Forwards Insp Repts 50-280/94-28 & 50-281/94-28 on 941002-1105 & Notice of Violation.Violation of Concern Because After Procedure Shown to Be Unworkable,Personnel, on Two Occasions,Failed to Stop & Revise Flawed Procedure
ML18153B176
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/02/1994
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: O'Hanlon J
Virginia Power (Virginia Electric & Power Co)
Shared Package
ML18152A260 List:
References
NUDOCS 9412130087
Download: ML18153B176 (3)


See also: IR 05000280/1994028

Text

...

December 2, 1994

Virginia Electric and Power Company

ATTN: Mr. J. P. O'Hanlon

Senior Vice President-Nuclear

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA

23060

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-280/94-28 AND 50-281/94-28)

Gentlemen:

This refers to the inspection conducted by M. Branch of this office on

October 2 through November 5, 1994.

The inspection included a review of

activities authorized for your Surry facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress ..

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

The violation for failure to follow station

administrative instructions when modifying charging pump temperature control

valve positioners is of concern because on two occasions, personnel failed to

stop the job and revise the procedure after it was identified that work

instructions could not be followed.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence.

After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

Pursuant to 10 CFR 2.790 of the NRC's Rules of Practice", a copy of this

letter and its enclosure will be placed in the NRC Public Document Room.

Accordingly, your response should not, to the extent possible, include any

personal privacy, proprietary, or safeguards information so it can be released

to the public and placed in the NRC Public Document Room .

9412130087 941202

PDR

ADOCK 05000280

G

PDR

OFFICIAL COPY

\\\\\\

VEPCO

2

The response directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Docket Nos. 50-280, 50-281

License Nos. DPR-32, DPR-37

Sincerely,

Orig signed by David M. Verrelli

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosures: 1.

2.

Notice of Violation

NRC Inspection Report

cc w/encls: M. L. Bowling, Manager

Nuclear Licensing & Programs

Virginia Electric & Power Company

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA

23060

David A. Christian

Station Manager

Surry Power Station

P. 0. Box 315

Surry, VA

23883

Ray D. Peace, Chairman

Surry County Board of Supervisors

P. 0. Box 130

Dendron, VA

23839

Dr. W. T. Lough

Virginia State Corporation Commission

Division of Energy Regulation

P. 0. Box 1197

Richmond, VA

23209

Michael W. Maupin

Hunton and Williams

Riverfront Plaza, East Tower

951 E. Byrd Street

Richmond, VA

23219

cc w/encls continued:

See page 3

SEND

TO

PDR?

fYe'?J

-

VEPCO

cc w/encl s:

Continued

Robert B. Strobe, M.D., M.P.H.

State Health Commissioner

Office of the Commissioner

Virginia Department of Health

P. 0. Box 2448

Richmond, VA

23218

Attorney General

Supreme Court Building

101 North 8th Street

Richmond, VA

23219

Distribution w/encls:

B. Buckley, NRR

L. Shotkin, NRR

G. Hallstrom, RII

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Surry Nuclear Power Station

5850 Hog Island Road

Surry, VA

23883

Inspector

NRC Resident

U.S. Nuclear

Route 2, Box

Mineral, VA

Regulatory Commission

78-A

23117

OFC

RI!

RI!

NAME

LGarner IA.IC--

ABelisle

G, t,,.d;. F?.. -

DATE

12/ &!/ /94

12/ c, J /94

No COPY? re0

No

Yes

(N;)

3

I

Yes

OFFICIAL RECORD COPY

DOCUMENT NAME:

G:\\SUR9428.RPT

/94

I

/94

I

/94

No

Yes

No

Yes

No