Docket Nos. 50-280, 50-281
JAN 2 5
Virginia Electric and Power Company
ATTN:
Mr. W. L. Stewart
Senior Vice President - Nuclear
5000 Dominion Boulevard
Glen Allen, _VA
23060
Gentlemen:
SUBJECT:
r' il i'....
\\'
- -'---- r.=F"C1Al cop--~ -
'lP ~ t" I J
. . -.
' _, *.
~
~ .
1931
(NRC INSPECTION REPORT NOS. 50-280/90-39 AND 50-281/90-39)
This refers to the inspection conducted by W. Holland of this office on
October 28, -
December 29, 1990.
The inspection included a review of
activities authorized for your Surry facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the report .
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared to
be in violation of NRC requirements as specified in the enclosed Notice of
Violation (Notice).
With respect to Violation A and B, we are concerned that
the events associated with these vi o 1 a ti ons unnecessarily cha 11 enged the
actuation of emergency safeguards components.
The procedure upgrade verifica-
tion and validation process may need increased attention.
Violation C revealed
that design change controls and in-plant communication need to be stressed to
insure that required plant configurations are maintained.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when* preparing * your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2. 790 of the NRC
I s
11 Rul es of Practice,
11 a copy of
this letter and its enclosures will be placed in the NRC Public Document Room .
910211.0052 910125
f.s,IDtl]Q's1 'i:>>5000280
G
P'OR
l
Virginia Electric and Power Company
2
The response directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Ma,nagement" and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
Should you have any questions concerning this letter, please contact us.
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
E. W. Harrell
Vice President - Nuclear Operation~
Virgtnia Electric & Power Company
~
5000 Dominion Boulevard
Glen Allen, VA
23060
J.P. 0
1Hanlon
Vice President - Nuclear Services
Virginia Electric & Power Company
5000 Domini*on B~ulevard
Glen Allen, VA
23060
M. R. Kansl er
Station Manager
Surry Power Station
P. 0. Box 315
Surry, VA
23883
M. L. Bowling, Jr., Manager
Nuclear Licensing
Virginia Electric & Power Co.
5000 Dominion Boulevard
Glen Allen, VA
23060
cc w/encls cont'd:
(See page 2)*
Sincerely,
. ORIGINAL. SIGNED BY
/1.AARVH'..J V. SINKULE
Marvin V. Sinkule, Chief
Reactor Projects Branch 2
Division of Reactor Projects
- -.
Virginia Electric and Power Company
cc w/encls cont
1 d:
Sherlock ~6lmes, Chairman
Board of Supervisors of Surry County
Surry County Courthouse
Surry, VA
23683
w: T. Lough
Virginia Corporation Commissirin
Division of Energy Regulation
P. 0. Box 1197
Richmond, VA
23209
Micha~l W. Maupin
H~nton and Williams
P. 0. Box 1535
Richmond, VA
23212
C. M. G. Buttery, M*.D., M.P.H.
Department of Health
109 Governor Street
Richmond, VA
23219
Attorney General
Supreme Court*Building
101 North 8th Street
Richmond, VA
23219
Commonwealth of Virginia
~
v1/encls:
Document Control Desk
P. Fredrickson, RI I
B. Buckley, NRR
G. Jenkins, EICS
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 1, Box 166
Su fry, VA
23883
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 78-A
Mineral, VA
23117
DOCUMENT:
94EL 8682
3
JAN 2 5 1991