018010
  • Palisades 2018011 & 2018415 (reports not issued)
  • Braidwood 2018013 (report not issued) 5

Upcoming Inspections

  • 2018

- Perry

  • 2019

- Byron

- Davis-Besse

- Prairie Island (NFPA 805)

- DC Cook (NFPA 805)

- Point Beach (NFPA 805)

- Quad Cities 6

Recent Findings and Violations

  • Inadequate Alternative Compensatory Measure
  • Fire Door Degraded Barrier
  • Inadequate Pre-Fire Plans
  • Inadequate AOP for SSD 7

Inadequate Alternate Compensatory Measure

  • Monticello 2017007
  • Identified during 2014 inspection
  • Replenishment of diesel fuel

Inadequate Appendix R Fire Barrier

  • Monticello 2017004
  • LER 2016002-02 Closeout
  • Fire causes CR evacuation

Fire Door Degraded Barrier

  • LaSalle 2017010
  • Fire door not engaged and pinned
  • Door lower pin missing and broken
  • Missed daily surveillance identification

Inadequate Pre-fire Plans

  • Duane Arnold 2018010
  • 2 Examples of deficient PFPs
  • PFPs lacking fire hazard information
  • Battery room and switchgear room

Inadequate AOP for SSD

  • Duane Arnold 2018010
  • Operator action to isolate RWCU due to fire
  • Operator action removed from AOP
  • Action required to meet NSCA

Clinton MSO URI Closure

  • Clinton 2017008
  • MSOs are a requirement
  • Licensee dispositioned identified MSOs
  • Analysis not limited to four components
  • SSD path components 13

Potential IP Changes

  • Triennial versus quadrennial
  • Self-assessments
  • Reduction in resources
  • FP as a program inspection
  • 2018 decision 14

Summary

  • Fire protection staff
  • Inspections
  • Findings
  • Inspection procedure changes 15

Thank You