ML18153B885
| ML18153B885 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 08/31/1989 |
| From: | Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8909140164 | |
| Download: ML18153B885 (1) | |
Text
q-::.,;:
.. _(,(..)
._.,=,
,::,er q-(!
..-i O**.
,::1 er:
l)*.Q CO LL LL AUG 3 1 1989 NOTICE OF SIGNIFICANT MEETING Name of Licensee:
Virginia Electric and Power Company Name of Facility: Surry Docket Nos.:
50-280 and 50-281 Date and Time of Meeting:
September 1, 1989, at 11:00 a.m.
Location of Meeting:
Region II, Atlanta, Georgia Purpose of Meeting:
Management meeting to discuss Unit 2 restart and also maintenance issues which have been identified for both units.
NRC Attendees:
S. Ebneter, *Regional Administrator, Region II (RII)
L. Reyes, Director, Division of Reactor Projects (DRP), RII A. Gibson, Director, Division of Reactor Safety, RII M. Sinkule, Chief, Reactor Projects Branch 2, DRP, RII P. Fredrickson, Chief, Reactor Section 2A, DRP, RII L. Engle, Project Manager, NRR Licensee Attendees:
W. Stewart, Senior Vice President, Nuclear W. Cartwright, Vice President, Nuclear Operations M. Kansler, Station Manager, Surry R. Saunders, Manager, Nuclear Programs and Licensing E. Grecheck, Assistant Station Manager, Surry D. Sommers, Supervisor, Licensing NOTE:
Attendance by NRC personnel at this NRG/Licensee meeting should be made known by 1:00 p.m., August 31, 1989, via telephone call to S. M. Shaeffer at FTS:
841-3641.
Approved By:
Original signed by P. E. Fredrickson (for)
M. V. Sinkule, Chief Reactor Projects Branch 2 Distribution: J.M. Taylor, Acting Executive Director for Operations J. H. Sniezek, Deputy Director, NRR J. Lieberman, Director, Office of Enforcement G. C. Lainas, Assistant Director, for Region II Reactors, NRR R. W. Borchardt, Regional Coordinator, EDO L. B. Engle, Licensing Project Manager, NRR B. C. Buckley, Licensing Project Manager, NRR bee:
NRC Resident Inspector NRC Section Chief NRC Project Engineer*
Document Control Desk RI~P~
~~r 08/J/ /89 RII:n PFr!d~ickson 08/?1 /89 RII.M--
MS(nkule 08/1 /89 ofJfr*dA~
RII: RA BGrimes 08/ /89