ML18153D407
| ML18153D407 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 07/20/1993 |
| From: | Belisle G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 9308060083 | |
| Download: ML18153D407 (3) | |
Text
I JUL 2 0 1993 NOTICE OF SIGNIFICANT MEETING Name of Licensee:
Virginia Electric & Power Company Name of Facility: Surry Docket Numbers:
50-280 and 50-281 Date and Time of Meeting:
July 28, 1993 at 9:30 a.m.
location of Meeting: Atlanta, GA 30th Floor Conference Room RII Cognizant Division: Division of Reactor Safety Purpose of Meeting:
Results of Self Assessment of the Electrical Distribution System at Surry Nuclear Station NRC Attendees:
A. F. Gibson, Director, Division of Reactor Safety (DRS), RII C. A. Julian, Chief, Engineering Branch, DRS, RII M. B. Shymlock, Chief, Engineering Branch, Plant Systems Section, DRS, RII M. V. Sinkule, Chief, Reactor Projects Branch 2, Division of Reactor Projects (DRP), RII G. A. Belisle, Chief, Reactor Projects Section 2A, DRP, RII M. W. Branch, Senior Resident Inspector, Surry, RII H. N. Berkow, Director, Project Directorate II-2, Office of Nuclear Reactor Regulation (NRR)
B. C. Buckley, Senior Licensing Project Manager, Surry, NRR Licensee Attendees:
M. Bowling, Manager, Nuclear Licensing G. Flowers, Manager, Electrical Engineering A. Price, Assistant Station Manager, Nuclear Safety and Licensing 9308060083 930720 PDR ADOCK 05000280 p
Notice of Significant Meeting 2
JUL 2 0 1993 NOTE: Attendance by NRC personnel at this NRC/Licensee meeting should be made known by July 22, 1993 at 4:00 p.m., via telephone call to A. Belisle, (404) 331-4196.
Approved by:
Original signed by Distribution:
George A. Belisle, Chief Reactor Projects Section 2A Division of Reactor Projects J. H. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research G. C. Lainas, Assistant Director for Region II Reactors, NRR B. C. Buckley, Licensing Project Manager, NRR H. N. Berkow, Director, Project Directorate 11-2, NRR L. R. Plisco, Regional Coordinator, EDO H. L. Thompson, Jr., Deputy Executive Director for Nuclear Materials Safety Safeguards and Operation Support T. E. Murley, Director, Office of Nuclear Reactor Regulation J. G. Partlow, Associate Director for Projects S. A. Varga, Director, Division of Reactor Projects 1/11 bee:
S. D. Ebneter, RII L.A. Reyes, RII E.W. Merschoff, RII A. F. Gibson, RII A. B. Ruff, RII S. J. Vias, RII All NRC Attendees Public Document Room
- SEE PREVIOUS CONCURRENCE PAGE FOR SIGNATURES.
RII :DRP RII :DRP RII:DRP RII :DRS ARuff ABelisle MSinkule CJulian 07/ /93 07/ /93 07/ /93 07/ /93 RII :DRP EMerschoff 07/ /93 RII :DRS i~~
AGibson J. ~' ~-hi,<
07/ /93 1\\,µ1l fl
l Notice of Significant Meeting 2
NOTE: Attendance by NRC personnel at this NRC/Lice ing meeting should be made known by July 22, 1993 at 4:00 p.m., via te ephone call to A. Belisle, (404) 331-4196.
Approved by:
George A. Belisle, Chief Reactor Projects Section 2A Division of Reactor Projects Distribution:
J. H. Sniezek, Deputy Executi Director for Nuclear Reactor Regulation, Regional Operations and search G. C. Lainas, Assistant Di ctor for Region II Reactors, NRR B. C. Buckley, Licensing roject Manager, NRR H. N. Berkow, Director, roject Directorate II-2, NRR L. R. Plisco, Regional Coordinator, EDO H. L. Thompson, Jr., eputy Executive Director for Nuclear Materials Safety Safeguards and eration Support T. E. Murley, Dir ctor, Office of Nuclear Reactor Regulation J. G. Partlow, sociate Director for Projects S. A. Varga, D' ector, Division of Reactor Projects I/II bee:
bneter, RII
. Reyes, RII
. Merschoff, RI!
Gibson, RII Ruff, RII S. J. Vias, RII All NRC Attendees Public Document Room
- RIJjpRP AWi~sle 01 I itt/93
- RII,=A~ -
MSi~~
071,q /93
- RII :DR1S C~n 07/ /1_93 RII:DRtP EMerschoff 07/ /93
~~
07/ifP3