M~,Y 2 6 1994
Docket Nos. 50-280, 50-281
Virginia Electric and Power Company
ATTN: Mr. W. L. Stewart
Senior Vice President - Nuclear
5000 Dominion Boulevard
Glen Allen, VA
23060
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-280/94-11 AND 50-281/94-11)
This refers to the inspection conducted by M. Branch of this office on April 3
through May 7, 1994.
The inspection included a review of activities
authorized for your Surry facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violation is of concern, in that, the lack of
adequate engineering controls resulted in operation above your authorized
licensed power limit for a period of seven hours and twelve minutes.
You are required to respond to this letter and should follow the instructions
specified in the. enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
Pursuant to 10 CFR 2.790 of the NRC's "Rules of Practice", a copy of this
letter and its enclosures will be placed in the NRC Public Document Room.
Accordingly, your response should not, to the extent possible, include any
personal privacy, proprietary, or safeguards information so that it can be
released to the public and placed in the NRC Public Document Room.
9406060214 940526
ADOCK 05000280
G
Virginia Electric and
Power Company
2
MAY 2 6 i994
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
M. L. Bowling, Jr., Manager
Nuclear Licensing
Virginia Electric & Power Company
5000 Dominion Boulevard
Glen Allen, VA
23060
M. R. Kansler
Station Manager
Surry Power Station
P. 0. Box 315
Surry, VA
23883
Ray D. Peace, Chairman
Surry County Board of Supervisors
P. 0. Box 130
Dendron, VA
23839
Dr. W. T. Lough
Virginia State Corporation Commission
Division of Energy Regulation
P. 0. Box 1197
Richmond, VA
23209
Michael W. Maupin
Hunton and Williams
Riverfront Plaza, East Tower
951 E. Byrd Street
Richmond, VA
23219
cc w/encls:
{Cont'd on page 3)
Sincerely,
Js/
David M. Verrelli, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Virginia Electric and
Power Company
cc w/encls cont'd:
Robert 8. Strobe, M.D., M.P.H.
State Health Commissioner
Office of the Commissioner
P.O. Box 2448
Richmond, VA
23218
Attorney General
Supreme Court Building
101 North 8th Street
Richmond, VA
23219
bee w/encls:
G. Bel isle, RII
L. Garner, RII
8. Buckley, NRR
J. Beal 1, OE
J. Lieberman, OE
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Surry Nuclear Power Station
5850 Hog Island Road
Surry, VA
23883
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 78-A
Mineral, VA
23117
RII :DRP
tw(;
LGarner
5/'rv/94
3