UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555 Docket Nos. 50-280 and 50-281 Mr. W. L. Stewart Senior Vice President - Nuclear Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060
Dear Mr. Stewart:
June 26, 1992
SUBJECT:
INSERVICE TESTING {1ST) PROGRAM RELIEF REQUEST - SURRY POWER STATION, UNITS 1 AND 2 {TAC NOS. M80297 AND M80298)
The purpose of this letter is to grant interim relief from Section XI of the ASME Boiler and Pressure Vessel Code for certain components in the control room envelope air conditioning system, which you identified in your March 22, 1991 submittal, as supplemented February 26, 1992.
You stated in your March 22, 1991 submittal that NRC Inspection Report Nos. 50-280/90-41 and 50-281/90-41, dated February 20, 1991, identified that these components were not properly classified in accordance with Regulatory Guide 1.26, Revision 3, and were not tested in accordance with the requirements of the above-cited Code.
Furthermore, you stated that these components have now been incorporated into your Section XI Inservice Testing Program.
The lack of instrumentation currently in the air conditioning system prevents you from full conformance with the ASME Code until the necessary instrumentation is purchased and installed.
As described in your submittals, you requested (1) to defer compliance with the Code requirements for relief requests P-16 and V-46 until the end of the Surry Unit 1 Cycle 12 refueling outage, scheduled for the second quarter of 1994, and (2) to approve an alternate. test method to measure chilled water pump{s) flow rates for relief request P-17.
As delineated in the enclosed Safety Evaluation, the staff has reviewed your relief requests and has determined that granting relief, pursuant to 10 CFR 50.55a(a){3)(i), (a)(3){ii) and {g){6){i), is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest.
In making this determination, the staff has considered the alternative testing being implemented, compliance resulting in 9207090290 920626 PDR ADOCK 05000280 p
PDR u
e Mr. W. June 26, 1992 a hardship without a compensatory increase in safety, and the impracticality of performing the required testing considering the burden if the requirements were imposed.
Therefore, the requested relief is granted.
Enclosure:
Safety Evaluation cc w/enclosure:
See next page DISTRIBUTION Docket File NRC & Local PDRs PD22 Rdg TMurley/FMiraglia JPartlow CRossi JLieberman SVarga GLainas HBerkow DMi 11 er OFFICE NAME OFFICIAL RECORD COPY FILENAME: SR80297.REL BBuckley OGC EJordan GHi 11 (8)
ACRS ( 10)
OPA Sincerely, (Original Signed By)
Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation OC/LFMB JWechselberger, 17G21 MS in ku 1 e, R II FGrubelich
I e
Mr. W. L. Stewart Virginia Electric and Power Company cc:
Michael W. Maupin, Esq.
Hunton and Williams Post Office Box 1535 Richmond, Virginia 23212 Mr. Michael R. Kansler, Manager Surry Power Station Post Office Box 315 Surry, Virginia 23883 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission Post Office Box 166, Route 1 Surry, Virginia 23883 Mr. Sherlock Holmes, Chairman Board of Supervisors of Surry Co~nty Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23209 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 C.M.G. Buttery, M.D., M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218 Surry Power Station Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219 Mr. E. Wayne Harrell Vice President - Nuclear Services Virginia Electric and Power Co.
5000 Dominion Blvd.
Glen Allen, Virginia 23060 Mr. J. P. O'Hanlon Vice President - Nuclear Operations Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060 Mr. Martin Bowling Manager - Nuclear Licensing Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060