MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr ML18153A3421999-03-26026 March 1999 Provides Updated Medical Status Rept for Wb Gross in Accordance with License SOP-20476-02,Docket 55-5228,as Amended by 980320 License Amend.Informs That Gross Exhibits No Performance Problems & Will Continue on Current Medicine ML20204H0331999-03-17017 March 1999 Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 ML18153A3411999-03-15015 March 1999 Forwards Signed Applications & Medical Certificates for Initial License at Surry Power Station Units 1 & 2 for Listed Individuals.Without Encls 1999-09-08
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 12, 1992 Director, Office of Enforcement Serial No.: 92-475 U. S. Nuclear Regulatory Commission SPS/RCB/GDM R9 Attn.: Document Control Desk Docket Nos.: 50-280 Washington, D. C. 20555 50-281 License Nos.: DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NOS. 50-280/92-12 AND 50-281 /92-12 We have reviewed your letter dated July 13, 1992 which forwarded a Notice of Violation and a proposed imposition of a $50,000 civil penalty. Our reply to the Notice of Violation and a check for the payment of the civi.1 penalty are provided as attachments to this letter..
We concur that the configuration of the charging/high head safety injection pumps which led to the current violation was similar to that for which we were cited in NRC Inspection Report 91-24. However, we would like to reiterate that the two violations do not have similar root causes. The earlier violation occurred because manual operator intervention was accepted as an alternative to automatic action, whereas the second violation resulted from the inadequate development and . implementation of a procedure change.
- Station management sensitivity, at all levels, to adequately controlling the change process has been increased. Currently, a comprehensive review of the change control process is in progress at the station to evaluate management involvement and control. Any we_aknesses or shortfalls identified during this review will be evaluated, and appropriate enhancements will be made within the various programs that govern changes to procedures, programs, or plant systems. This review will be completed in September 1992 and briefed to the NRC resident inspectors .
ADOCK 6~ggb~eo PDR
- We have no objections to this reply being disclosed to the public.
If you have any further questions, please contact us.
Very truly yours,
~
q.Pcy/a..vJL-.
y W. L. Stewart . *
- Senior Vice President - Nuclear Attachments:
- 1. Reply to the Notice of Violation
- 2. Check for payment of the Civil Penalty Copy to: U. S. Nuclear Regulatory Commission Region II_
101 Marietta Street, N.W.
Suite 2900
- Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station
r -
REPLY TO A NOTICE OF VIOLATION NRC INSPECTION CONDUCTED MAY 11-18, 1992 SURRY POWER STATION UNITS 1 - AND 2 INSPECTION REPORT NOS, 50-280/92-12 AND 50-281/92-12 NRC COMMENT:
During an NRC inspection conducted on May 11-18, 1992, a violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (57 FR 5791, February 18, 1992), the Nuclear Regulatory Commission proposes to impose a civil penalty pursuant to Section 234 of the Atomic Energy Act of 1954, as amended_ (Act),
42 U.S.C. 2282, and 10 CFR 2.205. The particular violation and associated civil penalty are set forth below:
Technical .Specification 3.3.B.2 requires, in part, if two of the three charging pumps in a unit are out of service, one of the inoperable pumps shall be restored to an operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If one of the inoperable pumps is not restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, theri the reactor shall be shut down.
Contrary to the above, between May 1 and May 11, 1992, the charging pumps for Unit 1 were routinely aligned such that the "A" and "C".charging pumps were inoperable in excess of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the unit was not brought to shutdown.
This condition existed from about 10:11 p.m. on May 1, 1992 to 10:06 a.m. on May 7; from 5:55 p.m. on May 7, 1992 to 9:22 p.m. on May 9; and from 10:29 p.m. on May 9 to 9:30 a.m. on May 11.
This is a Severity Level Ill violation (Supplement I).
Civil Penalty - $50,000
REPLY TO A NOTICE OF VIOLATION NRC INSPECTION CONDUCTED MAY 11-18. 1992 SURRY POWER STATION UNITS l AND 2 INSPECTION REPORT NOS. 50-280/92-12 AND 50-281/92-12 Admission or Denial of the Alleged Violation The violation is correct as stated.
Reason for the Violation The violation resulted from the inadequate* preparation and implementation of a change to a startup procedure. Because of concerns which arose from an earlier Notice of Violation (NRG Inspection Report 50-280,281/91-24) that also involved charging pump alignment, the station had implemented a design change to simplify charging pump operation. This change directed placing the three charging pumps in the automatic mode, thus eliminating a previous restriction that no more than two pumps be in the automatic mode. Operators were trained on this new alignment and were expecting it to be in place when Unit 1 was restarted following the refueling
Prior to startup, station engineering personnel determined that the ventilation system needed to be tested prior to implementing the design change to verify the ability of the system to adequately ventilate the charging pump cubicles with the new pump alignment. Station management decided to perform the ventilation test after startup, and the previously referenced startup procedure was changed to return to the original pump alignment until ventilation testing could be completed. The change permitted Shift Supervisor discretion with regard to charging pump alignment pending validation of the ventilation system. Various charging pump manipulations were conducted during the startup process, and a pump alignment was inadvertently established which rendered the system vulnerable to a single mode failure. This configuration, which should have mandated entry into a twenty-four-hour Technical Specification action statement to shut do_wn for Unit 1, went undetected during several periods of critical plant operation between May 1 and May 11, 1992. Since the charging pump configuration was different from the alignment discussed in operator training, several operators in the control room questioned the charging pump alignment. However, an in-depth investigation was not conducted until May 11, 1992 when the improper configuration was discovered .
..... - ----=-
....... -=---~--:-C--.---:-.--c-::. .. C-C.
Corrective Steps Which Have Been Taken and the Results Achieved Upon discovery of the improper alignment, the Unit 1 charging pumps were immediately placed in- a configuration which comp1ied with the Technical Specifications, and the Unit 2 charging pump configuration was verified to be satisfactory. A Root Cause Evaluation (RCE) was conducted for this incident and provided corrective actions. The following corrective actions recommended by the RCE were implemented: *
- A Standing Order governing control of the undervoltage trip of the "A" Charging Pump was issued pending procedure revision. * * *
- The Control Room Minimum Equipment List was updated to address the "A" Charging Pump undervoltage configuration.
- "Caution" tags were placed o"n the main control boards.
- Applicable procedures were revised to specify proper pump configuration.
- Operating shifts were briefed on the event by station management.
These corrective steps assure that the charging pumps will remain in their proper
.configuration. Testing of the ventilation system to verify that the system could adequately ventilate the charging pump cubicles has also been performed, and the units are currently operating with the three charging pumps out of pull-to-lock.
Also, the policy on the *use of manual operator action in lieu of automatic initiation has been issued, and Quality Assurance management personnel are currently attending the Station Nuclear Safety and Operating Committee (SNSOC) meetings to monitor the change management process and the possible impact of changes being considered.
- Corrective Steps That Will be Taken to Avoid Further Violations As a result of this event, management sensitivity to the change control issue has been increased. Station management has initiated a review of the various processes which change or modify procedures, programs, or plant systems. The purpose of this review is to assure these processes receive adequate management oversight and that proper administrative controls are established. Included in these controls will be determination of ownership, accountability for change approval, and coordination among the various organizations involved with change. The responsibilities of SNSOC in the procedure change review process will be reviewed as part of this effort.
Upon completion of this review, an action plan will be developed to implement corrective actions identified and strengthen management* control over the change process .
' * * . Training on the policy on use of operator action in lieu of automatic initiation is in progress for SNSOC members and alternates, operating shifts, selected engineering groups, and procedure writers. This training is being conducted by the Assistant .
Station Manager for Nuclear Safety and Licensing to appr~se cognizant personnel of the provisions of the policy and their responsibilities with regard to these provisions.
The Date When Full Compliance Will be Achieved Full compliance was achieved on May 11, 1992, when proper pump configuration was restored. *
- An action plan to enhance the station's change control process will be implemented following the change control. review described above. Completion of the review is scheduled by September 30, 1992.
Training on the operator action policy is scheduled to be completed by September 30, 1992.