UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos. 50-280 50-281 50-338 50-339 Mr. Larry C. Kidd, Jr.

Supervisor of Electrical Engineering, Computers, and Programs October 25, 1990 Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, Virginia 23060

Dear Mr. Kidd:

I would like to take this opportunity to thank the Virginia Electric and Power Company for volunteering to participate in the Emergency Response Data System (ERDS).

I am sure that the implementation of ERDS will prove to be beneficial both to the NRC and to Virginia Power.

Enclosed you will find a survey designed to provide the hardware, communications, data point and administrative information necessary for our contractor to design the ERDS system interface and.data base for your plant.

Please note that one copy of the Data Point Library Reference File form (Enclosure 2) will be needed for each ERDS data point. This reference file will be used to provide physical significance to the numerical data transmitted over ERDS for members of the NRC emergency response organization.

Each reactor unit is treated as an individual plant by ERDS, therefore, a separate data feed is required for each of your units.

Please complete the enclosed survey and Data Point Library Reference File for each of your reactor units and return them to me with a copy to Tony LaRosa, the ERDS project manager at NUS/EI Division, at the following addresses:

John R. Jolicoeur U.S. Nuclear Regulatory Commission Mail Stop MNBB-3206 Washington, DC 20555 Tony P. LaRosa NUS Corporation EI Division 545 Shoup Ave.

P.O. Box 50736 Idaho Falls, Idaho 83405 I am enclosing a copy of the data concerning the North Anna and Surry plants which was provided to our contractor as a part of the ERDS feasibility study. Atft'J' 1/.v'f

/(

&00 ll'.u'*

ii 1~1,1r!l,,.r.

90 :L 102001- *:::

../.I:< 'I.

PDR At:11-11::'.i::- '?:21025

~

F

  • - -*P, 0.:,0002:30 Pr,,::

'\\ i)

~...

October 25, 1990 e This request is covered by Office of Management and Budget Clearance Number 3150-0150 which expires March 31, 1992.

The estimated average burden hours is 32 person hours per licensee response, including staff and management review and preparation of the requested response. These estimated average burden hours pertain only to those identified response-related matters and do not include the time for any follow on implementation.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, DC 20555; and to the Paperwork Reduction Project (3150-0150),

Office of Management and Budget, Washington, DC 20503.

I am looking forward to working with you to ensure a smooth implementation of EROS at your plants. If you have any questions, please contact Tony LaRosa at (208) 524-9227 or me at (301) 492-4155.

Again thank you for your continued support of the EROS program.

Enclosures:

Sincerely, Original signed by:

John R. Jolicoeur Incident Response Branch Division-of Operational Assessment Office for Analysis and Evaluation

1.

EROS Communications Descriptions and Survey Questionnaire

2.

Data Point Library Reference File *

3.

Data Point Library Reference File Definitions

48. Critical Safety Function Parameters for BWRs 4P. Critical Safety Function Parameters for PWRs
5.

Engineering Units Coding Scheme

6.

Zero Reference Coding Scheme

7.

Coding Scheme for Unit Name and Unit ID

8.

Computer Point Selection

9.

Data from EROS Feasibility Study cc w/encl:

T. LaRosa See next page DISTRIBUTION ELJordan GGZech RFPriebe IR~EOD JRJolicoeur 10/25'/90 ms w/o encl DFRoss IRB R/F

~CS*

DOA R/F JRJolicoeur MTaylor, EDO I~A:AEOD R~be 104,.t/90 NRC PDR BCBuckley, NRR Local PDR ATBoland, RII

~A:AEOD 10/~90