Forwards Safety Evaluation Disapproving Util Responses to Station Blackout Rule.Revised Response Addressing Areas of Nonconformance Requested within 60 Days
ML18153C402
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/15/1990
From: Buckley B
Office of Nuclear Reactor Regulation
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18152A162 List:
References
TAC-68611, TAC-68612, NUDOCS 9010250051
Download: ML18153C402 (3)


Text

l I

I UNITED STATES e

NUCLEAR REGULATORY COMMISSION Docket Nos. 50-280 and 50-281 Mr. W. L. Stewart WASHINGTON, D. C. 20555 October 15, 1990 Senior Vice President - Nuclear Virginia Electric and Power Company 5000 Dominion Blvd.

Glen Allen, Virginia 23060

Dear Mr. Stewart:

SUBJECT:

SAFETY EVALUATION OF THE SURRY POWER STATION RESPONSE TO THE STATION BLACKOUT RULE (TAC NOS. 68611 and 68612)

By letters dated April 17, 1989, April 20, 1989, March 30, 1990 and August 1, 1990, you submitted responses to the Station Blackout (SBO) rule for Surry Power Station, Units 1 and 2. The responses were reviewed by an NRC contractor, SAIC and the NRC staff. Enclosed is our Safety Evaluation (SE) based on your responses, and the associated SAIC Technical Evaluation Report (TER)

SAIC-90/1371, "Surry Power Station, Units 1 and 2, Station Blackout Evaluation,"

dated September 24, 1990 (Attachment 1 of the enclosure).

The staff has reviewed the proposed actions described in your submittals and finds that they do not conform to the guidance on the use of existing emergency diesel generators as an alternate AC power source as documented in 10 CFR 50.63, Regulatory Guide (RG) 1.1555 Position C.3.3.5, NUMARC 87-00 Section 2.3.1(3),

and NUMARC 87-00 Supplemental Questions and Answers dated December 27, 1989.

The areas of non-conformance are identified in the enclosed SE.

The guidance provided on Technical Specifications (TS) for an SBO states that the TS should be consistent with the Interim Corrmission Policy Statement on Technical Specifications. The staff has taken the position that TS are required for SBO response equipment. However, the question of how specifications for the SBO equipment will be applied is currently being considered generically by the NRC in the context of the Technical Specification Improvement Program and remains an open item at this time.

In the interim, the staff expects plant procedures to reflect the appropriate testing and surveillance requirements to ensure the operability of the necessary SBO equipment.

If the staff later determines that TS regarding the SBO equipment is warranted, you will be notified of the imple-mentation requirements.

l Mr. W. October 15, 1990 A revised response to the SBO rule which addresses the areas of non-conformance should be submitted for staff review within 60 days of receipt of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore, 0MB clearance is not required pursuant to P. L.96-511.

Enclosures:

As stated cc w/enclosures:

See next page :

Sincerely, Bart Buckley, Senior Project Manager Project Directorate II-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation DISTRIB~TION: Docket File, NRC&Local PDRs, PDll-2 r/f SVar a DM1ller~ BBuc~ley, OGC(info.only), EJordan, ACRS(lO), 'HBerk~w' GLainas OFC

PDil-2/LA
PDII-~P,kti)_. !PDII-2/D_~-~

-. :SELB ~tr :.


:~------------: -----,Q:.~~---: -~~--.----: --------------: --------------: ------------

NAME i

BBuckley
HBevgw'
FRosa

:- --------------:--~~7.:--------:--------------:---.-----------:--------------:------------

-DATE *:

/('v/90

fO/f)/90

... ': /1J/ r5fgo

/O //ii/90 FFICIAL RECORD COPY Document Name:

TAC NOS.68611 AND 68812 SURREY

_j I

I

(

I e

Mr. W. L. Stewart Virginia Electric and Power Company cc:

Michael W. Maupin, Esq.

Hunton and Williams Post Office Box 1535 Richmond, Virginia 23212 Mr. Michael R. Kansler, Manager Surry Power Station Post Office Box 315 Surry, Virginia 23883 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Conunission Post Office Box 166, Route 1 Surry, Virginia 23883 Mr. Sherlock Holmes, Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Mr. W. T. Lough Virginia Corporation Conunission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23209 Regional Administrator, Region II U.S. Nuclear Regulatory Conunission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 C. M. G. Buttery, M.D., M.P.H.

Department of Health 109 Governor Street Richmond, Virginia 23219 Surry Power Station Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219 Mr. E. Wayne Harrell Vice President - Nuclear Operations Virginia Electric and Power Company 5000 Dominion Blvd.

Glen Allen, Virginia 23060 Mr. J. P. O'Hanlon Vice President - Nuclear Services Virginia Electric and Power Company 5000 Dominion Blvd.

Glen Allen, Virginia 23060 Mr. R. F. Saunders Manager - Nuclear Licensing Virginia Electric and Power Company 5000 Dominion Blvd.

Glen Allen, Virginia 23060