e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 22, 1997 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 90 DAY INSERVICE INSPECTION
SUMMARY
REPORT SUPPLEMENTAL RESPONSE Serial No.
NLOS/GDM Docket No.
License No.
97-311A RO 50-280 DPR-32 Virginia Electric and Power Company submitted the lnservice Inspection Report for Surry Power Station Unit 1 for the 1997 refueling outage in our letter dated July 21, 1997 (Serial No.97-311 ).
This report provided a summary of the examinations performed during the outage for the third inservice inspection interval. Attachment 3 of that submittal included information proprietary to Westinghouse which was used to evaluate the indications on steam generator "B" weld 2-06. However, this document should not have been included in our submittal without the appropriate restriction on public disclosure in accordance with 10 CFR 2.790. In a subsequent telephone call with Mr. Gordon E. Edison of your staff, we requested that the proprietary document be withheld from public disclosure.
To correct this error, we are providing herein as Attachment 1, the proprietary Westinghouse information. This information is supported by.an-affidavit (Attachment 2) signed*.by Mr... H.. A... Sepp, Manager -
Regulatory arid Licensir:ig Engineering, Westinghouse Electric *company.
This affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission, and addresses the considerations listed in 10 CFR 2.790. Accordingly, it is requested that Attachment 1 of this letter, which contains information proprietary to Westinghouse, be withheld from public disclosure in accordance with 10 CFR 2.790.
In compliance with the guidelines of NUREG-0390, a copy of Attachment 1 in which the proprietary information has been removed is also being provided as Attachment 3.
We regret this error and any inconvenience it may have caused.
questions orrequire additional information, please contact us.
Very truly yours,, *- -
9712300374 971222 PDR ADOCK 05000280 G
PDR oZJ ~CU<,n-~
R. F. Saunders Vice President - Nuclear Engineering and Services
- t,..
_v*i:r1 J...I. Tc.. 1::;; IJ.-t.../ 0/2H.. :1i ""'
I Ji
"-1 0 f:\\- c..
(: ('Q.li'Yt,f 1'-I le c.. p O [1,.-
I I!
If you have any
Attachments cc:
U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station Commitments included in this letter:
None e